Skip to main content

Sé el Primero, Construye Relaciones Duraderas

City Commission Discussion Workshop - Golden Gem

City of Apopka

Latest meetings

Apopka City Commission Discussion Workshop 06/17/26

This document is a workshop agenda for the Apopka City Commission meeting on June 17, 2026. It lists discussion items including an update on 'Golden Gem' presented by Vladimir Simonovski, Public Works Director. Other items for future discussion include pioneering agreements, transportation projects, citizen advisory committees, utility infrastructure and planning, the comprehensive plan, and database software for commission votes. A public comment period is also scheduled. No specific projects with addresses, sizes, or zoning changes are detailed in this agenda.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda

Apopka City Commission Discussion Workshop 06/17/26

The Apopka City Commission held a workshop on June 17, 2026, to discuss the Golden Gem Reclaim Water Facility. This project is a multi-phase, multi-year infrastructure investment supporting Apopka's growth and addressing regional reclaimed water demand and scarcity. It aligns with the regional water strategy, supports environmental goals by reducing nitrogen and eliminating raw wastewater discharge, and recycles 100% of Apopka's wastewater. The project involves a partnership with SJRWMD, which purchased 100 acres for the facility, and includes interlocal agreements with Sunshine Water, Orange County, City of Altamonte Springs, and City of Mount Dora. Completed components include East Pond (2021) and West Pond (2023). Current construction involves a Distribution Pump Station, with bid opening on June 30, 2026, and construction starting before September 1, 2026, for an 18-month duration. Ongoing work includes pond reconstruction, with conceptual design for West Pond released June 5, 2026, and final design expected late August 2026. Next steps include starting design of East Pond in September 2026, starting construction of West Pond in September/October 2026, completing West Pond reconstruction by March 2027, and completing East Pond design by April/May 2027. The East Pond reconstruction completion date is to be determined. The workshop also included a public comment period. Tetra Tech and Ardaman & Associates are involved in the pond reconstruction design, addressing issues like liner seam failures, deterioration, and soil protrusions. Design solutions include specifying liner subgrade requirements, gas release pathways, using a textured HDPE geomembrane liner, and providing protective soil cover. Groundwater level characterization is ongoing to support design modifications.

Board:
City Commission Discussion Workshop - Golden Gem
Date:
2026-06-17
Type:
Agenda_packet
Decision:
Workshop discussion (no formal decision stated)
Applicant:
City of Apopka

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis