DRC Agenda Packet 04/15/2026
Development Review Committee Meeting · 2026-04-15 · agenda_packet
[Multiple locations including 10 North Forest Avenue, 2121 East Semoran Boulevard, Edwards Field, 3710 Jason Dwelley Parkway, Boyscout Road, West Kelly Park Road, 1315 Jack Junction Way, 3910 Jason Dwelley Parkway.; case SPX-26-4, MDP-26-2, MDP-25-14, CSP-26-15, CSP-26-9] Apopka Art and Foliage Festival at Kit Land Nelson Park, 10 North Forest Avenue, on April 25th-26th, 2026. Apopka Florist Grand Opening at 2121 East Semoran Boulevard on May 3rd, 2026. Apopka PD Personal Safety Day in the Park at Kit Land Nelson Park, 10 North Forest Avenue, on May 9th, 2026. Apopka PD Shred Event at Edwards Field, E 1st Street, on June 6th, 2026. Sundown Presents LLC Tailgate N' Tunes at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on June 6th, 2026. The Gina Reynolds Foundation 5K at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on October 31st, 2026. A Special Exception Use (SPX) for a 120-foot stealth wireless telecommunications tower at parcel 13-20-27-4300-01-000. A Major Development Plan (MDP) for The Ridge PD Parcel 3, located on Boyscout Road, proposing 363 multi-family dwelling units. A Major Development Plan (MDP) for Wyld Oaks C-Store at West Kelly Park Road between Effie Drive and Highway 429, proposing a 1.24-acre commercial development with a 6,300 SF multi-tenant building and 16 fuel pumps. A Construction Site Plan (CSP) for Logistics 429 at Apopka Ridge Buildings 400, 500 & 600 at 1315 Jack Junction Way, for construction of buildings in Phase 2. A Construction Site Plan (CSP) for Apopka Northwest Recreation Complex - Phase 4 Soccer Fields at 3910 Jason Dwelley Parkway, proposing six soccer pads in three phases. [W Kelly Park Road between Effie Drive and HWY 429] Preliminary Development Plan for Wyld Oaks C-Store, a convenience store project. The project involves construction of infrastructure for the convenience store. The site is located on W Kelly Park Road between Effie Drive and Highway 429 in Apopka, FL. The applicant is M & R United, Inc. The project area is 1.24 acres, with 1.24 acres to be disturbed. The plan includes paving, grading, drainage, utilities, and erosion control measures. Groundwater is anticipated, and contractors must include consideration for this in their bids. The plans are preliminary and not for construction, permit, or bidding purposes. [KELLY PARK ROAD; case C-451] This document details utility plans and specifications for the Wyld Oaks C-Store project, including paving, grading, and drainage. It specifies materials and installation requirements for water, sanitary sewer, and storm sewer systems, as well as electrical and communication lines. The project involves extensive coordination with existing utilities and adherence to City of Apopka standards. A key note for contractors is the anticipation of groundwater presence, which must be factored into bids. The document also includes details on truck movement plans for delivery and fire trucks, and general construction notes covering safety, testing, erosion control, and site work. This document outlines construction requirements, permit obligations, and utility coordination for contractors. It details specifications for excavation, dewatering, paving, erosion and sediment control, stormwater pollution prevention, and the installation of water and reclaimed water distribution systems. Key requirements include obtaining all necessary permits, adhering to strict erosion and sediment control measures, preparing and implementing a Stormwater Pollution Prevention Plan (SWPPP), and complying with utility separation requirements. Specific details are provided for pipe materials, joint types, casing pipe dimensions for jacking and boring, and record drawing submittal procedures. The project involves a total site area of 29 acres, with the entire area impacted by construction. The receiving waters are the Saint Johns River, and the MS4 operator name is not stated. The project location is at latitude 28°48'25.19"N. and longitude 81°16'25.78"W. [3910 Jason Dwelley Pkwy, Apopka, Orange County, FL] This document contains detailed specifications for water, sewer, fire protection, storm sewer, paving, sidewalks, and curbing construction, as well as traffic control and stormwater pollution prevention plans. It outlines material requirements, installation procedures, testing protocols, and maintenance standards for various underground utilities and surface infrastructure. Specific details include pipe types (PVC, ductile iron, RCP), valve specifications, backfill requirements, concrete strengths, and testing pressures. The document also addresses traffic control measures, erosion and sediment control best management practices (BMPs), dust control, and waste management. The project is located in Apopka, Orange County, Florida, and involves the expansion of the Apopka Northwest Recreation Center soccer fields. [Apopka, Orange County, FL; case 2501352] Project involves the expansion of the Apopka Northwest Recreation Center Soccer Fields. The project includes site preparation, grading, utility work, and the construction of soccer fields, emergency lanes, parking areas, and fencing. Specific construction details include the installation of PVC sleeves, rolled sod, sprigged fields, and concrete/asphalt ADA parking stalls. The project is divided into three phases: Phase 1 includes emergency lanes and fencing; Phase 2 includes soccer fields and sprigged areas; Phase 3 includes additional soccer fields, sprigged areas, and expanded parking.
Follow this across meetings
Applicants and firms
Locations
- Multiple locations including 10 North Forest Avenue, 2121 East Semoran Boulevard, Edwards Field, 3710 Jason Dwelley Parkway, Boyscout Road, West Kelly Park Road, 1315 Jack Junction Way, 3910 Jason Dwelley Parkway.
- W Kelly Park Road between Effie Drive and HWY 429
- KELLY PARK ROAD
- 3910 Jason Dwelley Pkwy, Apopka, Orange County, FL
- Apopka, Orange County, FL
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis