Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Agenda Full Package (PDF)

City Council – Regular Meeting · 2026-05-06 · agenda

[case BPW23123MR] Resolution 50-26 amends Resolution 41-24 to authorize additional purchase and delivery of ready-mix concrete for Florida Department of Transportation (FDOT) grant-related projects to QE Concrete, LLC, and for non-grant related projects to both QE Concrete, LLC and Jot & Tittle Concrete, LLC, with an annual amount not to exceed $550,000. The contract ends on February 11, 2027. [case RFP2024-017] Resolution 89-26 approves Contract No. PPW263MR with Genuine Parts Company Doing Business As NAPA Auto Parts for fleet and facility vendor managed inventory integrated business solutions to obtain vehicle and equipment repair parts. The annual amount is $2,300,000, not to exceed budgetary limits. The contract commences upon approval through September 16, 2029, with an option to renew for up to two additional five-year periods. Resolution 95-26 approves the Federal Financial Assistance Subrecipient Agreement between the Florida Department of Agriculture and Consumer Services and the City of Cape Coral, authorizing the acceptance of $50,000 in grant funds to retain a consultant for the creation of a Citywide GIS tree inventory software. The City will provide a matching contribution of $50,000, for a total project value of $100,000. The duration is from grant execution through June 30, 2027. [1031 SE 9th Place, Unit 3] Resolution 99-26 approves the First Amendment to Lease Agreement between Zelazny Properties, LLC and the City of Cape Coral for the use of a portion of the building located at 1031 SE 9th Place, Unit 3. The estimated dollar value for the initial three-year term is $298,152.00, including estimated CAM fees. The lease has an option to renew for an additional term up to three years. Resolution 107-26 approves an Economic Development Incentive Participation Agreement between the City of Cape Coral and Architectural Metal Flashings, LLC, authorizing a Business Infrastructure Grant award of $132,862.00 for the expansion of an existing manufacturing facility. Resolution 108-26 approves an Economic Development Incentive Participation Agreement between the City of Cape Coral and Cape Coral Real Estate, LLC, authorizing a Business Infrastructure Grant award of $221,914.00 for the construction of a commercial building. [North 1 UEP – Contracts 8, 9, and 10] Resolution 110-26 approves the Grant Agreement between the State of Florida Department of Environmental Protection and the City of Cape Coral for grant funding of $1,388,907.50 for the North 1 UEP – Contracts 8, 9, and 10 Catch Basin Modifications. No matching funds are required by the City. Construction substantial completion is expected in December 2027. [Ceitus-Orchid-SW 22nd Terrace; case BPW2647KMR] Resolution 113-26 awards Bid No. BPW2647KMR to Southern Striping Solutions, LLLC, for the Ceitus-Orchid-SW 22nd Terrace Sidewalk Improvement Project. The contract amount is $1,295,603.30, with an additional $64,780.17 for City-controlled contingency, totaling $1,360,383.47. The project duration is 180 calendar days after the Notice to Proceed. [Trafalgar Parkway; case 26502104] Resolution 116-26 authorizes an increase of $149,904.98 to Purchase Order No. 26502104 with Guymann Construction, Inc., for the replacement of a 20-inch potable water main along Trafalgar Parkway, including repair or replacement of nearby valves. The total Purchase Order increases from $99,996.34 to $249,901.32. The duration is 180 Calendar Days. [3300-3510 Tropicana Parkway and 3301-3513 NW 7th Terrace; case VAC26-000001] Resolution 91-26 provides for the vacation of plat for a portion of alley right-of-way and easements located between Lots 1-41 and 42-82, Block 4185, Unit 59, properties at 3300-3510 Tropicana Parkway and 3301-3513 NW 7th Terrace. The total area is 33,586.5 sq. ft. City Planning Staff and Hearing Examiner recommended approval with conditions. [3246-3322 NW 16th Terrace and 3235-3327 Gulfstream Parkway; case VAC26-000002] Resolution 92-26 provides for the vacation of plat for a portion of alley right-of-way and underlying easements between Lots 1-21 and 22-43, Block 4278, Unit 61, and interior platted easements within Lots 19-21 and 22-26, Block 4278, Unit 61, properties at 3246-3322 NW 16th Terrace and 3235-3327 Gulfstream Parkway. The total area is 17,584.6 sq. ft. City Planning Staff recommended approval with conditions, and the Hearing Examiner recommended approval. [1009-1303 Kismet PKWY E; case FLUM25-000009] Ordinance 1-26 amends the City of Cape Coral Comprehensive Plan by changing the Future Land Use Map for a portion of land in Section 30, Township 43 South, Range 24 East, from Mixed-Use (MX) to Light Industrial (I), and from Mixed Use (MX) to Natural Resources/Preserve (PR). The affected area is 69.99 Acres, located at 1009-1303 Kismet PKWY E. City Planning Staff and Planning & Zoning Commission recommended approval. [North 1 East area] Ordinance 24-26 authorizes the issuance of not to exceed $110,000,000 in aggregate principal amount of Utility Improvement Assessment Bonds (North 1 East Area), Series 2026, to finance and refinance the development, construction, and installation of potable water, wastewater, and irrigation water utility capital improvements within the North 1 East area. Special assessment proceeds will secure the bonds, with potential use of net revenues from the water and sewer utility system. [North 1 East Area] Resolution 96-26 authorizes the issuance of not exceeding $110,000,000 in aggregate principal amount of utility improvement assessment bonds (North 1 East Area), Series 2026, to finance and refinance the development, construction, and installation of potable water, wastewater, and irrigation water utility capital improvements within the North 1 East Area. Pledges special assessment proceeds and allows for the use of net revenues from the City’s water and sewer utility system to secure payment. Ordinance 25-26 authorizes the issuance of not to exceed $100,000,000 in aggregate principal amount of Water and Sewer Revenue Bonds, Series 2026, to finance and refinance costs of acquisition, construction, and equipping of various capital improvements to the City’s water and sewer utility system. Pledges described funds to secure payment. Resolution 105-26 supplements Resolution No. 98-86, authorizing the issuance of not to exceed $100,000,000 in aggregate principal amount of Water and Sewer Revenue Bonds, Series 2026, for financing and refinancing costs of acquisition, construction, and equipping of various capital improvements to the City’s water and sewer utility system. Authorizes a negotiated sale and delegates authority for execution of agreements. [400 Santa Barbara Boulevard (Sun Splash Waterpark)] Ordinance 26-26 approves the Consent to Assignment and Assumption of Lease Agreement and Estoppel Certificate, assigning the Lease Agreement from PPW Cape Coral, LLC, to Ripley’s Sun Splash Waterpark, LLC, for property located at 400 Santa Barbara Boulevard, known as Sun Splash Waterpark. [1620 SE 46th Street; case RZN25-000010] Ordinance 22-26 (RZN25-000010) proposes rezoning property located at 1620 SE 46th Street, described as Lots 9, 10, and 11, Block 350, Cape Coral Unit 7, from Residential Multi-Family Low (RML) to South Cape (SC) zone. The applicant is BPMP Consulting Inc. The request is for one parcel totaling 0.41 Acres (17,989 SF). City Planning Staff and Hearing Examiner recommended approval. [1513 Gleason Parkway; case RZN24-000014] Ordinance 23-26 (RZN24-000014) proposes rezoning property located at 1513 Gleason Parkway, described as Lots 9 through 14, Block 3230, Cape Coral Unit 66, from Professional Office (P-1) to Commercial (C) zone. The applicant is Courtney Neuhausel. The request is for one property totaling 28,938 sq. ft. The Hearing Examiner recommended approval. [Citywide Median Curbing Improvement Project] Resolution 42-26 awarded a quote to Burnt Store Recycling, LLC, for the purchase of fill dirt for the Citywide Median Curbing Improvement Project at $9.00 per cubic yard, for an estimated annual amount of $135,000, not to exceed budgetary limits. The duration is FY2026. Resolution 81-26 authorizes Subrecipient Agreements for 2025-2026 State Housing Initiatives Partnership Grant Program Funds between the City of Cape Coral and Habitat for Humanity of Lee and Hendry Counties, Inc., and Rebuilding Together Greater Florida, Inc. The total dollar value is $722,307. The duration is until 6/30/2028. [Lake Kennedy Senior Center; case QPW2694MR] Resolution 84-26 awards Quote No. QPW2694MR to Salty Roofing and Sheet Metal, Inc. (Target Roofing) for Roof Replacement and Carport Repair at Lake Kennedy Senior Center. The contract amount is $160,341.89, including $8,017.09 for contingency. The duration is 120 calendar days after Notice to Proceed. [16470 Tamiami Trail, Punta Gorda, Florida 33955 (Southwest Reservoir); case 26501996] Resolution 87-26 authorizes an increase to Purchase Order No. 26501996 with Mason Evans, Inc. (Diamond Investigations and Security) to provide security services at the Southwest Reservoir located at 16470 Tamiami Trail, Punta Gorda, Florida 33955. The increase is $150,000, bringing the total Purchase Order to $249,000. The duration is through September 30, 2026. [Pelican Baseball Complex; case RPW2371 MM-B (Master Agreement)] Resolution 88-26 approves Work Authorization Form No. AB-07 with AREX Builders Corp., utilizing Master Agreement No. RPW2371 MM-B, for Renovations to the Pelican Baseball Complex, associated with Project Sparkle, for a Guaranteed Maximum Price of $655,705.25. The duration is 135 calendar days after the Notice to Proceed. [124 Cape Coral Parkway West; case RZN25-000006] Ordinance 16-26 proposes rezoning property located at 124 Cape Coral Parkway West, described as Lots 20 and 21, Block 163, Cape Coral Unit 3, from Residential Multi-Family Low (RML) to Professional (P) zone. The applicant is Carlos Lerena. The property size is 10,000 SF or 0.23 Acres. City Planning Staff and Hearing Examiner recommended approval. [case Resolution 50-26] Resolution 50-26 amends Resolution 41-24 to authorize the purchase and delivery of ready-mix concrete. QE Concrete, LLC is authorized for Florida Department of Transportation (FDOT) grant-related projects. QE Concrete, LLC and Jot & Tittle Concrete, LLC are authorized for non-grant related projects, with an annual amount not to exceed $550,000. The contract duration is through February 11, 2027. [case BPW23123MR-B] City of Cape Coral awarded Contract #BPW23123MR-B for the Purchase and Delivery of Ready-Mix Concrete. Initially awarded to Grippo Pavement Maintenance, Inc. for non-grant related projects ($300,000 annually) and QE Concrete, LLC for grant-related projects ($250,000 annually). Subsequently, Grippo Pavement Maintenance, Inc.'s contract was reassigned to Jot & Tittle Concrete, LLC. The final award structure designates QE Concrete, LLC for all grant-related projects and the lowest bidder for non-grant related work, with a total estimated annual award of $550,000. [case PPW263MR (City of Cape Coral contract), RFP2024-017 (Hillsborough County Sheriff's Office Master Agreement)] Resolution 89-26 approves Contract No. PPW263MR with Genuine Parts Company d/b/a NAPA Auto Parts for Fleet and Facility Vendor Managed Inventory Integrated Business Solutions to obtain vehicle and equipment repair parts. This contract is piggybacked off Hillsborough County Sheriff’s Office Master Agreement No. RFP2024-017. The annual amount is $2,300,000, not to exceed budgetary limits, with an option to renew for two additional five-year periods. [2008 East 8th Avenue, Tampa, FL 33605; case RFP 2024-017] This document is a Request for Proposal (RFP) for Integrated Business Solutions, specifically RFP 2024-017, issued by the Hillsborough County Sheriff's Office (HCSO). The RFP outlines the requirements for securing a qualified contractor to provide vehicle and equipment parts supply operations. The anticipated annual amount for this contract is $2,300,000, with a projected 2.5% increase each fiscal year. The RFP details the proposal submission process, terms and conditions, evaluation criteria, and contract administration. Key dates include the RFP advertised/posted on 6/16/2024, deadline for Letter of Intent on 6/25/2024, deadline for questions on 7/2/2024, and the proposal submission deadline on 7/16/2024 at 3:00 p.m. EDT. The award notification target date is 7/30/2024. The contract is expected to be for an initial five-year term with potential for two additional five-year extensions. The RFP also mentions the possibility of multiple awards and includes provisions for termination, liquidated damages, and dispute resolution. The HCSO is partnering with the Florida Sheriffs Association (FSA) Cooperative Purchasing Program, allowing other Florida government entities to utilize the awarded contract. [2008 East 8th Ave, Tampa FL 33605; case RFP 2024-017] Hillsborough County Sheriff's Office (HCSO) is seeking proposals for Integrated Business Solutions, specifically Fleet and Facility Related Vendor Managed Inventory and Logistics Management Solutions. This includes services like parts management, warehouse operations, logistics coordination, and related training/support. The RFP is for a Master Agreement to be used by HCSO and other eligible Florida government entities. Proposals are due July 16, 2024. Awards will be made based on the best overall value and ability to meet HCSO's needs. The contract term is a five-year initial award with two optional five-year renewals. MANCON, LLC and Genuine Parts Company d/b/a NAPA Auto Parts were awarded contracts on September 17, 2024. [case FDACS# 33527] The City of Cape Coral is approving a Federal Financial Assistance Subrecipient Agreement with the Florida Department of Agriculture and Consumer Services (FDACS) for $50,000 in grant funds, with a $50,000 matching contribution from the City, totaling $100,000. The funds will be used to retain a consultant for the creation of a Citywide GIS tree inventory software. The project aims to quantify and illustrate the value of urban tree canopy and city-maintained green infrastructure, especially after hurricane impacts. The agreement period is from execution through June 30, 2027. [1031 SE 9th Place, Unit 1; case Resolution 99-26] City of Cape Coral is approving the First Amendment to a Lease Agreement for office space at 1031 SE 9th Place, Unit 1, for the Public Works Surface Water Management Division. The amendment extends the lease for three years, clarifies parking, and adjusts Common Area Maintenance (CAM) fees. The space is 3,600 square feet. [2659 NE 9th Avenue; case Resolution 107-26] City of Cape Coral is approving an Economic Development Incentive Participation Agreement and a Business Infrastructure Grant for Architectural Metal Flashings, LLC, to support the expansion of their existing manufacturing facility at 2659 NE 9th Avenue. The expansion includes an 11,250 square foot building addition to increase production capacity. The total construction cost is $1,328,627.00, and the grant award is $132,862.00. [3201 Del Prado Blvd. S.; case Resolution 108-26] City of Cape Coral is approving an Economic Development Incentive Participation Agreement and a Business Infrastructure Grant for Cape Coral Real Estate, LLC, for the construction of a new 5,300 square foot commercial building at 3201 Del Prado Blvd. S. The building will house Kari Mann Dental Studio (approximately 3,100 sq ft) and 2,200 sq ft of leasable commercial space. The total construction cost is $2,219,148.00, and the grant award is $221,914.00. [North 1 East area (Contracts 8, 9, and 10); case Resolution 110-26, DEP Agreement No. not stated] City of Cape Coral is approving a Grant Agreement with the State of Florida Department of Environmental Protection (DEP) for $1,388,907.50 to fund North 1 UEP – Contracts 8, 9, and 10 Catch Basin Modifications. This project involves replacing approximately 367 open-throat catch basins with upgraded units featuring a 3-inch orifice to improve stormwater management and water quality. No matching funds are required from the City. [case NS141] This document outlines the terms and conditions for Grant Agreements, focusing on cost reimbursement, documentation requirements, insurance, termination clauses, and compliance with various federal and state laws. It details procedures for payment requests, eligible project costs, and reporting. Specific sections address requirements for subcontractors, including insurance and compliance with procurement laws like the Consultant's Competitive Negotiation Act. It also covers conditions related to the Build America, Buy America Act, Investing in America initiatives, and prohibitions against engaging with scrutinized companies. The document emphasizes record-keeping, audits, and the independent contractor status of the Grantee. It does not contain information about specific projects, locations, or development proposals. [City of Cape Coral, Lee County, Florida (Lat/Long: 26.685386, -81.934043) for catch basin project; Ceitus Parkway (from Old Burnt Store Road to Burnt Store Road), Orchid Boulevard (from SE 46th Street to east of Del Prado Blvd S), and SW 22nd Terrace (from Surfside Boulevard to SW 20th Avenue) for sidewalk project.; case DEP Agreement No. NS141 (for catch basin project); Bid No. BPW2647KMR (for sidewalk project).] This document outlines two distinct projects. The first is the North 1 UEP - Contract 8, 9 & 10 Catch Basin Modifications project in Cape Coral, Florida, involving the replacement of approximately 367 catch basins with new double orifice bleeders. The project aims to upgrade stormwater treatment and reduce nutrient flow into local waterways. The second project is the Ceitus-Orchid-SW 22nd Terrace Sidewalk Improvement Project in Cape Coral, Florida, which involves the construction of 5-foot-wide sidewalks along specified segments of Ceitus Parkway, Orchid Boulevard, and SW 22nd Terrace to enhance pedestrian infrastructure and safety. This project was awarded to Southern Striping Solutions, LLC. This document outlines various construction bid items and specifications for public works projects, primarily detailing tasks related to utility adjustments, site restoration, and traffic control. Specific bid items include valve box adjustments and replacements, performance turf installation, cleanup and restoration, driveway maintenance, sediment barriers, inlet protection systems, clearing and grubbing, mailbox installation, excavation, embankment, pipe culverts, concrete work (sidewalks, driveways, curb and gutter), detectable warnings, sign relocation, thermoplastic pavement markings, and fire hydrant adjustments/relocations. It also details requirements for survey layout, pre-construction video, mobilization, and maintenance of traffic (MOT). The document specifies adherence to FDOT standards and City of Cape Coral Engineering Design Standards. No specific project locations, applicants, case numbers, or decisions are mentioned in this section; it focuses on the types of work and associated payment structures. [Ceitus Parkway; case CON-RPW-2427MM] Project involves roadway improvements along Ceitus Parkway in Cape Coral, Florida, from station 200+00.00 to 256+73.19. The project includes various construction bid items such as survey layout, pre-construction video, temporary driveway maintenance, sediment barriers, inlet protection, clearing and grubbing, removal of existing concrete, mailbox installation, regular excavation, embankment, concrete work, curb and gutter, sidewalks, driveways, pavers, detectable warnings, sod, sign relocation, thermoplastic pavement markings, and fire hydrant adjustments. Maintenance of traffic is a significant component, with specific requirements for lane closures, access to residences and businesses, and traffic control devices. The project is governed by FDOT specifications and City of Cape Coral Engineering Design Standards. The contract time is 180 calendar days. [Ceitus Parkway; case CON-RPW-2427MM] Project involves the construction of 6" concrete sidewalks along Ceitus Parkway. The project spans from station 200+00.00 to 257+37.00. Specific work includes sidewalk construction, relocation of existing mailboxes, adjustment of water meters, and relocation of existing signs. The project is managed by the City of Cape Coral and designed by Q. Grady Minor & Associates, LLC. [Orchid Blvd.; case CON-RPW-2427MM] This document contains detailed construction specifications and notes for the Orchid Boulevard project in Cape Coral, Florida. It outlines requirements for contractors regarding dewatering, dust control, material salvage, site maintenance, erosion control, staging areas, as-built plans, and utility coordination. Specific details include the need to obtain dewatering permits, use street sweepers for dust control, salvageable materials to be property of the City, maintaining survey stakes, and responsibilities for damages from sheeting, shoring, or dewatering. It also details requirements for sod inspection, keeping inlets clean, erosion control measures, staging area restoration, personnel and material restrictions, as-built plan submission, site videotaping, restoration of disturbed areas, salvaging culverts, removing existing drainage unless noted, and handling of existing driveways. Utility notes cover coordination with various utility owners, notification requirements before digging, and the contractor's responsibility for adjusting existing utilities to the new grade. Drainage notes specify that costs for sub-base, base, and asphalt are included in pipe culvert and drainage structure prices. The project involves extensive work along Orchid Boulevard, including sidewalk and driveway construction, and utility adjustments. [SW 22ND TERRACE; case CON-RPW-2427MM] This document outlines the contract plans and specifications for the SW 22nd Terrace Sidewalk Project in the City of Cape Coral, Florida. The project involves roadway and sidewalk construction, including clearing and grubbing, drainage improvements, concrete work for sidewalks and driveways, and traffic control measures. The project is managed by Pimolmas Tan, P.E., and designed by Q. Grady Minor & Associates, LLC. The construction is scheduled to be completed by November 2025. Specific details regarding pay items, typical sections, drainage, and utility coordination are provided. No public comment or stakeholder sentiment is mentioned in this section of the document. [Ceitus Parkway, Orchid Boulevard, and SW 22nd Terrace; case BPW2647KMR] Project involves sidewalk improvements along Ceitus Parkway, Orchid Boulevard, and SW 22nd Terrace in Cape Coral, Florida. The project includes various concrete work, excavation, embankment, pipe culverts, curb and gutter, sidewalk and driveway construction, paver installation, detectable warnings, sodding, sign assembly relocation, and thermoplastic pavement markings. The total bid price for the combined project is $1,295,603.30. Bids were due March 4, 2026. [case BPW2647KMR] The City of Cape Coral is seeking a contractor to construct 5-foot-wide sidewalks in three distinct locations. Project 1 involves sidewalks on the south side of Ceitus Parkway from the Sirenia Vista Park proposed entrance east of Old Burnt Store Road to an existing sidewalk on Burnt Store Road. Project 2 involves sidewalks on the west side of Orchid Boulevard from an existing sidewalk on SE 46th Street to an existing sidewalk east of Del Prado Blvd S. Project 3 involves sidewalks on the north side of SW 22nd Terrace from an existing sidewalk on Surfside Boulevard to an existing sidewalk on SW 20th Avenue. The scope of work includes traffic control, drainage, sidewalk construction, driveway slope reconstruction, grading, utility adjustments (valve boxes, water meter boxes, fire hydrants), pavement restoration, and sod placement. The project is funded by the City of Cape Coral, and federal-aid compliance requirements do not apply unless specified. Contractors will need to obtain a City Right-of-Way permit, and a Maintenance of Traffic (MOT) plan prepared by a certified technician or Professional Engineer is required. Standard specifications from FDOT and the City of Cape Coral apply. Public comment is not stated in this document. [Ceitus Parkway; case CON-RPW-2427MM] This document details various bid items and specifications for a roadway construction project on Ceitus Parkway in Cape Coral, Florida. It outlines requirements for concrete work (curb and gutter, sidewalks, driveways), detectable warnings, sod, signs, thermoplastic markings, fire hydrants, mobilization, and maintenance of traffic. Specific bid items include Concrete Curb and Gutter Type F (Bid Item 2.18), Concrete Sidewalk and Driveways 4" Thick (Bid Item 2.19), Concrete Sidewalk and Driveways 6" Thick (Bid Item 2.20), Detectable Warnings (Bid Item 2.22), Performance Turf, Sod (Bid Item 2.23), Single Column Ground Sign Assembly, Relocate (Bid Item 2.24), Thermoplastic Markings (Bid Items 2.25 and 2.26), and Fire Hydrant Adjust & Modify (Bid Item 2.27). It also specifies requirements for Mobilization (Bid Item 3.1) and Maintenance of Traffic (Bid Item 3.2). The project references Florida Department of Transportation (FDOT) standards and Cape Coral Engineering Design Standards. The project spans from Station 200+00.00 to Station 256+73.19 on Ceitus Parkway. [case CON-RPW-2427MM] This document contains general notes and specifications for contractors regarding utility notifications, excavation procedures, pre-trenching, underground utility location, removal of out-of-service lines, staking, and adjustments to existing utilities for the Ceitus Parkway project. It details requirements for notifying gas utilities at least two working days prior to excavation, requesting locations of lateral services from utility companies, performing pre-trenching seven business days in advance, and providing seven business days' notice of any construction conflicts. The document also specifies that the contractor is responsible for the cost of adjusting existing utilities affected by new finished grades, including valve boxes, meter boxes, and hydrants, and for disinfection and re-sampling if potable water mains or services are disturbed. The project is identified as CON-RPW-2427MM for the City of Cape Coral, with Q. Grady Minor & Associates, LLC as the engineering firm. Specific addresses or parcel information are not provided in this section. [Orchid Boulevard and SE 46th Street, City of Cape Coral; case CON-RPW-2427MM] This document contains detailed engineering plans and specifications for the Orchid Boulevard road improvement project in the City of Cape Coral. It outlines typical road sections, driveway replacement details, crosswalk markings, and general notes regarding construction, utilities, drainage, and restoration. The project involves roadway widening, sidewalk construction, drainage improvements, and utility adjustments along Orchid Boulevard and SE 46th Street. Specific details include concrete sidewalk and driveway thicknesses, pavement markings, and requirements for maintenance of traffic. The plans also detail existing utilities and their proposed handling, as well as erosion control measures. No public comment or decision information is present in this section of the document. [Orchid Blvd. and SW 22nd Terrace; case CON-RPW-2427MM] Project involves roadway and drainage improvements along Orchid Boulevard and SW 22nd Terrace in Cape Coral. The work includes construction of new driveways, replacement of existing culverts, installation of new drainage pipes, and general road work. Specifics on the exact scope and location are detailed across multiple plan sheets. [SW 22nd Terrace] Project involves roadway improvements on SW 22nd Terrace in Cape Coral, including driveway sections, erosion control, and clearing/grubbing. The project is managed by Q. Grady Minor & Associates, LLC, with R. Daniel Flynn, P.E. as the engineer of record. Specific details on project size, exact start/end points, and decision dates are not stated in this section of the document. The document outlines concrete specifications for various work categories, materials, production, mixing, delivery, placing, sampling, testing, and acceptance. [Orchid Boulevard] This document outlines special provisions and specifications for concrete work for the Orchid Boulevard Sidewalk Project in Cape Coral, Lee County. It details concrete categories, materials, production, mixing, delivery, placing, sampling, testing, and acceptance criteria. The project is prepared by R. Daniel Flynn, P.E. of Q. Grady Minor & Associates, LLC. [SW 22nd Terrace] This document outlines special provisions and specifications for concrete work for the SW 22nd Terrace Sidewalk Project in Cape Coral, Lee County. It details concrete categories, materials, production, mixing, delivery, placing, sampling, testing, and acceptance criteria. The project is prepared by R. Daniel Flynn, P.E. of Q. Grady Minor & Associates, LLC. [City of Cape Coral, Florida; case RPW2427MM] The City of Cape Coral awarded Request for Proposal (RFP) No. RPW2427MM to Q. Grady Minor and Associates, LLC for the professional design of approximately seven (7) miles of city sidewalks along five (5) separate roadways. The contract amount is not to exceed $913,421.09. The selection process involved a Technical Evaluation Committee and a Selection Advisory Committee, with Q. Grady Minor and Associates, LLC being ranked as the top proposer. The contract duration for final completion is 365 calendar days from the notice to proceed. The City Manager is authorized to execute the contract and purchase orders. [Not stated, but project locations are described by roadway names and segments.; case RPW2427MM] This document details a contract for the Professional Design of City Sidewalks Project, identified by case number RPW2427MM. The project involves the design of approximately 7 miles of new sidewalks across five distinct locations within the City of Cape Coral. The scope includes sidewalk and drainage design, ADA compliance, driveway adjustments, traffic control, erosion control, utility coordination, and post-design services. The contract is with Q. Grady Minor & Associates, LLC, for a not-to-exceed fee of $913,421.09. The contract also outlines extensive requirements regarding business ethics, record keeping, audits, public records compliance, safety, equal employment opportunity, immigration law compliance, and dispute resolution. The project is divided into multiple tasks, including preliminary engineering, design survey, geotechnical investigation, drainage analysis, structural analysis, sidewalk plan development, utility coordination, permitting, signing and pavement markings, cost estimation, bidding assistance, and limited construction administration. The contract effective date is June 21, 2024. [1015 Cultural Park Blvd, Cape Coral, FL 33915 (Public Works Department address); case RPW2427MM (for RFP)] The City of Cape Coral Public Works Department is undertaking a project to identify and construct sidewalks for Fiscal Year 2022-2023. The project involves design and build proposals for various sidewalk locations. The total estimated cost for professional design services is $913,421.09. The document lists numerous professional personnel titles and their qualifications required for such projects, including engineers, planners, architects, and technicians. It also includes contractual requirements such as Truth-In-Negotiations, Business Ethics, and Immigration Affidavit/E-Verify compliance. [case BPW2647KMR] The City of Cape Coral is seeking bids for the Ceitus-Orchid-SW 22nd Terrace Sidewalk Improvement Project. The project involves improvements along Ceitus Parkway, Orchid Boulevard, and SW 22nd Terrace. The bid document provides detailed line items for various construction materials and labor, including concrete sidewalk and driveways, roadway, signing and pavement markings, clearing and grubbing, and mobilization. Multiple contractors have submitted bids with varying prices for each line item and the total project. [case Resolution 114-26] The City of Cape Coral City Council approved Amendment No. 1 and Renewal No. 1 to Contract No. SVCM2588SH with Poerio Consulting, Inc. for Lean Government Consulting and Implementation Services. The renewal is for one year, with an option for an additional year, at an annual amount of $165,000. This includes training events and travel expenses. The initiative aims to streamline city processes by identifying and eliminating non-value-added steps. [case Resolution 115-26] The City of Cape Coral City Council approved Resolution 115-26, authorizing the City Manager and City Attorney to jointly approve indemnification and hold harmless agreements with property owners for constructing improvements in public utility or drainage easements. This streamlines the process for property owners who build within easements and must acknowledge the City's non-responsibility for damages to their improvements if utility work is required. [Trafalgar Parkway (from Chiquita Boulevard to Santa Barbara Boulevard), frontage of The Caves at 1511 SW 11th Ave; case Resolution 116-26] The City of Cape Coral City Council approved Resolution 116-26, authorizing an increase of $149,904.98 to Purchase Order No. 26502104 with Guymann Construction, Inc. for the replacement of a 20-inch potable water main along Trafalgar Parkway. The total revised purchase order amount is $249,901.32. The project scope now includes the repair or replacement of nearby faulty isolation valves, in addition to lowering the water main to the required depth. The original contract was awarded to Guymann Construction based on a competitive quote process.

Follow this across meetings

Locations

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis