Agenda Full Package (PDF)
City Council Meeting · 2026-04-20 · agenda
This document is an agenda for the Orlando City Council meeting on April 20, 2026. It lists various items for consideration, including contract awards, service authorizations, amendments, and special event permits. Several items were deferred from previous meetings. Notably, there is an agenda item for the "Dog Park at the Grove Project" awarded to APD Construction, LLC, and an award to Starr Mechanical, Inc. and Climate Control Mechanical Services, LLC for HVAC Mechanical Services. The document also details numerous special event permits for various locations and dates, which may involve temporary structures, vending, alcohol, and amplified sound. Additionally, it includes information on a "Finding of Necessity" study for an expansion area adjacent to Camping World Stadium, which identified blight conditions and the necessity of redevelopment. A "Downtown Outlook Plan Amendment" is also presented, updating the Community Redevelopment Area Plan. The City Council/CRA Workshop reviewed an Amendment and found conformity with the GMP. The City Council is requested to approve the 2026 Plan Amendment, adopt a Resolution, and authorize the Mayor/Pro Tem and City Clerk to sign it, along with authorizing staff to correct scrivener and formatting errors. Separately, the City Council is requested to approve an Ordinance and authorize the Mayor/Mayor Pro Tem and City Clerk to execute it regarding the Tax Increment Financing (TIF) Trust Fund. This amendment updates references to the Downtown Orlando Community Redevelopment Plan to include the 2026 Plan Amendment and provides for the deposit of incremental revenues generated within the 2026 Expansion Area into the Trust Fund, anticipated to be $0 due to the Expansion Area being publicly owned. Orange County Public Schools (OCPS) submitted comments regarding the proposed Finding of Necessity and Blight Resolution for the expansion area adjacent to Camping World Stadium, expressing no opposition but requesting confirmation of coordination with OCPS to avoid adverse impacts on school operations, clarification that publicly owned school properties are not characterized as blighted, inclusion as a stakeholder in planning efforts, and reservation of rights. OCPS also submitted comments on the DTO Outlook Part III (2026) Plan Amendment, requesting coordination with OCPS regarding redevelopment activities impacting student safety and traffic, coordination on infrastructure and growth considerations affecting student population, inclusion as a stakeholder, and transparency regarding funding. OCPS also commented on the Proposed Trust Fund Ordinance Amendment (Ordinance No. 2026-7), expressing concerns about the use of pooled increment revenues for projects in the expansion area which is not expected to generate increment revenue, the lack of a funding nexus, and potential future fiscal impact, requesting transparency, equitable allocation mechanisms, and safeguards. Multiple individuals submitted requests to address the City Council on April 6, 2026, on various topics including affordable housing, homelessness, real estate sales, disability issues, warehouse conversion, and opposition to proposed ICE detention facilities/centers in Orlando and Lake Nona. Cecil Stone submitted comments regarding a potential ICE facility, suggesting a $20 million impact fee for new detention centers, and also raised concerns about OPD ticketing for honking in support of a protest and OPD officers wearing masks. The City Council meeting on April 6, 2026, included a workshop on the Accelerate Orlando Initiative, which uses $58 million in ARPA funding to address homelessness and affordable housing. Projects include Palm Gardens (150 affordable housing units), Residences at Blossom Trail (140 affordable housing units), Orange Center Blvd. Development (townhomes and senior apartments), Housing Repair program, Christian Service Center (day center), 407 Connect (homeless outreach buses), Pathways Drop-In Center, Salvation Army Men's Shelter, Homeless Services Network, and Coalition for the Homeless Women and Children's Shelter. A contract with Track Shack Events for the 10th Annual CommUNITY Rainbow Run on April 20, 2026, was also presented for approval, with proceeds benefiting the Orlando United Pulse Memorial. [400 South Orange Avenue, Orlando, Florida 32801; case S22-0212] The City of Orlando is seeking to amend its contract with AWC, Inc. for Siemens Automation Components. The original contract was approved on May 16, 2022, for a one-year term with options to renew. This amendment extends the contract for an additional six months, increasing the estimated expenditure from $150,000 annually to $300,000 for the six-month period. The increased demand is due to ongoing infrastructure upgrades, system expansions, and maintenance of existing assets. A new solicitation is underway, and the new contract is expected to be awarded before this extension expires. [The Grove Park, across from the Orlando Tennis Center courts; case IFB26-0024] The City of Orlando is requesting approval to award a contract to APD Construction, LLC for the Dog Park at the Grove project. The project involves constructing a dog park at the southern end of The Grove Park, including two covered canopy structures with concrete pads, landscaping, lighting, and perimeter fencing. APD Construction, LLC was the lowest responsive and responsible bidder. [400 S Orange Ave., Orlando, FL, 32801; case S14-0283] The City of Orlando is seeking to renew its contract with Upland Software, Inc. for Eclipse Project Portfolio Management (PPM) software. The contract, initially executed in 2014, is for an additional year with subsequent renewal options. The estimated annual amount for this renewal is $108,081.75. The Eclipse PPM software is used by the Information Technology Department to manage projects, resources, financials, and performance. The system is planned to be replaced by a new ITSM platform in FY27. [Lake Eola; case RFP25-0113 (PW)] The City of Orlando is seeking to negotiate a contract with Wharton-Smith, Inc. for Design-Build Services for the Implementation of the Lake Eola Master Plan. Wharton-Smith, Inc. was ranked first by an Advisory Committee comprised of city officials. The project involves implementing the Lake Eola Master Plan. The City will negotiate with other ranked firms if negotiations with Wharton-Smith, Inc. are unsuccessful. [case IFB26-0024, IFB26-0051, RQS24-0501-2] This document contains bid information for the IFB26-0024 Dog Park at the Grove project, with bids opened on March 26, 2026. It also includes details for IFB26-0051, HVAC Mechanical Services, with bids opened on March 19, 2026, and a Service Authorization with Brown and Caldwell for Water Reclamation Strategic Asset Management Plan Development (RQS24-0501-2). [Southern end of the Packing District Park (AKA) The Grove Park) across from the Orlando Tennis Courts.; case IFB26-0024] The City of Orlando is seeking bids for IFB26-0024, 'Dog Park at the Grove'. The project involves construction of a dog park including two covered canopy structures, concrete pads, landscaping, lighting, and perimeter fencing. Bids were opened on March 26, 2026. The total estimated project cost is $900,514. [case IFB26-0051] The City of Orlando awarded IFB26-0051 for HVAC Mechanical Services. Starr Mechanical, Inc. was awarded as the primary supplier with a bid of $695,760.00, and Climate Control Mechanical Services, LLC as the secondary supplier with a bid of $1,070,000.00. The contract is for three years with an option to renew for two additional one-year terms. The estimated annual expenditure is $882,880.00. [case RQS24-0501-2] The City of Orlando approved a Service Authorization (SA #22068(2)) with Brown and Caldwell, Corporation for Continuing Professional Wastewater Engineering Services to develop a Water Reclamation Strategic Asset Management Plan (SAMP). The not-to-exceed amount for this authorization is $219,948.00. The project aims to standardize the management, maintenance, and replacement of water reclamation infrastructure. [case WAS2026017] City of Orlando Water Reclamation Division is developing a Strategic Asset Management Plan (SAMP). This involves developing a risk-based decision-making framework for asset rehabilitation and replacement, and creating an implementation roadmap. The total not-to-exceed fee for this Services Authorization is $219,948, with an anticipated project duration of approximately 10 months from Notice to Proceed. [Iron Bridge Water Reclamation Facility, Orlando, FL; case RQS25-0019-3 (PW)] City of Orlando Public Works is authorizing a Service Authorization with TLC Engineering Solutions, Inc. for engineering and design services to upgrade the electrical distribution system, replace variable frequency drives, and perform other related work at the Iron Bridge Water Reclamation Facility reclaim pump station. The not-to-exceed amount for this Service Authorization is $382,840.00. The project includes electrical, mechanical, and structural engineering, as well as cost estimating. The design phase is anticipated to take 6 months, with construction phase services to follow. [case C26-0367 (PW)] City of Orlando is requesting approval to utilize Florida Sheriffs Association Contract # FSA25-VEH23.0 with Florida Kenworth LLC for the purchase of five 2027 Autocar Heil ACX automated side loader refuse trucks. The total amount for this purchase is $2,805,805.00. These trucks will replace existing refuse trucks in the Solid Waste Division. Purchase of five (5) 2027 Autocar ACX64 Heil DP Pythons 33 cubic yard ASL trucks as replacement purchases. Total cost $2,805,805.00 for the current fiscal year, with estimated annualized costs of $651,855.00 thereafter. FLT0005_C will fund the purchase price, and SWM0001_C will fund operating costs. [400 SOUTH ORANGE AVENUE • PO BOX 4990 • ORLANDO, FLORIDA 32802-4990; case C26-0376] Approval to utilize NASPO Contract #43220000-NASPO-16-ACS with Carahsoft Technology Corp. for Commvault Cloud Backup and Recovery Software, consulting services, and training. The contract term is three years, with an estimated amount of $515,277.54. Funding is available in TMD0007_P IT Lifecycle Replacement. [400 SOUTH ORANGE AVENUE • PO BOX 4990 • ORLANDO, FLORIDA 32802-4990; case C26-0382] Approval to utilize NASPO Contract #43230000-NASPO-16-ACS with Carahsoft Technology Corp. for ETO Collaborate software, technical support, and training. The estimated annual expenditure is $112,117.58. The current contract term is effective through September 30, 2026, with potential for renewal. Funding is from the General Fund. [400 SOUTH ORANGE AVENUE • PO BOX 4990 • ORLANDO, FLORIDA 32802-4990; case C26-0375] Approval to utilize Sourcewell Contract #090122-GET with PCN Strategies, Inc. for the purchase of 103 Getac rugged mobile computing devices and accessories. The estimated expenditure for this one-time purchase is $475,179.18. Funding is available in the TMD0007_P Information Technology Lifecycle Replacement project. [548 W. Washington Street; 629, 633, 637, 641, 647 Ossie Street; 640 W. Washington St.; case DET2024-10213] Approve the Amended and Restated Parking and Construction Staging License Agreement for The Coalition for the Homeless of Central Florida, Inc. The agreement allows use of parcels at 548 W. Washington Street for employee parking and construction staging, and parcels at 629, 633, 637, 641, 647 Ossie Street and 640 W. Washington St for construction staging. The agreement term is concurrent with the Temporary Use Permit (TUP), expiring April 21, 2027, with potential for two one-year extensions. The Coalition will provide insurance, manage, maintain, and pay stormwater utility fees. [548 W. Washington St. (also includes 629, 633, 637, 641, 647 Ossie Street, and 640 W. Washington Street); case DET2024-10213] This document details two separate matters. The first is a preliminary zoning review for a temporary unimproved parking and construction laydown site at 548 W. Washington St. and surrounding parcels, with case number DET2024-10213. The second is an assignment and assumption of a lease agreement for 37 parking spaces at Heroes Community Park (formerly Laureate Park) from Nona Adventure Park, LLC to OB Adventure Park Ventures, LLC, with a meeting date of April 20, 2026. [1020 Highland Ave.; 610 Lake Dot Cir.; case 17-102(C); 17-102(D); 17-102(B); 17-102(K1); 17-102(K2); ARB2026-10006; ARB2025-10078] This document contains legal descriptions and sketches for various parcels within the Laureate Park Active Park development. It details property boundaries, easements, and land descriptions for Lot 1, Lot 2, and a Stormwater Management Area (SMA-12). It also includes an Assignment and Assumption of Lease for parking spaces and cable areas, and Appearance Review Board (ARB) meeting minutes for two cases: one for landscape and wall treatments at a substation and retention pond, and another for a 3-unit residential building. The ARB approved both cases with specific conditions. [1235 N. Orange Ave.; case VAR2025-10053] The Board of Zoning Adjustment is recommending approval for a variance to allow mechanical equipment to be 1 ft. from the rear yard property line where 20 ft. is required. The property is a 0.3-acre lot developed with a 9,916 sq. ft. restaurant and bar. The mechanical equipment is located adjacent to CSX railroad tracks and will only be visible from the railroad right of way. No public comments were received. [1314 W. Smith St.; case VAR2026-10005] The Board of Zoning Adjustment is recommending approval for a variance to allow a pool to be 5.5 ft. horizontally from an overhead utility line where 10 ft. is required. The property is a 0.2-acre lot developed with a 4,602 sq. ft. single-family residence. The pool and its deck meet all other code required setbacks. No public comments were received. [1610 Curry Ford Rd.; case VAR2026-10006] The Board of Zoning Adjustment is recommending approval for a variance to allow a 70 ft. lot frontage for a semi-circular driveway with two curb cuts on a collector road, where a minimum 100 ft. is required. The property is a 0.17-acre lot developed with a single-family residence. The proposed driveway will reduce the front yard impervious surface ratio from 58% to 39%. Two letters of support were received from the public. [3409 Neptune Dr.; case VAR2026-10008] The Board of Zoning Adjustment is recommending approval for a variance to allow one required parking space to encroach within the 30 ft. front yard setback. The property is a 0.2-acre lot developed with a single-family residence. The garage was previously converted to living space by a former owner, and the applicant seeks to formalize this space. No public comments were received. [879 Prim Dr.; case VAR2026-10010] Request for a variance to allow parking within the 30-foot front yard setback and to widen the driveway by 2 feet for two side-by-side parking spaces. The property has a pre-existing garage conversion that has functioned as living space for decades, resulting in no enclosed garage parking. The driveway extends approximately 32.7 feet from the sidewalk and can accommodate four vehicles in tandem. Approval will recognize the established condition, allow continued use of the existing driveway for off-street parking, and maintain the home's four-bedroom configuration without additional impervious surface or structural expansion. Staff recommends approval. [13858 Tybee Beach Ln.; case VAR2026-10011] Request for a variance of +2 ft. to allow a pool to have a 3 ft. rear yard setback where a 5 ft. rear yard setback is required. The property is a 2,723 sq. ft. single-family residence on a 0.18-acre lot. The rear yard depth is approximately 18 ft., which is unusually shallow compared to other properties on the block. This condition is due to the original siting of the principal structure. Staff recommends approval. [3414 Fairway Ln.; case VAR2026-10012] Request for a variance of 20 ft. to allow a new ±650 sq ft two-car garage addition to be 5 ft. from the rear property line, where a 25 ft. rear setback is required in the R-2A/W zoning district. The property is a uniquely shaped lot. A previous variance (VAR2024-10022) was approved in September 2024 for a similar garage addition. The applicant has also obtained approval for a lot split creating a duplex lot to the north. The proposed garage addition will abut non-residential uses (City Lift Station and commercial uses) to the southwest. Staff recommends approval. [712 Santa Fe Ln.; case VAR2026-10013] Variance request for a 4 ft. encroachment into the front yard setback to convert an existing garage into 319 sq. ft. of additional living area. The property is zoned R-1A/AN (Residential, Low Intensity) and is designated RES-LOW. The variance is needed due to spatial constraints including a swimming pool in the rear yard and an underground propane tank in the south side yard. No public comments were received. [1235 N. Orange Ave.; case VAR2025-10053] Variance request to allow mechanical equipment to be 1 ft. from the rear yard property line, where 20 ft. is required. The property is located at 1235 N. Orange Ave. and is approximately 0.3 acres. [1314 W. Smith St.; case VAR2026-10005] Variance request to allow a pool to be located 5.5 horizontal feet from an overhead power line, where 10 ft. is required. The property is located at 1314 W. Smith St. and is approximately 0.2 acres. [1610 Curry Ford Rd.; case VAR2026-10006] Variance request to allow a 70 ft. lot frontage for a semi-circular driveway with two curb cuts on a collector road, where a minimum 100 ft. frontage is required. The property is located at 1610 Curry Ford Rd. and is approximately 0.2 acres. Conditions include reducing the western curb cut to 9 ft. and providing vegetative screening. [2912 Lake Shore Dr.; case VAR2026-10007] Request for multiple variances: A) 49 ft. to allow a 67 ft. wide rear driveway (max 18 ft. allowed); B) two parallel parking spaces adjacent to rear alley (required perpendicular); C) no buffer between rear parking and alley; D) two 2nd-floor balconies to extend 5 ft. into front setback; E) 10.6 ft. to allow front at-grade patio to be 19.4 ft. from front lot line (30 ft. required). The property is located at 2912 Lake Shore Dr. and is approximately 0.5 acres. The applicant requested deferral. [3409 Neptune Dr.; case VAR2026-10008] Variance request to allow the one required parking space to encroach within the 30 ft. front yard setback due to carport enclosure. The property is located at 3409 Neptune Dr. and is approximately 0.2 acres. [879 Prim Dr.; case VAR2026-10010] Variance requests for an accessory dwelling unit (ADU) on a property smaller than the minimum required (7,100 sq. ft. vs. 7,700 sq. ft.) and to allow the required parking space to be within the front yard setback. The property is located at 879 Prim Dr. and is approximately 1.2 acres. [13858 Tybee Beach Ln.; case VAR2026-10011] Variance request to allow a 3 ft. rear yard setback for a pool, where 5 ft. is required. The property is located at 13858 Tybee Beach Ln. and is approximately 0.2 acres. [3414 Fairway Ln.; case VAR2026-10012] Variance request to allow a 2-story garage addition to be 5 ft. from the rear property line, where a 25 ft. rear setback is required. The property is located at 3414 Fairway Ln. and is approximately 0.4 acres. [2901 Corrine Dr.; case ANX2025-10004, GMP2025-10022, ZON2025-10013] Annexation of a ±0.2-acre vacant property into the city limits, change of future land use from Orange County's Commercial to City's Neighborhood Activity Center, and assignment of initial zoning of AC-N. The property is located at 2901 Corrine Drive and is intended for restaurant development. No public comments were received. [1978 Stanhome Way; case CUP2026-10000] Conditional Use Permit to allow a dog run for a new pet facility within 500 ft. of a residential use/district. The property is located at 1978 Stanhome Way and is approximately 9.4 acres. [5300 Lee Vista Blvd.; case MPL2025-10064] Master Plan request for the development of three new flex-use storage facilities on a vacant lot, totaling 155,820 sq. ft. The property is located at 5300 Lee Vista Blvd. and is approximately 11.7 acres. [10298 Savannah Park Dr.; case MPL2026-10000] Master Plan for a 5-story, 78 dwelling unit senior housing project. The property is located at 10298 Savannah Park Dr. and is approximately 10.3 acres. The request was deferred. [1965 Stanhome Way; case CUP 2026-10000] The Ark and Dig Dog Run project at 1965 Stanhome Way, located on approximately 9.4 acres, is seeking a Conditional Use Permit to allow an outdoor dog run for a pet facility. The dog run is proposed to be located within 500 feet of a residential area within the Princeton Commons Planned Development. The property is currently developed with a Highpoint Climbing Gym, pet grooming facility, and a restaurant. The applicant is The Ark Orlando LLC, and the owner is Dr. Phillips Charities. The staff recommendation is for approval, subject to conditions. No public comments were received as of the report date. [case GMP2026-10002 (for GMP amendment), MPL2025-10064 (for Master Plan request)] This document is the City of Orlando's 2025 Annual Report on Growth Management Plan Indicators. It details progress towards various community development and land use goals, including population and employment growth, completed and approved projects, housing statistics, transportation infrastructure, and environmental indicators. It also includes a staff report for a specific amendment to the Growth Management Plan regarding Urbanized Disturbed Lands and a Master Plan request for flex-use storage facilities. [Generally located south of W. Fairbanks Ave., east of S. John Young Pkwy., north of Gatlin Ave., and west of Goldenrod Rd.; case GMP2026-10002] Amendment to the Growth Management Plan (GMP) Conservation Element to correct a mapping error in Figure C-8 (Urbanized Disturbed Lands). The Traditional City Overlay was inadvertently applied in place of the Urbanized Disturbed Area boundary. The amendment restores the intended boundary, last amended in August 2017. No changes to Future Land Use designations, permitted uses, density, intensity, or development standards are proposed. This area includes Downtown Orlando and surrounding historic districts where an environmental assessment may not be required. [Generally located at the southeast corner of Shadowridge Dr. and LeeVista Blvd.; case MPL2025-10064] Master Plan request for the development of three new flex-use storage facilities on a vacant lot, totaling 155,820 sq. ft. The individual building areas are 36,040 sq. ft., 50,440 sq. ft., and 69,340 sq. ft. The site is split-zoned (AC-N and I-G) and the applicant is requesting a concurrent GMP amendment and rezoning to change the future land use and zoning on the west half of the site from AC-N to Industrial (I-G/AN) to unify the classification. Modifications to the public right-of-way include a new sidewalk along LeeVista Blvd., new curb cuts, and changes to the raised median on Shadowridge Dr. [Intersection of LeeVista Blvd., Shadowridge Dr., and Butler National Dr.; case MPL2025-10064 (Master Plan), GMP2025-10019 (GMP Amendment), ZON2025-10011 (Rezoning)] City Council approved the Municipal Planning Board's decision to change the future land use designation from Neighborhood Activity Center to Industrial and rezone the property from Neighborhood Activity Center with Aircraft Noise Overlay District (AC-N/AN) to General Industrial with Aircraft Noise Overlay District (I-G/AN). The project involves the development of a warehouse park consisting of three buildings with a total of approximately 155,820 sq. ft. The property is located at the intersection of LeeVista Blvd., Shadowridge Dr., and Butler National Dr. The decision was made on February 23, 2026. The project requires a replat and consent for a southern accessway. Conditions include specific landscaping, buffer requirements, architectural details, pedestrian connections, and transportation access modifications. Public comment is not stated in this document. [1800 Mercy Dr., Orlando, FL 32808; case GMP2025-10019, ZON2025-10011, MPL2025-10064 (conditions apply); MPL2026-10000 (Savannah Park Drive Senior Housing); Not explicitly stated for Palm Grove Gardens assignment or Aspire Health Partners funding agreement, but related to CDBG funding.] This document details conditions for GMP2025-10019, ZON2025-10011, and MPL2025-10064, including verification of sewer connections, potential sewer capacity analysis for industrial uses, and compliance with City Standards. It also outlines extensive CPTED (Crime Prevention Through Environmental Design) guidelines for lighting, landscaping, access control, territorial reinforcement, and target hardening, applicable to various project elements like pedestrian areas, parking facilities, and building entries. Separately, the Savannah Park Drive Senior Housing project (MPL2026-10000) was deferred to the April MPB meeting at the applicant's request. The document also covers an Assignment and Assumption Agreement for Palm Grove Gardens, involving a CDBG loan, and a CDBG Public Facilities Funding Agreement for Aspire Health Partners, Inc. to replace a roof. This document outlines the record-keeping, retention, monitoring, audit, and compliance requirements for Aspire, a subrecipient of Community Development Block Grant (CDBG) funds. It details the types of records to be maintained, including activity descriptions, CDBG fund usage, national objective compliance, financial records, procurement documents, and compliance with federal regulations such as the Davis-Bacon Act, Fair Housing Act, and Equal Employment Opportunity. The document also specifies procedures for program income, reporting, property use and disposition, and payment reimbursements. It emphasizes Aspire's responsibility to ensure all subcontractors also comply with these federal and local regulations. There are no specific project details, addresses, or development proposals mentioned in this section of the document; it focuses solely on administrative and compliance procedures. [1800 Mercy Drive, Orlando, FL 32808; case B-25-MC-12-0015] Aspire Health Partners, Inc. received a $150,000 Community Development Block Grant (CDBG) for roof replacement at their campus to continue providing services to the homeless and low-to-moderate income persons. The project is located at 1800 Mercy Drive, Orlando, FL 32808. The CDBG Agreement includes provisions for environmental review, protection, flood disaster protection, flood insurance, lead-based paint prohibition, and historic preservation. Aspire is responsible for compliance with all applicable laws and regulations. The agreement outlines events of default, remedies for non-compliance, and termination procedures. Aspire must maintain various insurance policies, including Commercial General Liability ($500,000/$100,000), Workers' Compensation, Flood Insurance, Employee Fraud/Dishonesty Insurance, and Property/Building Insurance. The loan is secured by a Mortgage and Security Agreement for the property at 1800 Mercy Drive, Orlando, FL 32808. The loan will be forgiven if Aspire remains the owner and is not in default by September 30, 2031. The legal description of the property is Lot 1, Lakeside Place at Princeton. [1800 Mercy Drive, Orlando, FL 32808] Aspire Health Partners, Inc. is undertaking rehabilitation of a property located at 1800 Mercy Drive, Orlando, FL 32808. The project is funded in part by Community Development Block Grant (CDBG) funds from the City of Orlando. The rehabilitation work specifically includes roof replacement, with a CDBG portion of $150,000.00. The property must be used to provide services to homeless and low- to moderate-income persons for a specified 'Use Period' and for five years after the CDBG agreement expires. Aspire is responsible for any cost overruns exceeding the budget. Prior to construction, Aspire must submit an approved Contractor's Schedule of Values and Construction Schedule to the City for approval. The project is subject to federal labor standards and equal employment opportunity clauses. [1800 Mercy Drive, Orlando, FL 32808] Aspire Health Partners, Inc. is receiving a Community Development Block Grant (CDBG) of $150,000.00 to replace the roof at 1800 Mercy Drive, Orlando, FL 32808, enabling continued services to formerly homeless individuals. The grant period is October 1, 2025 - September 30, 2026. Babette Hankey, CEO, signed off on the certification. The City of Orlando Police Department (OPD) will apply for a U.S. Department of Justice (DOJ) Fiscal Year 2025 Edward Byrne Memorial Justice Assistance Grant (JAG) to purchase approximately 10 Unmanned Aerial Systems (UAS), also known as drones, for the Emergency Services Unit (ESU) UAS Team. The total requested amount is $228,647.00. The drones will be used for tracking suspects, serving warrants, and providing real-time air support during high-risk incidents. The project aims to achieve a 1:1 ratio of drones to certified pilots, replace obsolete equipment, and equip patrol officers with drones. The grant period is not explicitly stated but is for FY2025. Mayor Buddy Dyer certified the application. [825 S Tampa Ave, Orlando, FL 32808; case DET2025-10311] An artwork agreement is proposed between the City of Orlando and Lift Orlando, Inc. for the installation of a mural on the exterior north wall of Lift Station #005, located at 825 S Tampa Ave, Orlando, FL 32808. The mural is 8 ft. tall and approximately 18 ft. wide. The City Planning Assistant Division Manager, Timothy McClendon, determined the project is an artistic mural exempt from the Sign Code. Modifications required include reducing the size of 'In Honor of Jackie Perkins' text by 25% and removing 'Orlando’s 1st Black Bookstore' text to ensure text is limited to 5% of the mural area. The agreement outlines terms for design, installation, and maintenance. The zoning for the site is P (Public). The meeting date is April 20, 2026. [case FM#437508-2-58-01] The City of Orlando is entering into a Local Agency Program (LAP) Agreement with the State of Florida Department of Transportation (FDOT) for Citywide Pedestrian Traffic Signals. The project involves the construction of sidewalks, curb and gutter, detectable warning surfaces, signing, pavement marking, and signal work including conduit, poles, pedestrian signals, detection systems, and controller modifications at various intersections. It also includes milling and resurfacing. The Federal Project Number (FPN) is 437508-2-58-01. The agreement is scheduled for approval on April 20, 2026. The recipient vendor number is F596000396005, and the Unique Entity ID (UEI) is CYLDC3FVBLJ9. The Assistance Listing Number (ALN) is 20.205 Highway Planning and Construction. [case 525-010-40] This document is a Local Agency Program Agreement between the State of Florida Department of Transportation (FDOT) and the City of Orlando for the Orlando Citywide Pedestrian Traffic Signals project. The project has an estimated cost of $280,143.00, with FDOT providing financial assistance. The agreement outlines the terms and conditions for the project, including financial participation, payment requisitions, audit requirements, and termination clauses. The Recipient (City of Orlando) agrees to complete the project by June 30, 2027. The agreement also details compliance requirements for contractors and subcontractors, including disadvantaged business enterprise (DBE) participation, civil rights, and labor provisions. Specific exhibits are incorporated by reference, detailing project responsibilities, financial assistance, and other relevant terms. The agreement emphasizes that contractors must be approved by FDOT before executing contracts and that all work must comply with applicable federal and state laws and regulations. [Orange Avenue (SR 527) & Lucerne Circle; Orange Avenue (SR 527) & Grant Street; Orange Avenue (SR 527) & Michigan Street; case 437508-2-58-01] The City of Orlando is undertaking the Orlando Citywide Pedestrian Traffic Signals project, which involves the construction of curb ramps and pedestrian signal upgrades at three intersections along a 1.5-mile stretch of Orange Avenue (SR 527). The project includes sidewalk construction, curb and gutter work, paver adjustments, detectable warning surfaces, signing, and pavement markings. Signal work encompasses conduit installation, pull and splice boxes, cabling, poles, pedestrian signals, detection systems, and controller modifications. Milling and resurfacing will occur at intersections. The project is on the National Highway System and State Highway System. The total construction cost is $280,143.00, funded entirely by federal funds. The construction contract is to be let by July 06, 2026, with a construction duration of 90 days, and completion by February 21, 2027. Construction Engineering and Inspection (CEI) services are being provided through a separate contract (FPN 437508-3-62-02), with the City of Orlando contributing $11,264.00 for Federal-Aid Non-Participating Costs. [Orange Avenue (State Road 527) and Lucerne Circle; Orange Avenue (State Road 527) and Grant Street; Orange Avenue (State Road 527) and Michigan Street; case FPN: 437508-3-62-02] The Orlando Citywide Pedestrian Traffic Signals project involves construction of curb ramps and pedestrian signal upgrades at three intersections along Orange Avenue (State Road 527) in Downtown Orlando. Work includes concrete sidewalk, curb and gutter, pavers, detectable warning surfaces, signing, pavement markings, and signal system components. The project is managed by the City of Orlando and funded in part by FDOT. [West Central Boulevard from Rio Grande Avenue to Westmoreland Drive] An Interlocal Agreement between the City of Orlando and the Orange County Community Redevelopment Agency (CRA) for roadway improvements on West Central Boulevard from Rio Grande Avenue to Westmoreland Drive. The City will engage a contractor for milling, resurfacing, striping, and repair/replacement of sidewalks and curbing. The CRA will reimburse the City up to $355,000 for the project costs. [Lake Eola Park, Central Blvd between Rosalind St/Eola Dr, and one lane on Rosalind Ave from Washington St to Robinson St.; case Application ID: 4060] Special Event Permit Application for the '24th Annual Make'em Smile' event at Lake Eola Park and surrounding streets. The event includes vending, temporary structures, amplified sound, and street closures. It is scheduled for May 1-2, 2026, with an anticipated attendance of 15,000-25,000. [Start/Finish on Orange Ave between South St & Anderson St; course includes Esther St, Delaney Ave, Lucerne Cir, and Orange Ave.; case Application ID: 3838] Special Event Permit Application for the 'Annual CommUNITY Rainbow Run' on June 6, 2026. This is a 4.9k race starting and finishing at City Hall, with a course passing by ORMC and the Pulse Memorial. The event involves street closures and will have an anticipated attendance of 15000. [2432 E Robinson St + Festival Park (parking); Street Closures: Bumby Ave. between Robinson St./Jefferson St.; case Application ID: 4205] Special Event Permit Application for 'Milk Mart 10yr Anniversary' on May 31, 2026. This event is a 300-vendor market in The Milk District, featuring local art and food. It includes street closures and will be held at 2432 E Robinson St + Festival Park (parking). [Festival Park; case Application ID: 4204] Special Event Permit Application for 'Reverie' on May 24-25, 2026, at Festival Park. The event includes temporary structures, alcohol service, and amplified sound. A temporary catwalk extension is planned. [221 South Parramore Avenue, Orlando, FL 32805] The DTO Façade Program is offering a three-year, interest-free, deferred loan for façade and/or building stabilization improvements. Orlando City Properties LLC, owner of 221 South Parramore Avenue, Orlando, FL 32805, has applied for assistance for improvements including storefront, windows, painting, stucco, canopy, electrical, roof, and HVAC. The lowest contractor estimate is $458,350, and the applicant is eligible for up to $300,000 in funding. The Downtown Façade Program Grant Review Committee recommended approval of funding assistance on March 18, 2026. The agreement is between the Community Redevelopment Agency and Orlando City Properties LLC. [Lake Eola Park; case RFP25-0113] The Community Redevelopment Agency (CRA) is seeking to negotiate a contract for Design-Build Services for the Implementation of the Lake Eola Master Plan. Wharton-Smith, Inc. was ranked first by the Advisory Committee, followed by Skanska USA Building, Inc., Balfour Beatty Construction, LP, and The Whiting-Turner Contracting Company. The project involves infrastructure improvements, amenities, design, construction, wayfinding, associated streetscape and road improvements, and other recommended projects and programs to enhance and modernize Lake Eola Park. The CRA aims to create and enhance open spaces within the Downtown Orlando Community Redevelopment Area. [Court St. Between Central Blvd. and Washington St. (Venue Map Address: 25 Wall St. Orlando, FL 32801)] Special Event Permit Application for the Joseph Capriati EDM Concert. The event will take place on Court St. Between Central Blvd. and Washington St., with a venue map address of 25 Wall St. Orlando, FL 32801. It is an EDM concert with DJ Joseph Capriati, featuring food and clothing vendors. Admission is $20 - $40. The event has been held for 3 years. The Fire Marshal review is conditionally approved pending an updated site plan. Police - Extra Duty requires two officers. Transportation is approved, but Police - Extra Duty needs more information. Amplified sound is planned. [Lake Eola Park (Northeast Area); case 4153] Special Event Permit Application for the MindTravel Live-to-Headphones 'Silent' Piano Concert. The event is scheduled for Friday, April 24, 2026, at Lake Eola Park (Northeast Area). It is a 'silent' piano concert using live-to-headphone technology. No food service, alcohol, amplified sound, or public right-of-way impact is planned. Tents, stages, and temporary built structures are planned. Fire Marshal and Site Plan are approved. EMS medical coverage is not required. [Albert Park; case 4157] Special Event Permit Application for the Collective Corner Pop-Up Market at Albert Park. The event is scheduled for Saturday, May 2, 2026. The applicant is Taylor Bianco. Tents, stages, and temporary built structures are planned, as is food service with an estimated 6 food booths, 2 roaming vendors, and 4 food trucks. Open flame cooking and onsite food preparation are planned. Alcohol will not be served. Amplified sound is not planned. Vendors will be selling merchandise or services. Parking is available in Albert Park lots, the Chase building lots, and street parking. Attendees often walk from their homes.
Follow this across meetings
Board
City Council MeetingApplicants and firms
- AWC, Inc.
- APD Construction, LLC
- Upland Software, Inc.
- Wharton-Smith, Inc.
- Starr Mechanical, Inc. (Primary), Climate Control Mechanical Services, LLC (Secondary)
- Brown and Caldwell, Corporation
- Brown and Caldwell
- TLC Engineering Solutions, Inc.
- Florida Kenworth LLC
- Tampa Crane & Body
- Information Technology Department and Procurement and Contracts Division
- Family, Parks, and Recreation Department (FPR) and the Procurement and Contracts Division
- The Coalition for the Homeless of Central Florida, Inc. (Licensee) and City of Orlando (City)
- City of Orlando Planning Division (for review of laydown site); Nona Adventure Park, LLC (Assignor) and OB Adventure Park Ventures, LLC (Assignee) (for lease assignment)
- LAKE NONA LAND COMPANY, LLC; NONA ADVENTURE PARK, LLC (Assignor); LPAP, LLC (Assignee); Daniel Slack (OUC Substation); Katie Liang (610 Lake Dot Cir.)
- Max Furth, Hyperbolic Brewing, Co.
- Keith Cooper, Artesian Pools, Inc.
- Daniel Sanders
- Zachary Richards
- Maximus Seale
- Ruben Puerta
- Michael & Lisbet Stevens
- Michael Oropeza, Royal Palm Construction Group LLC
- Max Furth, Hyperbolic Brewing Co.
- Keith Cooper, Artesian Pools Inc.
- Paul Straubinger
- Michael Stevens
- Katy Magruder, Dix.Hite + Partners (for Corrine Development II, LLC)
- Adam Harbin, The Ark Orlando, LLC
- Garth Ritter, Ritter Civil (for Famlee Investment, Co.)
- William Hockensmith, Thomas and Hutton Engineering (for Ln Senior Housing Re LLC)
- The Ark Orlando LLC
- City of Orlando (for GMP amendment), Famlee Investment Co. (for Master Plan request)
- City of Orlando
- Garth Ritter (Applicant), Famlee Investment Co. (Owner)
- ONIC-New Palm Grove Gardens, LLC (assignor), Standard Palm Grove Venture LP (assignee) for Palm Grove Gardens; Aspire Health Partners, Inc. for Mercy Drive facility.
- Aspire
- Aspire Health Partners, Inc.
- City of Orlando Police Department (OPD)
- Lift Orlando, Inc.
- City of Orlando and Orange County Community Redevelopment Agency
- NATHANIEL'S HOPE (Applicant: MARIE KUCK)
- Katelyn Presti (for Pulse Orlando)
- Ashley Hallenbeck (Visionary Event Group LLC)
- Aleia Roberts (Visionary Event Group LLC)
- Orlando City Properties LLC
- not stated (Wharton-Smith, Inc. is the top-ranked firm for negotiation)
- Murray Hidary (The MindTravel Foundation)
- Taylor Bianco (Collective Corner)
Locations
- 400 South Orange Avenue, Orlando, Florida 32801
- The Grove Park, across from the Orlando Tennis Center courts
- 400 S Orange Ave., Orlando, FL, 32801
- Lake Eola
- Southern end of the Packing District Park (AKA) The Grove Park) across from the Orlando Tennis Courts.
- Iron Bridge Water Reclamation Facility, Orlando, FL
- 400 SOUTH ORANGE AVENUE • PO BOX 4990 • ORLANDO, FLORIDA 32802-4990
- 548 W. Washington Street; 629, 633, 637, 641, 647 Ossie Street; 640 W. Washington St.
- 548 W. Washington St. (also includes 629, 633, 637, 641, 647 Ossie Street, and 640 W. Washington Street)
- 1020 Highland Ave.; 610 Lake Dot Cir.
- 1235 N. Orange Ave.
- 1314 W. Smith St.
- 1610 Curry Ford Rd.
- 3409 Neptune Dr.
- 879 Prim Dr.
- 13858 Tybee Beach Ln.
- 3414 Fairway Ln.
- 712 Santa Fe Ln.
- 2912 Lake Shore Dr.
- 2901 Corrine Dr.
- 1978 Stanhome Way
- 5300 Lee Vista Blvd.
- 10298 Savannah Park Dr.
- 1965 Stanhome Way
- Generally located south of W. Fairbanks Ave., east of S. John Young Pkwy., north of Gatlin Ave., and west of Goldenrod Rd.
- Generally located at the southeast corner of Shadowridge Dr. and LeeVista Blvd.
- Intersection of LeeVista Blvd., Shadowridge Dr., and Butler National Dr.
- 1800 Mercy Dr., Orlando, FL 32808
- 1800 Mercy Drive, Orlando, FL 32808
- 825 S Tampa Ave, Orlando, FL 32808
- Orange Avenue (SR 527) & Lucerne Circle; Orange Avenue (SR 527) & Grant Street; Orange Avenue (SR 527) & Michigan Street
- Orange Avenue (State Road 527) and Lucerne Circle; Orange Avenue (State Road 527) and Grant Street; Orange Avenue (State Road 527) and Michigan Street
- West Central Boulevard from Rio Grande Avenue to Westmoreland Drive
- Lake Eola Park, Central Blvd between Rosalind St/Eola Dr, and one lane on Rosalind Ave from Washington St to Robinson St.
- Start/Finish on Orange Ave between South St & Anderson St; course includes Esther St, Delaney Ave, Lucerne Cir, and Orange Ave.
- 2432 E Robinson St + Festival Park (parking); Street Closures: Bumby Ave. between Robinson St./Jefferson St.
- Festival Park
- 221 South Parramore Avenue, Orlando, FL 32805
- Lake Eola Park
- Court St. Between Central Blvd. and Washington St. (Venue Map Address: 25 Wall St. Orlando, FL 32801)
- Lake Eola Park (Northeast Area)
- Albert Park
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis