LWB-adg-pkt-04.14.26
Lakes & Waterways Board Regular Meeting · 2026-04-14 · agenda_packet
[1400 Elizabeth Dr.; case SAP-2026-0005] The Lakes & Waterways Board is scheduled to meet on April 14, 2026. A key agenda item is a Public Hearing for a Seawall Application (SAP-2026-0005) at 1400 Elizabeth Dr. The applicant is Judith Leavitt, with Hodgskin Outdoor Living as the contractor and Sheila Cichra as the permitting agent. The proposed seawall is 40 feet long and will be a Vinyl Seawall with a concrete cap and natural stone. It is an existing structure that requires revegetation. Staff recommends approval. The board will also discuss Weedoo Operations, which involves aquatic vegetation removal. Data from 2023-2025 shows significant debris and weed removal, with Weedoo introduced in 2023. Cost analysis for Weedoo operations in 2025 was $37,070.21, and a projection for 2026 is $63,591.42. Staff updates include information on aquatic plant management, canal cap repairs, a Killarney Harmful Algal Bloom update, water quality, and upcoming events like 'Run for the Trees/Mother Earth Day' and 'Fix It! Don't Pitch It!'. [1837 Lake Spier Dr.; 561 Via Lugano; case BLDR-2026-0005; BLDR-2025-0812] On March 10, 2026, the Lakes & Waterways Board approved two boathouse/dock applications. BLDR-2026-0005 at 1837 Lake Spier Dr. was approved unanimously, with Lynne Wilson as the applicant, Albert Cichra as the contractor, and Sheila Cichra as the permitting agent. This application involved a seawall structure with no roof and no variance required. The board also unanimously approved BLDR-2025-0812 at 561 Via Lugano, with Ernestine Johnson Beattie as the applicant, Albert Cichra as the contractor, and Sheila Cichra as the permitting agent. This application involved a boathouse/dock with a requested 2ft variance for dock length (current length 32ft), replacement of a sundeck with a pitched roof, and revegetation. Staff had recommended denial due to the length variance not meeting code, but public comment from Sheila Cichra noted the dock's long-standing footprint and the need for the variance for boat fit. The board also received updates on Weedoo operations, noting debris removal in gallons from 2021-2025, with Weedoo introduced in 2023. Cost analysis for Weedoo operations in 2025 was $37,070.21. Staff updates also covered canal repairs in Genius and Venetian Canals, a Killarney Harmful Algal Bloom update, and the launch of a lakes dashboard. Upcoming events included a Household Hazardous Waste Drop-off, Weed Wrangle, Shoreline Restoration, and The Great Duck Derby.
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis