Metropolitan Planning Organization Meeting: mayo de 2026
Collier County
Agenda Index
This document is an agenda for the Collier Metropolitan Planning Organization (MPO) meeting on May 8, 2026. It lists various items for discussion and potential action, including approval of planning work programs, certification statements, merit plans, and the use of funds for sidewalk projects. It also includes reviews of transportation improvement programs and project priority lists. No specific development projects with addresses or detailed scope are presented for approval or denial, but rather planning and funding documents are on the agenda. Public comment is encouraged for items not on the agenda. The meeting will be held at the Collier County Government Center.
- Board:
- Metropolitan Planning Organization Meeting
- Date:
- 2026-05-08
- Type:
- Agenda
- Address:
- 3299 Tamiami Trail East, 3rd Floor, Naples, FL 34112
- Applicant:
- Collier Metropolitan Planning Organization (MPO)
Agenda Packet
[3299 Tamiami Trail East, 3rd Floor, Naples, FL 34112; case 2026-1168 (Minutes), 2026-1169 (CAC Report), 2026-1170 (TAC Report), 2026-1171 (LCB Report), 2026-1172 (UPWP Approval)] This document is the Collier Metropolitan Planning Organization (MPO) agenda and minutes for meetings held on April 10, 2026, and May 8, 2026. It outlines various planning activities, work programs, and agreements related to transportation infrastructure. Key items include the approval of the FY 2026/27 – 2027/28 Unified Planning Work Program (UPWP) and associated FDOT/MPO Agreement, review of draft Transportation Improvement Programs and Project Priority Lists, and updates on congestion management processes. The document details the MPO's planning priorities, funding sources, and coordination efforts with FDOT and the Lee County MPO. It also mentions the use of SU Reserve funds to cover cost overruns on three sidewalk projects. Public comment was not specifically detailed for these agenda items, but the MPO process encourages citizen input. [2885 South Horseshoe Drive, Naples, Florida 34104] This document outlines the operational procedures, advisory committees, and work plan tasks for the Collier MPO. It details the functions of committees like the Technical Advisory Committee (TAC), Citizens Advisory Committee (CAC), Bicycle & Pedestrian Advisory Committee (BPAC), Congestion Management Committee (CMC), and Local Coordinating Board for the Transportation Disadvantaged (LCB). The document also specifies operational procedures, executed agreements, and a detailed breakdown of the Unified Planning Work Program (UPWP) for FY 2026/27-2027/28, including eight distinct tasks with their purposes, previous work, required activities, responsible agencies, deliverables, target dates, and financial tables. The UPWP covers administration, data collection, TIP maintenance, long-range planning, special projects, transit and transportation disadvantaged planning, regional coordination, and locally funded activities. Financial tables detail agency participation and funding sources for FY 2026/27 and FY 2027/28. [2885 Horseshoe Drive S. Naples FL 34104] This document outlines a funding agreement between the Florida Department of Transportation (FDOT) and the Collier Metropolitan Planning Organization (MPO) for transportation planning activities. The agreement covers Fiscal Years 2027 and 2028, with a total budgetary ceiling of $2,483,870.00. Funds are allocated for various tasks including Administration, Data Collection/Development, Transportation Improvement Program (TIP), Long Range Planning, Special Projects and Systems Planning, Transit and Transportation Disadvantaged, and Regional Coordination. The agreement details financial management, procurement, audit requirements, and termination clauses. It specifies that FDOT will provide Federal Highway Administration (FHWA) funds, with the MPO responsible for fulfilling the non-federal share using toll credits. The agreement term is two years, from July 1, 2026, to June 30, 2028. [2885 Horseshoe Drive S. Naples, FL 34104; case FDOT Contract # G3P76] This document is the Unified Planning Work Program (UPWP) for the Collier Metropolitan Planning Organization (MPO) for Fiscal Years 2026/27-2027/28. It outlines transportation planning activities and the allocation of federal, state, and local funds. Key activities include the development of the 2055 Long Range Transportation Plan (LRTP), updates to the Congestion Management Process (CMP), a transit mobility-on-demand feasibility study, and a major update to the Transportation Disadvantaged Service Plan (TDSP). The UPWP also details coordination with Lee County MPO and FDOT, adherence to federal planning factors (e.g., safety, economic vitality, accessibility), and compliance with nondiscrimination laws. The total award for FY 2026/27 and FY 2027/28 is $1,241,935 each year, funded through the Consolidated Planning Grant (CPG). A portion of these funds is allocated for Context Sensitive Solutions Planning as required by the Infrastructure Investment and Jobs Act (IIJA). Public involvement included reviews by the Technical and Citizens Advisory Committees and the MPO Board, with final approval on May 8, 2026. [2885 South Horseshoe Drive, Naples, Florida 34104] This document outlines the Collier Metropolitan Planning Organization's (MPO) Unified Planning Work Program (UPWP) for fiscal years 2026/27 and 2027/28. It details various planning tasks, including administration, data collection, transportation improvement program development, long-range planning, special projects, transit and transportation disadvantaged planning, regional coordination, and locally funded activities. The document specifies budgets for each task and fiscal year, with significant allocations for personnel services, consultant services, and other direct expenses. It also identifies key participants, advisory committees, and operational procedures of the MPO. The UPWP aims to support multimodal transportation planning and development within Collier County and its surrounding regions. This document outlines the Unified Planning Work Program (UPWP) for the Collier Metropolitan Planning Organization (MPO) for Fiscal Years 2026/27 and 2027/28, detailing funding sources and allocations for various transportation planning tasks. It also includes appendices with acronyms, planning studies, travel policy, public comment responses, and resolutions related to the UPWP adoption and FDOT reviews. Specifically, it details funding for Administration, Data Collection/Development, Transportation Improvement Program (TIP), Long Range Planning, Special Projects and Systems Planning, Transit and Transportation Disadvantaged, and Regional Coordination. The document also addresses the approval of a Performance-Based Merit Plan for the Executive Director and the use of SU Reserve funds for sidewalk project cost overruns. Finally, it presents the draft FY 2027-2031 Transportation Improvement Program (TIP) for review and comment. This document outlines the Collier MPO Transportation Improvement Program (TIP) for FY2027-2031, detailing surface transportation projects within the Collier Metropolitan Planning Area (MPA). It specifies funding sources (State, Federal, Local, Toll/Turnpike) and major investment categories (Maintenance & Operations, Highway Capacity Enhancements, Multimodal). The document lists various project priorities including Highway, Freight, Safety, Bridge, Transit, Congestion Management, Bicycle/Pedestrian, and Regional priorities. It also details major projects from the previous TIP that were implemented or delayed, and lists current major projects in the FY2026-2030 TIP. Public involvement processes and TIP amendment procedures are described. The document focuses on the planning and funding of transportation projects, rather than specific contractor opportunities. [City of Naples] The City of Naples' Streets & Traffic Fund (Fund 190) has a Capital Improvement Program (CIP) for FY 2026-2030. The primary focus for FY 2025-26 is citywide roadway resurfacing. The fund is responsible for maintaining and improving all City streets, pathways, intersections, street markings, decorative streetlights, sidewalks, traffic signs, and signalization. Funding sources include gas and telecommunications taxes, impact fees, state and federal grants, and developer commitments. A specific project involves intersection improvements at Broad Avenue South and Gordon Drive/2nd Street, with a 50% cost share from the Developer (Old Naples Hotel). [City of Everglades City; case FPN 448265-1 Phase 3, FPN 452052-1 Phase 4] The City of Everglades City is focusing on repairs to local roadways, addressing drainage issues, and constructing bicycle/pedestrian improvements. Two projects from the Everglades City Bike/Ped Masterplan are programmed in the FY27-31 TIP: FPN 448265-1 Phase 3 and FPN 452052-1 Phase 4 Bike/Ped Improvements. These projects are being managed by FDOT on behalf of the City. [Collier County; case Various Item Numbers (e.g., 417540, 431895, 435110, etc.)] The Florida Department of Transportation (FDOT) has identified several highway projects with federal fund obligations for 2025 within Collier County. These include resurfacing, new bridge construction, sidewalk installation, bike path/trail construction, intersection improvements, and bridge replacements. Specific projects include SR 29 from S of Agriculture Way to CR 846 E (2.251 miles, add lanes & reconstruct) with $1,159,965 in SA funds; 8th Street NE Bridge from Golden Gate Blvd to Randall Blvd (3.212 miles, new bridge construction) with -$6,674 in SA funds; CR 887 (Old US 41) from US 41 to Lee County Line (1.550 miles, PD&E/EMO study) with $115,040 in SU funds; Copeland Ave Sidewalk from Chokoloskee Bay Brdg to N of Broadway Ave (1.277 miles, sidewalk) with -$64,872 total funds; SR90(US 41) Tamiami Trl from E of SR84(Davis Blvd) to Courthouse Shadows (1.465 miles, resurfacing) with $981,917 total funds; County Barn Road from Rattlesnake Hammock to SR 84(Davis Blvd) (2.045 miles, bike path/trail) with -$185,012 total funds for PE and -$206,156 total funds for construction; CR 901/Vanderbilt Dr from Vanderbilt Beach Rd to 109th Avenue N (1.214 miles, sidewalk) with -$42 total funds for PE and -$240,000 total funds for construction; Green Blvd from Santa Barbara Blvd to Sunshine Blvd (1.040 miles, bike lane/sidewalk) with $166,332 in SU funds; SR 951 from Judge Jolley Bridge to Fiddlers Creek Parkway (3.031 miles, resurfacing) with $427,614 total funds; San Marco Rd from Vintage Bay Dr to Goodland Rd (1.440 miles, bike path/trail) with -$268 in SU funds; SR 90 from East of Whistler's Cove Blvd to West of Collier Blvd (1.405 miles, resurfacing) with $1,325,435 in NHRE funds; Inlet Drive from Addison Ct to Travida Terrace (0.604 miles, sidewalk) with $1,000 in SA funds; SR 90 (US 41) at Oasis Visitor Center (0.809 miles, add turn lane(s)) with -$1,112 in SU funds; CR 846 over Drainage Canal (0.018 miles, bridge replacement) with $2,459,281 total funds; Caxambas Court / Roberts Bay Replacement Structure #034112 (0.760 miles, bridge replacement) with $597,743 in BRTZ funds; Bicycle Detection City of Naples ITS (0.000 miles, ITS surveillance system) with $1,000 in SU funds; Vehicle Count Station Collier County ITS (0.000 miles, traffic control devices/system) with $311,562 in SU funds; I-75 (SR 93) from Toll Booth to Collier Blvd (1.585 miles, resurfacing) with -$99,246 total funds; Corkscrew Rd South from Lee County Curve to Collier County Curve (1.005 miles, widen/resurface exist lanes) with $2,220,000 in SU funds; Traffic Control Collier County ITS (0.100 miles, traffic control devices/system) with $893,000 in SU funds; SR 45 (US 41) at CR 886 (Golden Gate Pkwy) (0.006 miles, intersection improvement) with $69,738 total funds; Shadowlawn Elementary - SRTS (0.510 miles, sidewalk) with -$400 in SR2T funds; Livingston FPL Trail Ext from Radio Rd to Collier County Line (0.000 miles, bike path/trail) with $699,762 in SU funds; I-75 (SR 93) from N of Golden Gate Pkwy to Lee County Line (9.536 miles, resurfacing) with $8,148,805 in NHPP funds; Marco Loop Trail Study (13.241 miles, preliminary engineering) with -$41,496 total funds; Wiggins Pass Sidewalk from Vanderbilt Dr to US 41 (0.000 miles, sidewalk) with $447,933 in SU funds; Immokalee City Sidewalks - Various Locations (0.501 miles, sidewalk) with $625,388 total funds for construction managed by Collier County and FDOT, and $93,432 total funds for PE and construction managed by FDOT; Collier Alternate - Multiple Segments (1.667 miles, bike lane/sidewalk) with $618,053 total funds; Naples Manor Sidewalk - Various Location 4 Segments (0.000 miles, sidewalk) with $295,244 in SU funds; Naples Sidewalks on 26th Ave (0.000 miles, sidewalk) with $200,000 in SU funds; Lavern Gaynor Elementary School - Safe Routes to School (0.000 miles, sidewalk) with $185,673 in SR2T funds; 91st Ave N Sidewalk from Vanderbilt Dr to US 41 (0.000 miles, sidewalk) with $277,919 in SU funds; 16th St Bridge NE from Golden Gate to 12th Ave NE (1.512 miles, new bridge construction) with $1,020,733 total funds. The total for District 01 Highways is $22,497,291. [City of Marco Island] The City of Marco Island's Five-Year Capital Improvements Program Summary for Transportation is pending. [Collier County] The Collier MPO is involved in the Transportation Disadvantaged program. For FY2026/27, the MPO's LCB assistance for the Transportation Disadvantaged Trust Fund is $32,438. For FY 2025/26, the TDTF and Trip and Equipment Grant, funded by the Florida Commission for the Transportation Disadvantaged, is $740,125 with a local match of $82,236 and voluntary contributions of $53, totaling $822,414. These funds cover operating expenses for the Collier Area Paratransit Program. Projects programmed through FY 2031 are consistent with the Transportation Disadvantaged Service Plan (TDSP) major update adopted on October 4th, 2023. [Collier County (outside Cities of Marco Island and Naples)] The Collier County Board of County Commissioners has approved a five-year schedule of Capital Improvement Projects, generally located outside the Cities of Marco Island and Naples. These projects are funded by local gas taxes, road impact fees, state and federal grants, and developer commitments. Priorities are based on existing conditions and project needs. Some projects may be reconstruction and resurfacing requested by citizens, while others are part of the overall maintenance and improvement program. All improvements are consistent with the Collier County Comprehensive Plan and Growth Management Plan. [Collier County; case FL-2025-079-00, FL-2025-089-00] The Federal Transit Administration (FTA) has obligated funds for various projects in Collier County. For FY 2025, obligated funds include $4,190,000 for Community Project Funding (CPF) / Congressionally Directed Spending (CDS) for Collier Area Transit, related to construction and furnishing of a replacement operations and maintenance facility. Additionally, $6,060,615 was obligated for FY25 5307 and 5339 Funds (Super Grant) for Capital, ADA, and Operating expenses for Collier & Lee County, Bonita Springs/Naples UZA. [Collier County; case Various FM# and ITEMSEG numbers (e.g., 4525445, 4525446, 4301855, etc.)] The Florida Department of Transportation (FDOT) has identified several Strategic Intermodal System (SIS) projects for District 1, covering the first five-year plan (FY 2025/2026 through FY 2029/2030) and the second five-year plan (FY 2030/2031 through FY 2034/2035). Projects in Collier County include: I-75 from Immokalee to Pine Ridge (add lanes and reconstruct, A1-4: Add 1 to build 4 Lanes) with a total cost of $14,344 (FY25-29) and $157,108 (FY30-35); I-75 from Pine Ridge to Golden Gate (add lanes and reconstruct, A1-4: Add 1 to build 4 Lanes) with a total cost of $100 (FY25-29) and $17,600 (FY30-35); I-75 (SR 93) at SR 951 (INTERCHANGE MODIFY, M-INCH: Modify Interchange) with a total cost of $191 (FY25-29); I-75 from Immokalee to Bonita Beach (add lanes and reconstruct, A1-4: Add 1 to build 4 Lanes) with a total cost of $110,199 (FY25-29) and $280,148 (FY30-35); Immokalee Interchange (add lanes and reconstruct, A1-4: Add 1 to build 4 Lanes) with a total cost of $55,429 (FY25-29) and $0 (FY30-35); SR 29 from CR 846 E to N of New Market Road W (New Road Construction, NR: New Road) with a total cost of $88,273 (FY25-29) and $0 (FY30-35); SR 29 from N of New Market Rd to SR 82 (add lanes and reconstruct, A2-4: Add 2 to Build 4 Lanes) with a total cost of $65,048 (FY25-29) and $0 (FY30-35); SR 29 from Oil Well Road to SR 82 (PDE/EMO Study, PDE: Project Dev. & Env.) with a total cost of $11 (FY25-29). [Everglades Airpark, Immokalee Regional Airport; case PFL0013246, PFL0015153, PFL0008819, PFL0008821, PFL0015185, PFL0008311, PFL0010198, PFL0008820, PFL0012390, 446358] The Collier County Airport Authority has submitted requested funding for Capital Improvement Plans for Everglades Airpark and Immokalee Regional Airport. For Everglades Airpark, projects include a Wildlife Hazard Site Study ($50,000 total funding in 2027), Land Acquisition ($944,444 total funding in 2027), Install Two Light PAPI System ($198,000 total funding in 2028), Design, Permit, Bid & Construct General Aviation Terminal Building ($1,000,000 total funding in 2028 and $1,000,000 in 2029), Rehabilitate Taxiway Alpha ($1,125,000 total funding in 2028), Design, Permit, Construct T-Hangar ($1,500,000 total funding in 2029 and $1,500,000 in 2030), Airport Master Plan Update ($280,000 total funding in 2029), Design, Permit, Bid and Construct Apron ($400,000 total funding in 2031), and Design, Permit & Bid Runway 15/33 Rejuvenation - Crack Seal & Slurry ($167,000 total funding in 2031). For Immokalee Regional Airport, a project for FY2026 is listed with UPIN: FDOT Item No.: $870,000. Marco Island Executive Airport Capital Improvement Plan includes various projects for 2026-2031. Key projects include the design and construction of an Airpark Boulevard Extension ($826,500), enhanced gate access control/monitoring and airport perimeter fencing ($247,200), acquisition and installation of an emergency generator ($216,000), environmental assessment for runway extension ($540,000), construction of an airport maintenance and operations building ($2,264,000), construction of Airpark Boulevard Extension ($2,792,000), acquisition of a new complete master plan ($850,000), land acquisition for runway extension (330 acres) and PHU mitigation ($6,500,000), wildlife hazard site study ($30,000), replacement of PAPIs on Runway 9-27 ($408,600), design and construct runway extension 9/27/extend taxiway B ($8,550,000), design and permit construction of extension of runway 09/27 and taxiway B ($1,620,000), design airport maintenance and operations building ($296,000), design, permit and construct hangar facilities ($4,080,000), design, permit & bid perimeter road & taxiway A modifications ($237,330), rehabilitate runway 18/36 ($204,000), design, permit, construct aircraft storage hangars ($4,296,000), new complete MKY Master Plan ($474,211), design, permit & bid apron lighting ($1,701,000), acquire 1,000 Gallon Avgas Refueler Truck ($180,000), acquire Towbarless Electric Aircraft Tug ($144,000), construct aircraft operations/maintenance/GSE facility ($960,000), design, permit & bid airfield lighting system ($752,000), replace rotating beacon and tower mast ($135,000), acquire a portable ground power unit ($64,000), and pavement rejuvenation for Runway 17-35 ($25,000). Naples Municipal Airport Capital Improvement Plan includes various projects for 2026-2030. Key projects include design/construct Box and T-Hangars - South Quadrant ($2,500,000), expand Airport Observation Deck ($201,408 in 2026, $2,000,000 in 2027), North Road Terminal Interior Renovation ($4,545,841), Taxilane E and H Rehabilitation ($100,000 in 2026, $650,000 in 2027), Bifold Hangar Door Replacement ($1,500,000 annually 2026-2028), Improve Fuel Farm 2025 ($717,022), Perimeter Fence Replacement ($748,153), Security Improvements – Phase III ($2,125,000), North Road Terminal Apron Improvements- Phase 1-Design and Construction ($521,750), North Quadrant Landfill Relocation and Drainage Improvements ($6,000,000), North Road Terminal (CAT) Apron Standards Improvements ($175,000), Rehabilitate Primary Runway 5-23 with Blastpads and High Speed Exits - Design/Build ($50,000 in 2027, $750,000 in 2028), Airfield Lighting Replacement ($2,500,000 annually 2027-2028), Rehabilitate Taxiways B and C and Connectors ($30,000 in 2028, $305,000 in 2029), Rehabilitate Crosswind RW 14-32 and Connectors ($50,000 in 2029, $525,000 in 2030), Taxiway B Extension and North Apron - Design and Construction ($500,000 in 2029, $6,500,000 in 2030), and Rehabilitate Taxiway A and Connectors Design and Construction ($22,500). The Collier MPO 2050 Long Range Transportation Plan includes various road and infrastructure projects. Key projects include: SR 29 (FPID No. 417540-5) from CR 846 North of New Market Road to New Road for New Road Construction ($104.81 million total, $21.42 million in 2026-2030). SR 29 (FPID No. 417540-6) from North of New Market Road to SR 82 for Add Lanes and Reconstruct (two lanes to four lanes) ($68.32 million total, $1.76 million in 2026-2030). SR 82 (FPID No. 430848-1) from Hendry County Line to Gator Slough Lane for Add Lanes and Reconstruct (two lanes to four lanes) ($7.42 million total, $0.41 million in 2026-2030). I-75 at Pine Ridge Road (FPID No. 445296-1, 445296-2) for Modify Interchange ($1.18 million total, $0.03 million in 2026-2030). I-75 at SR 951 (FPID No. 425843-2) for Modify Interchange ($2.84 million total, $0.00 million in 2026-2030). I-75 (FPID No. 425843-3) from Immokalee Road to Bonita Beach Road for Add Lanes and Reconstruct ($120.95 million total, $7.60 million in 2026-2030). I-75 (FPID No. 452544-4) at Immokalee Road for Add Lanes and Reconstruct ($71.54 million total, $7.60 million in 2026-2030). I-75 (FPID No. 452544-5) from Immokalee Road to Pine Ridge Road for Add Lanes and Reconstruct ($30.46 million total, $11.60 million in 2026-2030). I-75 (FPID No. 452544-6) from Pine Ridge Road to Golden Gate Boulevard for Add Lanes and Reconstruct ($13.90 million total, $9.60 million in 2026-2030). I-75 (FPID No. 3693) at Immokalee Road for Modify Interchange ($0.00 million total, $74.93 million in 2031-2050). The Collier MPO 2050 LRTP Cost Feasible Plan includes various FDOT Other Roads Projects and Local Roadway Projects. Key projects include: Bridge at 13th Street NW (over Canal) - New Bridge ($6.66 million total, $8.58 million in 2031-2035). Collier Blvd. (SR 951) from South of Manatee Rd. to North of Tower Road - Widen from four to six lanes ($14.80 million total, $14.68 million in 2031-2035). Logan Blvd. from Green Blvd. to Pine Ridge Road - Widen from four to six lanes ($20.96 million total, $23.46 million in 2031-2035). Santa Barbara Blvd. from Painted Leaf Lane to Green Boulevard - Widen from four to six lanes ($35.78 million total, $40.26 million in 2031-2035). Bridge at Wilson Blvd., South End (over Canal) - New Bridge ($8.50 million total, $8.58 million in 2031-2035). Immokalee Road from Camp Keais Road to Carver Street - Roundabout/Intersection Improvement ($20.00 million total, $25.80 million in 2031-2035). Bridge at 62nd Avenue NE (over Canal) - New Bridge ($6.66 million total, $8.58 million in 2031-2035). Pine Ridge Road from Logan Blvd. to Collier Blvd. - Widen from four to six lanes ($36.55 million total, $32.57 million in 2036-2040). Wilson Blvd. from Golden Gate Blvd. to Immokalee Rd. - Widen from two to four lanes ($88.37 million total, $137.86 million in 2036-2040). Golden Gate Parkway over Livingston Road - Overpass ($62.61 million total, $43.41 million in 2036-2040, $24.21 million in 2041-2050). Airport Pulling Road from Orange Blossom Dr. to intersection - Intersection Innovation/Improvement ($5.22 million total, $7.92 million in 2041-2050). Bridge at 16th Street SE (over Canal) - New Bridge ($6.66 million total, $12.91 million in 2041-2050). The Collier MPO 2050 LRTP Cost Feasible Plan includes Partially Funded Projects for 2031-2050. Key projects include: I-75 (SR 93) Vicinity of Everglades Blvd. - New Partial Interchange; EB Off-Ramp and WB On-Ramp ($62.61 million total, $45.61 million in 2041-2050). US 41 (SR 90) from Greenway Rd. to 6 L Farm Rd. - Widen from two to four lanes ($58.58 million total, $30.42 million in 2036-2040, $5.09 million in 2041-2050). Everglades Blvd. from I-75 (SR-93) to Golden Gate Blvd. - Widen from two to four lanes ($147.31 million total, $180.56 million in 2041-2050). Everglades Blvd. from Oil Well Rd. to Immokalee Rd. - Widen from two to four lanes ($141.51 million total, $15.43 million in 2041-2050, $61.01 million in 2041-2050). Immokalee Rd. (CR 846) from Camp Keais Rd. to Carver Street - Widen from two to four lanes ($63.69 million total, $27.97 million in 2041-2050). The Collier MPO 2050 LRTP includes various projects funded through the FDOT Five-Year TIP. Key projects with funding allocated include: TOLL OPERATIONS EVERGLADES PARKWAY ALLIGATOR ALLEY *SIS* (Item Number: 000151 1) with $109.6 million in <2027, $6.8 million in 2027, $7.1 million in 2031, and $14.7 million in >2031. COLLIER MPO IDENTIFIED OPERATIONAL IMPROVEMENTS FUNDING (Item Number: 405106 1 & 2) with $1.5 million in <2027, $0.1 million in 2027, $1.2 million in 2028, and $8.6 million in 2029-2031. COLLIER COUNTY TSMCA (Item Number: 412666 1) with $4.8 million in <2027, $0.8 million in 2027, and $0.06 million in 2028. CITY OF NAPLES TSMCA (Item Number: 413627 1) with $1.6 million in <2027, $0.16 million in 2027, and $0.16 million in 2028. SR 29 FROM OIL WELL ROAD TO SR 82 *SIS* (Item Number: 417540 1) with $5.96 million for PD&E. SR 29 FROM SUNNILAND NURSERY ROAD TO S OF AGRICULTURE WAY *SIS* (Item Number: 417540 3) with $2.8 million for Preliminary Engineering. SR 29 FROM S OF AGRICULTURE WAY TO CR 846 E *SIS* (Item Number: 417540 4) with $3.6 million for Preliminary Engineering. SR 29 FROM CR 846 E TO N OF NEW MARKET ROAD W *SIS* (Item Number: 417540 5) with $6.59 million for Preliminary Engineering, $14.26 million for Right of Way, and $9.56 million for Railroad & Utilities, and $119.94 million for Construction. SR 29 FROM N OF NEW MARKET RD TO SR 82 *SIS* (Item Number: 417540 6) with $5.44 million for Preliminary Engineering, $1.85 million for Right of Way, $7.84 million for Railroad & Utilities, and $76.02 million for Construction. SR 29 FROM SR 82 TO HENDRY C/L *SIS* (Item Number: 417878 4) with $1.95 million for various phases. I-75 AT SR 951 *SIS* (Item Number: 425843 1) with $4.06 million for various phases. I-75 (SR 93) AT SR 951 (COLLIER BLVD INTERCHANGE) *SIS* (Item Number: 425843 2) with $142.36 million for Design Build and $4.12 million in 2027-2028. I-75 (SR 93) AT SR 951 (COLLIER BLVD INTERCHANGE) *SIS* (Item Number: 425843 3) with $0.29 million for Preliminary Engineering and $1.47 million for Construction. CR 887 (OLD US 41) FROM US 41 TO LEE COUNTY LINE (Item Number: 435110 1) with $1.09 million for PD&E. OLD US 41 FROM US 41 TO LEE / COLLIER COUNTY LINE (Item Number: 435110 2) with $3.22 million for Preliminary Engineering. ALLIGATOR ALLEY FIRE STATION @ MM63 *SIS* (Item Number: 435389 1) with $19.65 million in <2027, $1.55 million in 2027, and $2.37 million annually 2028-2031. COLLIER TMC OPS FUND COUNTY WIDE (Item Number: 437103 1) with $0.82 million in <2027, and $0.11 million annually 2027-2031. SR 45 (US 41) FROM GOLDEN GATE PARKWAY TO SOUTH OF 3RD AVE (Item Number: 437908 1) with $0.17 million for Preliminary Engineering and $5.75 million in 2027. SR 45 (US 41) FROM GOLDEN GATE PARKWAY TO 5TH AVENUE SOUTH (Item Number: 437908 2) with $2.34 million for PD&E. SIGNAL TIMING COUNTY ROADS AT VARIOUS LOCATIONS (Item Number: 437925 1) with $0.83 million for Preliminary Engineering. ORCHID DRIVE SIDEWALK AND BIKE LANE CONNECTION (Item Number: 440436 1) with $0.05 million for Preliminary Engineering and $0.36 million for Construction. SR 45 (US 41) FROM N OF OLD US 41 TO S OF GULF PARK DR (Item Number: 441512 1) with $4.05 million for Preliminary Engineering, $2.11 million for Right of Way, and $23.12 million for Construction. COLLIER COUNTY LAKE TRAFFORD ROAD SIDEWALK AND BIKE LANES (Item Number: 443375 1) with $0.077 million for Preliminary Engineering. COLLIER COUNTY LAKE TRAFFORD ROAD SIDEWALK AND BIKE LANES (Item Number: 443375 2) with $0.087 million for Preliminary Engineering. COLLIER COUNTY LAKE TRAFFORD ROAD SIDEWALK AND BIKE LANES (Item Number: 443375 3) with $1.03 million for Construction. [I-75 AT PINE RIDGE ROAD; case 445296 1] Project involves interchange improvements at I-75 at Pine Ridge Road. Includes preliminary engineering, design, and construction phases. Managed by FDOT. Total estimated cost is $34,480,980. [I-75 AT PINE RIDGE ROAD; case 445296 2] Project involves interchange improvements at I-75 at Pine Ridge Road. Includes construction phase. Managed by FDOT. Total estimated cost is $1,312. [I-75 (SR 93) FROM GOLDEN GATE PKWY TO PINE RIDGE RD; case 449484 1] Project involves landscaping along I-75 (SR 93) from Golden Gate Parkway to Pine Ridge Road. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $439,927. [SR93 AT PINE RIDGE RD INTERCHANGE; case 445296 4] Project involves landscaping at SR93 at Pine Ridge Road interchange. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $2,006,732. [CAXAMBAS COURT / ROBERTS BAY; case 445460 1] Project involves replacement of Caxambas Court / Roberts Bay structure #034112. Includes preliminary engineering, railroad and utilities, and construction phases. Managed by FDOT. Total estimated cost is $18,644,685. [COLLIER COUNTY; case 446251 1] Project involves Travel Time Data for Collier County ITS. Includes capital phase. Managed by Collier County. Total estimated cost is $752,150. [GOODLETTE FRANK RD FROM VANDERBILT RD TO IMMOKALEE RD; case 446341 1] Project involves adding lanes and reconstructing Goodlette Frank Road from Vanderbilt Road to Immokalee Road. Includes construction phase. Managed by FDOT. Total estimated cost is $5,587,725. [SR 45 (US 41) AT CR 886 (GOLDEN GATE PKWY); case 446451 1] Project involves intersection improvement at SR 45 (US 41) at CR 886 (Golden Gate Parkway). Includes preliminary engineering, right of way, railroad and utilities, and construction phases. Managed by FDOT. Total estimated cost is $4,187,270. [WIGGINS PASS SIDEWALK FROM VANDERBILT DR TO US 41; case 448069 1] Project involves constructing sidewalks on Wiggins Pass Road from Vanderbilt Drive to US 41. Includes construction and preliminary engineering phases. Managed by Collier County and FDOT. Total estimated cost is $3,485,429. [WIGGINS PASS SIDEWALK FROM VANDERBILT DR TO US 41; case 448069 2] Project involves preliminary engineering for sidewalks on Wiggins Pass Road from Vanderbilt Drive to US 41. Managed by FDOT. Total estimated cost is $446,377. [GOLDEN GATE SIDEWALKS - VARIOUS LOCATIONS; case 448130 1] Project involves preliminary engineering for sidewalks in Golden Gate - various locations, 4 segments. Managed by FDOT. Total estimated cost is $346,729. [GOLDEN GATE SIDEWALKS - VARIOUS LOCATIONS; case 448130 2] Project involves construction of sidewalks in Golden Gate - various locations, 4 segments. Managed by Collier County. Total estimated cost is $1,243,141. [NAPLES SIDEWALKS ON 26TH AVE; case 448131 1] Project involves construction of sidewalks on 26th Ave in Naples. Managed by City of Naples. Total estimated cost is $701,081. [NAPLES SIDEWALKS ON 26TH AVE; case 448131 2] Project involves preliminary engineering for sidewalks on 26th Ave in Naples. Managed by FDOT. Total estimated cost is $244,220. [LAVERN GAYNOR ELEMENTARY SCHOOL - SAFE ROUTES TO SCHOOL; case 449484 1] Project involves Safe Routes to School sidewalk construction at LaVern Gaynor Elementary School. Managed by City of Bradenton. Total estimated cost is $878,118. [LAVERN GAYNOR ELEMENTARY SCHOOL - SAFE ROUTES TO SCHOOL; case 449484 2] Project involves preliminary engineering for Safe Routes to School sidewalk project at LaVern Gaynor Elementary School. Managed by FDOT. Total estimated cost is $207,902. [91ST AVE N SIDEWALK FROM VANDERBILT DR TO US 41; case 449514 1] Project involves construction of sidewalks on 91st Ave N from Vanderbilt Drive to US 41. Managed by Collier County. Total estimated cost is $1,422,727. [91ST AVE N SIDEWALK FROM VANDERBILT DR TO US 41; case 449514 2] Project involves preliminary engineering for sidewalks on 91st Ave N from Vanderbilt Drive to US 41. Managed by FDOT. Total estimated cost is $298,685. [ITS FIBER OPTIC AND FPL; case 449526 1] Project involves ITS Fiber Optic and FPL. Managed by Collier County. Total estimated cost is $848,732. [ATMS RETIMING FOR ARTERIALS; case 449580 1] Project involves ATMS Retiming for Arterials. Includes preliminary engineering. Managed by FDOT. Total estimated cost is $947,602. [ITS VEHICLE DETECTION UPDATE; case 449581 1] Project involves ITS Vehicle Detection Update. Managed by Collier County Board of County. Total estimated cost is $1,065,904. [SR29 FROM N OF BRIDGE #030307 TO S OF BRIDGE #030299; case 451274 1] Project involves pavement resurfacing on SR 29 from north of Bridge #030307 to south of Bridge #030299. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $4,070,341. [SR 29 FROM S OF I-75 TO N OF BRIDGE NO 030298; case 451276 1] Project involves pavement resurfacing on SR 29 from south of I-75 to north of Bridge No 030298. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $5,996,980. [SR 29 FROM N OF OIL WELL RD (CR 858) TO N OF BRIDGE #030304; case 451277 1] Project involves pavement resurfacing on SR 29 from north of Oil Well Road (CR 858) to north of Bridge #030304. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $6,205,770. [SR 29 AT OIL WELL ROAD; case 456577 1] Project involves lighting at SR 29 at Oil Well Road. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $6,559,680. [SR 29 FROM N OF CR 846 TO S OF NEW MARKET RD; case 451278 1] Project involves resurfacing on SR 29 from north of CR 846 to south of New Market Road. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $12,956,427. [IMMOKALEE SIDEWALKS; case 451542 1] Project involves sidewalks in Immokalee. Includes preliminary engineering and construction phases. Managed by Collier County Board of County and FDOT. Total estimated cost is $1,124,183. [BAYSHORE CRA SIDEWALK; case 451543 1] Project involves preliminary engineering for Bayshore CRA sidewalk. Managed by FDOT. Total estimated cost is $83,100. [BAYSHORE CRA SIDEWALK; case 451543 2] Project involves construction of Bayshore CRA sidewalk. Managed by Collier County. Total estimated cost is $220,168. [EVERGLADES CITY PH4 BIKE/PED IMPROVEMENTS; case 452052 1] Project involves bike lane/sidewalk improvements in Everglades City, Phase 4. Includes preliminary engineering. Managed by FDOT. Total estimated cost is $458,238. [MCCARTY ST FROM FLORIDIAN AVE TO CAROLINE AVE; case 452064 1] Project involves sidewalk construction on McCarty Street from Floridian Ave to Caroline Ave. Includes preliminary engineering and construction phases. Managed by Collier County. Total estimated cost is $1,124,063. [GOLDEN GATE CITY SIDEWALKS - 23RD PL SW & 45TH ST SW; case 452065 1] Project involves sidewalk construction on Golden Gate City sidewalks at 23rd Pl SW & 45th St SW. Includes preliminary engineering and construction phases. Managed by Collier County. Total estimated cost is $322,897. [VANDERBILT BEACH ROAD FROM GULF SHORE DRIVE TO US 41; case 452207 1] Project involves a bike path/trail on Vanderbilt Beach Road from Gulf Shore Drive to US 41. Includes preliminary engineering. Managed by Collier County. Total estimated cost is $108,586. [106TH AVE N FROM VANDERBILT DR TO US 41; case 452208 1] Project involves sidewalks on 106th Ave N from Vanderbilt Drive to US 41. Includes preliminary engineering. Managed by Collier County. Total estimated cost is $78,500. [BALD EAGLE DR FROM SAN MARCO RD TO N COLLIER BLVD; case 452209 1] Project involves bike lane/sidewalk on Bald Eagle Drive from San Marco Road to N Collier Blvd. Managed by City of Marco Island. Total estimated cost is $2,373,370. [109TH AVE N FROM VANDERBILT DR TO US 41; case 452210 1] Project involves sidewalks on 109th Ave N from Vanderbilt Drive to US 41. Includes preliminary engineering. Managed by Collier County. Total estimated cost is $78,500. [108TH AVE N FROM VANDERBILT DR TO US 41; case 452211 1] Project involves sidewalks on 108th Ave N from Vanderbilt Drive to US 41. Includes preliminary engineering. Managed by Collier County. Total estimated cost is $78,500. [IMMOKALEE RD FROM LIVINGSTON RD TO LOGAN BLVD; case 452247 1] Project involves paving shoulders on Immokalee Road from Livingston Road to Logan Boulevard. Includes preliminary engineering and construction phases. Managed by Collier County. Total estimated cost is $22,347,737. [I-75 FROM IMMOKALEE TO BONITA BEACH; case 452544 3] Project involves adding lanes and reconstructing I-75 from Immokalee to Bonita Beach. Includes preliminary engineering, right of way, and related support phases. Managed by FDOT. Total estimated cost is $12,389. [IMMOKALEE INTERCHANGE; case 452544 4] Project involves adding lanes and reconstructing the Immokalee Interchange. Includes right of way phases. Managed by FDOT. Total estimated cost is $112,610. [SR93(I-75) AT IMMOKALEE RD INTERCHANGE; case 452544 7] Project involves landscaping at SR93 (I-75) at Immokalee Road Interchange. Includes preliminary engineering and construction phases. Managed by FDOT and Collier County. Total estimated cost is $884,860. [US 41 FROM 3RD AVE TO SR 84; case 453415 1] Project involves a PD&E/EMO study for US 41 from 3rd Ave to SR 84. Includes PD&E phases. Managed by FDOT. Total estimated cost is $1,271,681. [47TH AVE NE BRIDGE FROM EVERGLADES BLVD TO 20TH ST NE; case 453421 1] Project involves new bridge construction on 47th Ave NE from Everglades Blvd to 20th St NE. Managed by Collier County. Total estimated cost is $4,964,358. [HARBOR DR & MOORING LINE DR BETWEEN US41 & CRAYTON RD; case 455927 1] Project involves traffic signal update on Harbor Drive & Mooring Line Drive between US41 & Crayton Road. Managed by City of Naples. Total estimated cost is $2,061,894. [GOLDENROD AVE OVER SMOKEHOUSE BAY BRIDGE #034116; case 455935 1] Project involves replacement of Goldenrod Ave over Smokehouse Bay Bridge #034116. Includes preliminary engineering and construction phases. Managed by City of Marco Island. Total estimated cost is $9,306,177. [SR 45 (US 41) FROM S OF SHADY REST LANE TO GOLDEN GATE PARKWAY; case 456234 1] Project involves resurfacing on SR 45 (US 41) from south of Shady Rest Lane to Golden Gate Parkway. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $12,867,103. [SR45/90(US41) FROM 5TH AVE S TO EAST OF SR84(DAVIS BLVD); case 456236 1] Project involves pavement resurfacing on SR45/90 (US41) from 5th Ave S to east of SR84 (Davis Blvd). Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $4,168,212. [I-75 FROM CR951 TO GOLDEN GATE PARKWAY; case 457255 1] Project involves a safety project on I-75 from CR951 to Golden Gate Parkway. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $4,262,061. [I-75 FROM WEST TOLL BOOTH PLAZA TO CR951; case 457256 1] Project involves a safety project on I-75 from West Toll Booth Plaza to CR951. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $3,350,406. [ALLIGATOR ALLEY WEST; case 457499 1] Project involves Automatic Electronic Toll (AET) conversion lite on Alligator Alley West. Managed by FDOT. Total estimated cost is $164,053. [ALLIGATOR ALLEY WEST; case 457499 2] Project involves Automatic Electronic Toll (AET) conversion full, including adding lanes and reconstruction on Alligator Alley West. Includes preliminary engineering and construction phases. Managed by FDOT. Total estimated cost is $12,080,144. [PINE RIDGE ROAD FROM LOGAN BLVD TO COLLIER BLVD; case 457536 1] Project involves adding lanes and reconstructing Pine Ridge Road from Logan Blvd to Collier Blvd. Includes preliminary engineering. Managed by FDOT. Total estimated cost is $5,892,510. [CR846 (IMMOKALEE RD) PAVED SHOULDER IMPROVEMENTS PHASE 5; case 457882 1] Project involves paved shoulder improvements on CR846 (Immokalee Rd), Phase 5. Managed by FDOT. Total estimated cost is $1,027,702. [COLLIER COUNTY; case 439314 1] Project involves Collier County MPO FY 2016/2017-2017/2018 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $1,054,611. [COLLIER COUNTY; case 439314 2] Project involves Collier County MPO FY 2018/2019-2019/2020 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $1,736,311. [COLLIER COUNTY; case 439314 3] Project involves Collier County MPO FY 2020/2021-2021/2022 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $1,189,645. [COLLIER COUNTY; case 439314 4] Project involves Collier County MPO FY 2022/2023-2023/2024 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $1,472,157. [COLLIER COUNTY; case 439314 5] Project involves Collier County MPO FY 2024/2025-2025/2026 UPWP. Managed by Collier County Board of County. Total estimated cost is $3,727,349. [COLLIER COUNTY; case 439314 6] Project involves Collier County MPO FY 2026/2027-2027/2028 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $2,838,070. [COLLIER COUNTY; case 439314 7] Project involves Collier County MPO FY 2028/2029-2029/2030 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $3,066,590. [COLLIER COUNTY; case 439314 8] Project involves Collier County MPO FY 2030/2031-2031/2032 UPWP. Managed by Responsible Agency Not Available. Total estimated cost is $1,019,125. [COLLIER COUNTY HIGHWAY LIGHTING; case 412574 1] Project involves Collier County Highway Lighting. Includes routine maintenance. Managed by Collier County. Total estimated cost is $7,914,139. [COLLIER COUNTY PRIMARY; case 412918 1] Project involves Asset Management for Collier County Primary. Includes routine maintenance. Managed by FDOT. Total estimated cost is $18,725,128. [COLLIER COUNTY ASSET MAINTENACE; case 412918 2] Project involves Collier County Asset Maintenance. Includes routine maintenance. Managed by FDOT. Total estimated cost is $62,516,292. [NAPLES HIGHWAY LIGHTING; case 413537 1] Project involves Naples Highway Lighting DDR Funding. Includes routine maintenance. Managed by City of Naples. Total estimated cost is $3,386,761. [IMMOKALEE REGIONAL ARPT AIRPARK BLVD EXTENSION; case 446358 1] Project involves Immokalee Regional Airport Airpark Blvd Extension. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $3,870,000. [NAPLES MUNICIPAL AIRPORT SOUTH QUADRANT BOX AND T-HANGARS; case 446353 1] Project involves Naples Municipal Airport South Quadrant Box and T-Hangars. Includes capital and administration phases. Managed by Responsible Agency Not Available. Total estimated cost is $22,500,000. [IMMOKALEE REGIONAL ARPT AIRPARK BLVD EXTENSION; case 446358 1] Project involves Immokalee Regional Airport Airpark Blvd Extension capital support. Managed by Responsible Agency Not Available. Total estimated cost is $90,552. [NAPLES MUNICIPAL AIRPORT EAST QUADRANT APRON CONSTRUCTION; case 446385 1] Project involves Naples Municipal Airport East Quadrant Apron Construction. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $10,312,618. [MARCO ISLAND EXECUTIVE AIRPORT MASTER PLAN; case 455456 1] Project involves Marco Island Executive Airport Master Plan Update. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $500,613. [NAPLES AIRPORT REHABILITATE RUNWAY 5-23; case 457271 1] Project involves rehabilitation of Runway 5-23 at Naples Airport. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $13,516,538. [NAPLES AIRPORT TAXIWAY E.G.H REHABILITATION; case 457273 1] Project involves rehabilitation of Taxiway E.G.H. at Naples Airport. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $500,613. [IMMOKALEE REGIONAL AIRPORT MASTER PLAN UPDATE; case 457286 1] Project involves Immokalee Regional Airport Master Plan Update. Includes capital phase. Managed by Responsible Agency Not Available. Total estimated cost is $945,601. [COLLIER COUNTY; case 410120 1] Project involves Collier County FTA Section 5311 Operating Assistance. Managed by Collier County. Total estimated cost is $13,108,306. [COLLIER COUNTY; case 410120 2] Project involves Collier County FTA Section 5311 Operating Assistance. Managed by Collier County. Total estimated cost is $5,479,782. [COLLIER COUNTY; case 410139 1] Project involves Collier County State Transit Block Grant Operating Assistance. Managed by Collier County. Total estimated cost is $47,894,298. [COLLIER COUNTY/BONITA SPRING UZA/FTA SECTION 5307; case 410146 1] Project involves Collier County/Bonita Springs UZA/FTA Section 5307 Capital Assistance. Managed by Collier County. Total estimated cost is $103,834,591. [COLLIER COUNTY/BONITA SPRINGS UZA/FTA SECTION 5307; case 410146 2] Project involves Collier County/Bonita Springs UZA/FTA Section 5307 Operating Assist. Managed by Collier County. Total estimated cost is $32,437,468. [COLLIER CO./BONITA SPRINGS UZA FTA SECTION 5339; case 434030 1] Project involves Collier Co./Bonita Springs UZA FTA Section 5339 Capital Assistance. Managed by Collier County. Total estimated cost is $11,108,447. [COLLIER AREA TRANSIT OPERATING ASSISTANCE CORRIDOR US 41; case 452749 1] Project involves Collier Area Transit Operating Assistance for Corridor US 41. Managed by Collier County. Total estimated cost is $6,955,206. [case 448265 1] Item 448265 1, the PHASE 3 EVERGLADES CITY BIKE/PED MASTERPLAN project, involves bike lane and sidewalk construction over 0.503 miles. Preliminary engineering totals $433,927 and construction totals $1,874,782, with a total project cost of $2,308,709. The project is managed by FDOT and is slated for adoption by the MPO Board on 6/12/26. [Immokalee Road at Livingston Road] The Immokalee Road Major Intersection at Livingston Road (Overpass) project is a new funding application for FY 2031/2032, requesting $20,000,000 for the construction phase. This is a Collier County project. [Alico Road to SR 82] The Alico Road Extension (Phase III) project in Lee County has updated TRIP funds requested to $20,000,000 for the construction phase. The project involves a new 4L (4-lane) road from Alico Road to SR 82. [case FPN 449540-1] The Collier to Polk Regional Trail project, now renamed the Heartland Regional Trail, is undergoing a Project Development and Environmental (PD&E) study by FDOT. Updates will be provided later. It was identified in 2025 and is included in the 2026 SUN Trail Project Priority List. [Livingston FPL Trail Extension from Radio Rd to Collier County Line; case FPN 447514-1] The Livingston FPL Trail Extension from Radio Rd to Collier County Line project (FPN 447514-1) was identified in 2025 and is included in the 2026 SUN Trail Project Priority List. It is managed by FDOT. [Various (see summary)] The following projects are listed for Collier County and Lee County TRIP priorities for 2026: Vanderbilt Beach Rd to 16th Street for Everglades Blvd (New 2L CST, $19,050,000 total cost, $4,125,000 TRIP funds), Randall Blvd from Everglades to 8th (2L to 6L PE, $5,760,000 total cost, $2,880,000 TRIP funds), Golden Gate Pkwy at Livingston Rd (Major Intersect. PE, $6,000,000 total cost, $3,000,000 TRIP funds), Santa Barbara/Logan Blvd. from Painted Leaf Lane to Pine Ridge Road (4L to 6L PE, $6,200,000 total cost, $3,100,000 TRIP funds), and Pine Ridge Logan Blvd to Collier Blvd (4L to 6L PE, $5,800,000 total cost, $2,900,000 TRIP funds). Lee County projects include Burnt Store Rd to Van Buren Pkwy. Wallaby Lane (2L to 4L ROW, $15,000,000 total cost, $5,000,000 TRIP funds), Alico Extension - Phase 2 from Alico Road to SR 82 (New 4L CST, $190,294,000 total cost, $20,000,000 TRIP funds), Sunshine Extension from 75th Street to SR 80 (New 4L PD&E, $6,000,000 total cost, $3,000,000 TRIP funds), Alico Extension - Phase IB from Alico Road to SR 82 (New 4L CST, $41,082,029 total cost, $8,000,000 TRIP funds), and Ortiz Avenue from SR 82 to Luckett Road (2L to 4L CST, $52,457,000 total cost, $8,000,000 TRIP funds). Lee County also has Alico Extension - Phase III from Alico Road to SR 82 (New 4L CST, $86,265,388 total cost, $20,000,000 TRIP funds). Collier County also has Immokalee Road at Livingston Road (Major Intersect. CST, $94,763,761 total cost, $20,000,000 TRIP funds) for FY 2031/2032. [Various (see summary)] The following transit projects are listed for Collier Area Transit (CAT) for 2026: Replacement of 5 Cutaway Vehicles, Replacement of 2 Support Vehicles, Replacement of Support Truck, Facilities Improvements ($29,437,469), Bus Shelters ($5,586,428), Study: Immokalee Road Corridor ($75,000). For 2027: Administration/Passenger Station Roof Replacement, 35' Fixed Route Bus Replacement, New Bayshore Shuttle Route Network and New Service ($165,970 capital cost), New Route 31 (Golden Gate Pkwy) (Split Route 25 E-W) ($0 capital cost), Realign Route 14 (60 min headway), Route 30 (Goodlette Frank Rd) (Split Route 25 N-S), Route 15 (90 to 45 min Frequency Improvements) ($603,402 capital cost), Route 121 (add one AM, one PM) ($603,402 capital cost), Route 11 (30 to 20 min Frequency Improvements) ($603,402 capital cost), Route 12 (90 to 45 min Frequency Improvements) ($0 capital cost), Realign Route 13 (shorten to 40 min headway), Route 17 (90 to 45 min Frequency Improvements) ($603,402 capital cost), 40' Fixed Route Bus Replacement. For 2028: Site SL-15 Creekside Park and Ride ($564,940), Beach Lot Vanderbilt Beach Rd Park and Ride ($2,318,200), Replacement of 2 Support Vans, 40' Fixed Route Bus Replacement, Realign Route 23 (headway 60 to 40 minutes) ($0 capital cost), 35' Fixed Route Bus Replacement (x3). For 2029: Radio Rd Transfer Station Lot Park and Ride ($479,961), Beach Lot Pine Ridge Rd Park and Ride ($2,587,310), 35' Fixed Route Bus Replacement, Route 32 (Collier Blvd) (Split Route 27 N-S) ($631,231 capital cost), Express Premium Route to Lee County ($631,231 capital cost), Route 16 (90 to 45 min Frequency Improvements) ($631,231 capital cost), Route 13 (60 to 30 min Frequency Improvements) ($0 capital cost), Route 19 (Extend to 10:00 PM Later Service) ($0 capital cost). For 2031: Immokalee and Lehigh Acres Regional Route ($660,343 capital cost), New Route 33 (Immokalee Rd) (Split Route 27 E-W) ($660,343 capital cost), Immokalee MOD ($181,632 capital cost), Route 14 (60 to 30 min Frequency Improvements) ($660,343 capital cost), Route 11-Extend to 10:00 PM Later Service ($0 capital cost), Route 14 Extend to 10:00 PM Later Service ($0 capital cost), Route 24-Extend to 10:00 PM Later Service ($0 capital cost), Route 15 Extend to 10:00 PM Later Service ($0 capital cost), Route 17 Extend to 10:00 PM Later Service ($0 capital cost), I-75 Express Study ($50,000), Downtown Autonomous Circulator ($0 capital cost), Electric Naples Pier Shuttle ($181,632 capital cost), MOD Demand and Operations Requirements Pilot ($50,000). Transit Fare Study beginning 2025 (every 5 years) ($118,258). COA Study beginning 2028 (every 7 years) ($348,427). [Various (see summary)] The following Highway & Freight projects are listed for Collier County: I-75 (SR 93) vicinity of Everglades Blvd for a new partial interchange (EB off-ramp & WB on-ramp), PE phase funded by SU ($8.38M), ROW phase by SU ($11.09M), CST phase by SU ($26.14M), total project cost $180.56M, funded in plan period 2 (2031-2035). US41 (SR 90) (Tamiami Trail East) from Greenway Rd to Farm Rd for widening from 2 to 4 lanes, PE phase funded by SHS/SU ($10.13M), CST phase by SHS/SU ($25.38M), total project cost $58.58M, funded in plan period 3 (2036-2040). Everglades Blvd from I-75 (SR 93) to Golden Gate Blvd for widening from 2 to 4 lanes, PE phase funded by County ($8.1916M), ROW phase by County ($25.86M), CST phase by County ($123.11M), total project cost $147.31M, funded in plan period 4 (2041-2050). [Various (see summary); case Various FPNs (see summary)] The following projects are listed for Collier MPO SU Box Funds: FY2031: UPWP - 2055 LRTP, BPMP, TDP, CMP (MPO LRTP & related plans) - Planning phase, $1,000,000 SU funding. FY2032: Phase 4 Bike-Ped Improvements (Bike-Ped E. City/FDOT) - CST phase, $426,466 TA funding. Vanderbilt Beach Rd to US41 (Bike Path/Trail) - CST phase, $703,000 TA funding. US41 Sidewalk (10th Ave N to Vanderbilt dr) - CST phase, $621,000 TA funding. UPWP - 2060 LRTP, BPMP, TDP, CMP (MPO LRTP & related plans) - Planning phase, $1,000,000 SU funding. ITS Vehicle Detection Update (ITS - CMS) - CST phase, $1,500,000 SU funding. Roadways Collier Blvd/SR951 S. of Manatee N. of Tower (widen 4-6 lanes) - PE phase, $2,700,000 SU funding. FY2033: US41 Sidewalk (109th Ave N to Vanderbilt dr) - CST phase, $622,000 TA funding. New Vanderbilt dr US41 Sidewalk - CST phase, $627,000 TA funding. Shared Use Path (1 SUP on 6th Ave and East Elkcam Cl) - CST phase, $1,900,000 TA funding. ATMS & Controller Update (ITS) - CST phase, $1,622,000 SU funding. ITS Retiming of Arterials (ITS) - CST phase, $633,000 SU funding. UPWP - 2060 LRTP, BPMP, TDP, CMP (MPO LRTP & Related plans) - Planning phase, $400,000 SU funding. FY2034: UPWP - 2060 LRTP, BPMP, TDP, CMP (MPO LRTP & Related plans) - Planning phase, $900,000 SU funding.
- Board:
- Metropolitan Planning Organization Meeting
- Date:
- 2026-05-08
- Type:
- Agenda_packet
- Decision:
- Approved (for UPWP, Minutes, etc.), Reviewed/Commented (for Draft TIP, Priority Lists)
- Address:
- 3299 Tamiami Trail East, 3rd Floor, Naples, FL 34112
- Applicant:
- Collier Metropolitan Planning Organization