Metropolitan Planning Organization Agenda Packet 6/10/2026
Indian River County Metropolitan Planning Organization (MPO) Meeting · 2026-06-10 · agenda_packet
[1800 27th Street, Vero Beach] The Metropolitan Planning Organization (MPO) will meet on June 10, 2026, at 10:00 AM in Building B, First Floor Conference Room (B1-501), 1800 27th Street, Vero Beach. The agenda includes consideration of the FY 2027 – 2031 Transportation Improvement Program (TIP) and the 2026 List of Priority Projects. A presentation by FDOT on CR 510 Improvements is also scheduled. The MPO previously approved the FY 2026/27 – FY 2027/28 Unified Planning Work Program (UPWP) and the 2026 Title VI Program Update on April 8, 2026. Public comments at the April 8th meeting included concerns from Wabasso residents regarding CR 510 widening and the closure of the 87th Street railroad crossing. The Technical Advisory Committee (TAC), Citizens Advisory Committee (CAC), and Bicycle and Pedestrian Advisory Committee (BPAC) met on May 29, 2026, and June 2, 2026, respectively. They considered and recommended approval of the Transportation Improvement Program (TIP) for FY 2027-2031, the 2026 List of Priority Projects, and the General Planning Consultants Scope of Services. [CR 510 from CR 512 to US 1] FDOT is providing an update on CR 510 Improvements at the June 10, 2026, MPO meeting. The project involves widening CR 510 to four lanes from CR 512 to US 1, a 5.9-mile corridor, including sidewalks and bike lanes on both sides, a roundabout at 66th Avenue, and a two-lane flyover at the FEC railroad and US 1 intersection. The project is divided into five segments, with the first segment (CR 512 to 87th Street) construction beginning in late 2025. [Indian River County] The FY 2027 – FY 2031 Transportation Improvement Program (TIP) lists state and federally funded transportation projects in Indian River County. It includes projects for roads, bikepaths/sidewalks, public transportation, enhancements, multimodal facilities, bridges, and airports. Locally funded projects are also included. The TIP contains $254 million in funding, including $121 million in federal funds. Key projects include widening of CR 512 to four lanes from Willow Street to I-95 (construction funded in FY 2031), multi-modal safety improvements of 45th Street between 58th Avenue and 43rd Avenue (design funded in FY 2027), widening of CR 510 to four lanes from CR 512 to 58th Avenue (construction from CR 512 to 87th Street underway, construction from 87th Street to 82nd Avenue funded in FY 2030), widening of CR 510 to four lanes from 58th Avenue to US 1 with an overpass at FEC railroad and US 1 (design underway, ROW acquisition programmed in FY 2031), paving of 82nd Avenue from 26th Street to 69th Street (ROW acquisition programmed for FY 2027-29), US 1 at Aviation Boulevard intersection improvement (design underway, ROW acquisition programmed), widening of Aviation Boulevard to four lanes from 43rd Avenue to US 1 (PD&E study programmed in FY 2028-29, design in 2031), and standalone sidewalk projects on 43rd Avenue and 41st Street. The MPO is required to approve the TIP by July 15, 2026, to receive federal funding. The TAC, CAC, and BPAC have recommended approval. [26th Street to 69th Street; case 2308793] Project involves new 2-lane roadway construction from 26th Street to 69th Street, spanning 5 miles. Right-of-way acquisition is programmed from FY 2026 through FY 2029, with construction planned for future years. Total project cost is $13,199,790. [43rd Ave to SR-5/US 1; case 4513681] Project to widen Aviation Boulevard from 2 lanes to 4 lanes over a 2.1-mile corridor, including buffered bike lanes, sidewalks, a shared-use path, and drainage improvements. Project Development and Environmental (PD&E) study funded FY 2028-2029, design funded FY 2031. Total project cost is $4,364,628. [W of 82nd Ave to 58th Ave; case 4056063] Widening of CR 510 (85th Street) from 2 lanes to 4 lanes between 82nd Avenue and 58th Avenue, a length of 3.26 miles. Preliminary engineering is underway. Right-of-way acquisition programmed FY 2025-2028. Total project cost is $22,812,798. [CR-512 to W of 82nd Ave; case 4056064] Widening of CR 510 (85th Street) from 2 lanes to 4 lanes between CR-512 and 87th Street, a length of 2.2 miles. Right-of-way funds programmed for FY 2028. Construction funds programmed in respective project segments. Total project cost is $13,963,733. [87th St to West of 82nd Ave; case 4056068] Widening of CR 510 (85th Street) from 2 lanes to 4 lanes between 87th Street and 82nd Avenue, a length of 0.871 miles. Railroad & Utility funds programmed for FY 2029. Construction funds programmed for FY 2030 and FY 2031. Total project cost is $28,646,932. [58th Avenue to East of US 1; case 4416921] Widening of CR 510 (85th Street) from 2 lanes to 4 lanes between 58th Avenue and US 1 (SR 5), a length of 0.6 miles. Preliminary engineering is underway. Right-of-way acquisition programmed for FY 2031. Construction to be programmed for future years. Total project cost is $9,201,119. [Willow Street to SR-9/I-95; case 4573171] Widen CR-512 from 2 lanes to 4 lanes between Willow Street and I-95, a length of 2.572 miles. Construction is funded in FY 2031. Total project cost is $22,957,081. [I-95 to Oslo Road; case 4130485] Landscaping project in conjunction with FM# 4130482 for the I-95/Oslo Road interchange. Landscaping is funded in FY 2028 and FY 2030. Project length is 1.01 miles. Total project cost is $1,734,178. [I-95 to Oslo Road; case 4130482] New interchange at I-95/Oslo Road (9th Street SW). Construction is currently underway. Additional Right-of-Way funds programmed in FY 2028. Project length is 7.379 miles. Total project cost is $108,215,367. [US 1 (SR 5) and Aviation Blvd; case 4416931] Intersection improvements at US 1 (SR 5) and Aviation Blvd. PD&E study completed in 2024. Preliminary engineering programmed for FY 2025 and FY 2026. Right-of-way acquisition programmed for FY 2027, FY 2028, FY 2030 and FY 2031. Total project cost is $24,945,608. [5th Street SW to 1st Street SW; case 4497001] Resurfacing of 43rd Avenue from 5th Street SW to 1st Street SW, a length of 0.491 miles. Construction programmed for FY 2030. Total project cost is $3,167,000. [1st Street SW to 6th Street; case 4442703] Resurfacing of 43rd Avenue from 1st Street SW to 6th Street, a length of 0.756 miles. Construction programmed for FY 2028 and 2029. Total project cost is $4,373,593. [58th Avenue to 43rd Avenue; case 4533271] Multi-modal safety improvements on 45th Street (N Gifford Road) from 58th Avenue to 43rd Avenue, a length of 0.924 miles, to include bike lanes and sidewalks on both sides. Project design programmed for 2027. Total project cost is $752,150. [Indian River County to Partially in St Lucie County; case 4571781] Guardrail project on I-95, spanning 18.902 miles, partially in St. Lucie County. Preliminary engineering programmed for FY 2027. Construction programmed for FY 2028. Total project cost is $11,933,675. [case 4512932] Routine mowing on state and interstate highway systems in Indian River County. Total project cost is $3,342,443. [case 4512933] Routine maintenance on state and interstate highway systems in Indian River County. Total project cost is $3,342,443. [case 2336662] Routine maintenance of state highway bridges in Indian River County. Total project cost is $9,459,156. [case 4278044] Maintenance operations on state highways, specifically traffic signals. Total project cost is not stated for this specific entry, but prior year costs were $8,627,544. [case 2336661] Project involves routine maintenance on state highways in Indian River County, managed by FDOT, with funding allocated from FY 2027 to FY 2029. [case 2342422] Routine maintenance of interstate highway bridges in Indian River County, including in-house bridge inspections, managed by FDOT, with funding allocated for FY 2027 and FY 2028. [case 2342421] Maintenance operations on interstate highways in Indian River County, managed by FDOT, with funding allocated for FY 2027 to FY 2029. [case 4544441] Project involves traffic control devices/systems on SR 510/85th St/Wabasso Road, from FEC RR to US 1, managed by FDOT, with construction programmed for FY 2029. [case 4493321] Widening and resurfacing of existing lanes on SR 512, including interchange modification at I 95/CR 512 (Fellsmere Road) by extending eastbound ramp terminal lane to eliminate drop lane. Project length is 0.381 miles. Construction programmed for FY 2027, managed by FDOT. [case 4484431] Resurfacing of State Road 60 from 21st Avenue to Indian River Boulevard, and 11th Avenue from 20th Street to 21st Street. Project length is 3.11 miles. Railroad & Utility funded in FY 2028, construction programmed for FY 2029, managed by FDOT. [case 4484441] Resurfacing of State Road 60 from East of Fort Drum Wildlife entrance to CR-512. Project is on SIS network. Project length is 7.14 miles. Construction programmed for FY 2030 and FY 2031, managed by FDOT. [SR A1A over Sebastian Inlet; case 4456181] Replacement of Bridge# 880005/SR A1A over the Sebastian Inlet. Project length is 0.915 miles. Construction of new bridge began in FY 2026. Contract incentives programmed for 2030. Additional ROW funds programmed in FY 2031. Project in conjunction with FM# 4456182, managed by FDOT. [SR A1A between Sebastian Inlet Bridge and Sand Dollar Lane; case 4456182] Resurfacing of SR A1A between the Sebastian Inlet Bridge to Sand Dollar Lane. Project length 6.55 miles. Construction programmed for FY 2029, managed by FDOT. Construction will occur after completion of the new Sebastian Inlet bridge. Design and Construction in conjunction with FM# 4456181. [SR A1A between Indian River/St. Lucie County line and Jasmine Lane; case 4498181] Resurfacing of SR A1A between the Indian River/St. Lucie County line to Jasmine Lane. Project length is 5.459 miles. Construction programmed for FY 2027, managed by FDOT. [SR-60/Beachland Blvd bridge over ICWW; case 4566461] Repair/rehabilitation of the SR-60/Beachland Blvd bridge over ICWW. Project length is 0.718 miles. Preliminary engineering programmed for FY 2027 and FY 2028. Construction programmed for FY 2031, managed by FDOT. [case 4515841] Maintenance and operation of traffic signals on state highway system roadways in Indian River County, managed by Indian River County. [US 1 (SR 5) between N of 87 St and S of Sebastian Blvd; case 4498121] Resurfacing of US 1 (SR 5) between north of 87th Street and south of Sebastian Boulevard (CR 512). Project length is 4.222 miles. Construction programmed for FY 2027, managed by FDOT. [case 4071906] Indian River County receives Florida Department of Transportation (FDOT) Block Grant and Federal Transit Administration (FTA) Section 5307 funds for operating assistance. Total project cost is $23,475,853. [case 4071824] Section 5311 formula funds for rural area transit operations, supporting the continued operation of GoLine route #10 in Fellsmere. Total project cost is $1,399,122. [case 4071902] Indian River County receives Federal Transit Administration (FTA) Section 5307 funds for transit capital assistance. Total project cost is $33,863,872. [case 4457281] Indian River County receives Federal Transit Administration (FTA) Section 5339 funds for transit capital assistance. Total project cost is $2,054,199. [41st Street from 32nd Avenue to US 1; case 4570951] Project involves sidewalk construction on 41st Street from 32nd Avenue to US 1. Project length is 0.77 miles. Preliminary engineering and construction programmed between FY 2027 and FY 2031, managed by Indian River County. [43rd Avenue from 45th Street to 49th Street; case 4529951] Sidewalk construction from 45th Street to 49th Street. Project length is 0.503 miles. Construction programmed for FY 2027 and FY 2028, managed by Indian River County. [Sebastian Municipal Airport; case 4571381] Aviation security project at Sebastian Municipal Airport. Total project cost is $509,800. [Sebastian Municipal Airport; case 4571461] Aviation preservation project at Sebastian Municipal Airport. Total project cost is $300,368. [Sebastian Municipal Airport (west side); case 4533791] Construct access road and utilities on the west side of Sebastian Municipal Airport. Total project cost is $2,039,200. [Sebastian Municipal Airport; case 4550111] Construct Taxiway (Phase 1) at Sebastian Municipal Airport. Total project cost is $1,529,400. [Sebastian Municipal Airport; case 4549981] Update Airport Master Plan at Sebastian Municipal Airport. Total project cost is $500,613. [Vero Beach Regional Airport; case 4515381] Rehabilitate airport drainage system at Vero Beach Regional Airport. Total project cost is $2,002,450. [Vero Beach Regional Airport (TWY A South of RWY 12R); case 4533831] Rehabilitate TWY A South of RWY 12R at Vero Beach Regional Airport. Project length is 0 miles. Construction programmed for FY 2027. Total project cost is $2,202,695. [Vero Beach Regional Airport (TWY E West of RWY 4); case 4548971] Extend and mark/light TWY E West of RWY 4 at Vero Beach Regional Airport. Total project cost is $6,031,850. [Vero Beach Regional Airport (RWY 4/22); case 4549011] Environmental study for the extension of RWY 4/22, Phase 1 at Vero Beach Regional Airport. Total project cost is $400,490. [case 4393276] Indian River FY2026/2027-2027/2028 UPWP (Unified Work Program) for transportation planning. Total project cost is $9,433,193. [case 4393277] Indian River FY2028/2029-2029/2030 UPWP (Unified Work Program) for transportation planning. Total project cost is $9,433,193. [case 4393278] Indian River FY2030/2031-2031/2032 UPWP (Unified Work Program) for transportation planning. Total project cost is $9,433,193. [1st Street SW at 27th Avenue] Project involves construction of a left turn lane and traffic signal at 1st Street SW at 27th Avenue. Total estimated cost is $7,610,000. [4th Street & 29th Avenue] Project involves culvert replacement at 4th Street & 29th Avenue. Total estimated cost is $1,400,000. [8th Street from 66th Avenue to 74th Avenue] Project involves road construction and realignment of 8th Street from 66th Avenue to 74th Avenue. Total estimated cost is $2,250,000. [8th Street from 74th Avenue to 82nd Avenue] Project involves road construction and realignment of 8th Street from 74th Avenue to 82nd Avenue. Total estimated cost is $8,000,000. [13th Street SW at 43rd Avenue] Project involves realignment of 13th Street SW at 43rd Avenue. Total estimated cost is $1,500,000. [20th Street] Project involves construction of a pedestrian bridge at 20th Street. Total estimated cost is $315,000. [20th Avenue East Side (8th Street to 12th Street)] Project involves sidewalk construction on the east side of 20th Avenue from 8th Street to 12th Street. Total estimated cost is $2,386,678. [25th Street SW (43rd Avenue to Koblegard Road)] Project involves paving of 25th Street SW from 43rd Avenue to Koblegard Road. Total estimated cost is $725,000. [26th Street (43rd Avenue to 58th Avenue)] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 43rd Avenue to 58th Avenue (1 mile). Total estimated cost is $5,500,000. [26th Street (58th Avenue to 66th Avenue)] Project involves two-lane realignment and construction with pedestrian features on 26th Street from 58th Avenue to 66th Avenue (1 mile). Total estimated cost is $2,000,000. [26th Street at County Building] Project involves sidewalk construction crossing at 26th Street at the County Building. Total estimated cost is $310,000. [27th Avenue at Oslo Road] Project involves Northbound Right and Long Left turn lanes at 27th Avenue and Oslo Road. Total estimated cost is $2,250,000. [28th Court East Side (47th Street to 49th Street)] Project involves sidewalk construction on the east side of 28th Court from 47th Street to 49th Street. Total estimated cost is $1,120,000. [32nd Avenue] Project involves road corridor construction on 32nd Avenue. Total estimated cost is $250,000. [33rd Street & 62nd Court] Project involves culvert replacement at 33rd Street & 62nd Court. Total estimated cost is $700,000. [37th Street & Indian River Boulevard] Project involves intersection improvements at 37th Street & Indian River Boulevard. Total estimated cost is $7,800,000. [US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive] Project involves aviation extension from US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive. Total estimated cost is $5,450,000. [41st Street North Side (32nd Avenue to US Hwy 1)] Project involves sidewalk construction on the north side of 41st Street from 32nd Avenue to US Hwy 1. Total estimated cost is $704,041. [41st Street & US 1 (Old Dixie)] Project involves intersection improvements at 41st Street & US 1, including Old Dixie. Total estimated cost is $1,000,000. [41st Street Northbound right turn lane at 58th Avenue] Project involves a northbound right turn lane at 41st Street at 58th Avenue. Total estimated cost is $1,000,000. [41st Street Canal H] Project involves culvert replacement at 41st Street Canal H. Total estimated cost is $350,000. [43rd Avenue (26th Street to 41st Street)] Project involves full depth reclamation of 43rd Avenue from 26th Street to 41st Street. Total estimated cost is $905,000. [43rd Ave Bridge Replacement/Pedestrian Crossing over South Relief Canal (5th St SW to 1st St SW)] Project involves bridge replacement and pedestrian crossing over South Relief Canal on 43rd Avenue from 5th Street SW to 1st Street SW. Total estimated cost is $6,250,000. [43rd Ave Pedestrian & Bicycle Access Improvements (5th St SW to 1st St SW)] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 5th Street SW to 1st Street SW. Total estimated cost is $1,352,250. [43rd Ave Pedestrian & Bicycle Access Improvements (1st St SW to 6th St)] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 1st Street SW to 6th Street. Total estimated cost is $1,367,850. [43rd Ave Pedestrian & Bicycle Access Improvements (6th St to 12th St)] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 6th Street to 12th Street. Total estimated cost is $4,600,000. [43rd Ave Pedestrian & Bicycle Access Improvements (12th St to 18th St)] Project involves pedestrian and bicycle access improvements on 43rd Avenue from 12th Street to 18th Street. Total estimated cost is $2,927,620. [43rd Ave Sidewalks Both Sides (45th Street to 49th Street)] Project involves sidewalk construction on both sides of 43rd Avenue from 45th Street to 49th Street. Total estimated cost is $102,000. [45th Street/Left Turn Lane at US 1] Project involves construction of a left turn lane at 45th Street/US 1. Total estimated cost is $4,950,000. [45th Street & 58th Avenue] Project involves signalization replacement at 45th Street & 58th Avenue. Total estimated cost is $550,000. [49th Street North Side (43rd Ave to Old Dixie Hwy)] Project involves sidewalk construction on the north side of 49th Street from 43rd Ave to Old Dixie Hwy. Total estimated cost is $250,000. [49th Street & US 1] Project involves intersection improvements at 49th Street & US 1. Total estimated cost is $725,000. [53rd Street (58th Avenue to 66th Avenue)] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (600 foot 4-lane segment). Total estimated cost is $2,000,000. [53rd Street (58th Avenue to 66th Avenue)] Project involves widening of 53rd Street, 58th Avenue to 66th Avenue (800 foot 4-lane segment). Total estimated cost is $1,500,000. [53rd Street (west of 58th Avenue to 66th Avenue)] Project involves widening of 53rd Street, west of 58th Avenue to 66th Avenue (1,000 foot 2-Lane Segment). Total estimated cost is $1,575,000. [58th Avenue - 33rd Street] Project involves left turn lanes at 58th Avenue - 33rd Street. Total estimated cost is $1,400,000. [58th Avenue - 37th Street] Project involves left turn lanes at 58th Avenue - 37th Street. Total estimated cost is $250,000. [58th Ave & 21st SW] Project involves culvert replacement at 58th Ave & 21st SW. Total estimated cost is $750,000. [66th Avenue SW & 17th Street SW] Project involves culvert replacement at 66th Avenue SW & 17th Street SW. Total estimated cost is $700,000. [66th Avenue (69th Street to 85th Street)] Project involves four-lane construction of 66th Avenue from 69th Street to 85th Street (2.0 miles), including side streets and bridges. Total estimated cost is $6,665,226. [66th Avenue at CR510] Project involves intersection improvements at 66th Avenue at CR510. Total estimated cost is $230,000. [82nd Ave Bridge Replacement] Project involves bridge replacement at 82nd Ave. Total estimated cost is $1,150,000. [CR-512 (Willow St to I-95)] Project involves four-lane construction of CR-512 from Willow St to I-95. Total estimated cost is $1,000,000. [CR512] Project involves safety improvements on CR512. Total estimated cost is $410,000. [Ercildoune Heights] Project involves drainage improvements in Ercildoune Heights. Total estimated cost is $650,000. [Highland Drive] Project involves sidewalk construction on Highland Drive (+/- 4500 LF). Total estimated cost is $775,000. [Indian River Blvd (17th St. Bridge to U.S. Highway 1)] Project involves pedestrian, bicycle, and access improvements on Indian River Blvd from 17th St. Bridge to U.S. Highway 1. Total estimated cost is $9,279,719. Project involves miscellaneous right of way acquisition. Total estimated cost is $1,250,000. [64th Avenue to Wabasso Park] Project involves sidewalk extension from 64th Avenue to Wabasso Park. Total estimated cost is $600,000. Project involves traffic controllers. Total estimated cost is $750,000. Project involves traffic camera replacement program. Total estimated cost is $500,000. [Rain Tree Corners] Project involves culvert replacement at Rain Tree Corners. Total estimated cost is $250,000. [Roseland Road Bridge] Project involves bridge replacement at Roseland Road. Total estimated cost is $4,000,000. Project involves sidewalks and designated bicycle lanes. Total estimated cost is $1,250,000. Project involves various culvert replacements. Total estimated cost is $1,980,000. [Vero Lake Estates, 104th Ave (79th to 87th)] Project involves millings in Vero Lake Estates, 104th Ave from 79th to 87th. Total estimated cost is $642,500. This document outlines various transportation projects and funding allocations for Indian River County, including airport improvements, roadway widenings, bridge replacements, and transit initiatives. Specific projects include the rehabilitation of the Vero Beach Regional Airport drainage system, roadway and bridge work on state highways, and the extension of Runway 4/22 at the Vero Beach Regional Airport. It also details funding for the Sebastian Municipal Airport, including master plan updates and access road construction. Roadway projects include widening and resurfacing of SR 60, SR A1A, and US 1, as well as interchange improvements at I-95/Oslo Road. Transit projects involve capital assistance and operating funds. The document also addresses the process for developing and adopting transportation performance targets and reporting progress. Additionally, it details the Indian River County MPO's List of Priority Projects for 2026, which includes highway, regional highway, congestion management, transit, and bicycle/pedestrian projects, and outlines the scope of services for General Planning Consultants. Finally, it covers the approval of a grant agreement for transportation disadvantaged planning services. This document is an informational update on planned transportation improvements in the south county area of Indian River County, Florida. It notes that recent large developments have been approved with conditions requiring developers to construct roadway network improvements, such as turn lanes, paving dirt roads, and installing sidewalks and bike lanes. The Metropolitan Planning Organization (MPO) was to receive this update on June 10, 2026. No action was required by the MPO.
Follow this across meetings
Applicants and firms
Locations
- 1800 27th Street, Vero Beach
- CR 510 from CR 512 to US 1
- Indian River County
- 26th Street to 69th Street
- 43rd Ave to SR-5/US 1
- W of 82nd Ave to 58th Ave
- CR-512 to W of 82nd Ave
- 87th St to West of 82nd Ave
- 58th Avenue to East of US 1
- Willow Street to SR-9/I-95
- I-95 to Oslo Road
- US 1 (SR 5) and Aviation Blvd
- 5th Street SW to 1st Street SW
- 1st Street SW to 6th Street
- 58th Avenue to 43rd Avenue
- Indian River County to Partially in St Lucie County
- SR A1A over Sebastian Inlet
- SR A1A between Sebastian Inlet Bridge and Sand Dollar Lane
- SR A1A between Indian River/St. Lucie County line and Jasmine Lane
- SR-60/Beachland Blvd bridge over ICWW
- US 1 (SR 5) between N of 87 St and S of Sebastian Blvd
- 41st Street from 32nd Avenue to US 1
- 43rd Avenue from 45th Street to 49th Street
- Sebastian Municipal Airport
- Sebastian Municipal Airport (west side)
- Vero Beach Regional Airport
- Vero Beach Regional Airport (TWY A South of RWY 12R)
- Vero Beach Regional Airport (TWY E West of RWY 4)
- Vero Beach Regional Airport (RWY 4/22)
- 1st Street SW at 27th Avenue
- 4th Street & 29th Avenue
- 8th Street from 66th Avenue to 74th Avenue
- 8th Street from 74th Avenue to 82nd Avenue
- 13th Street SW at 43rd Avenue
- 20th Street
- 20th Avenue East Side (8th Street to 12th Street)
- 25th Street SW (43rd Avenue to Koblegard Road)
- 26th Street (43rd Avenue to 58th Avenue)
- 26th Street (58th Avenue to 66th Avenue)
- 26th Street at County Building
- 27th Avenue at Oslo Road
- 28th Court East Side (47th Street to 49th Street)
- 32nd Avenue
- 33rd Street & 62nd Court
- 37th Street & Indian River Boulevard
- US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive
- 41st Street North Side (32nd Avenue to US Hwy 1)
- 41st Street & US 1 (Old Dixie)
- 41st Street Northbound right turn lane at 58th Avenue
- 41st Street Canal H
- 43rd Avenue (26th Street to 41st Street)
- 43rd Ave Bridge Replacement/Pedestrian Crossing over South Relief Canal (5th St SW to 1st St SW)
- 43rd Ave Pedestrian & Bicycle Access Improvements (5th St SW to 1st St SW)
- 43rd Ave Pedestrian & Bicycle Access Improvements (1st St SW to 6th St)
- 43rd Ave Pedestrian & Bicycle Access Improvements (6th St to 12th St)
- 43rd Ave Pedestrian & Bicycle Access Improvements (12th St to 18th St)
- 43rd Ave Sidewalks Both Sides (45th Street to 49th Street)
- 45th Street/Left Turn Lane at US 1
- 45th Street & 58th Avenue
- 49th Street North Side (43rd Ave to Old Dixie Hwy)
- 49th Street & US 1
- 53rd Street (58th Avenue to 66th Avenue)
- 53rd Street (west of 58th Avenue to 66th Avenue)
- 58th Avenue - 33rd Street
- 58th Avenue - 37th Street
- 58th Ave & 21st SW
- 66th Avenue SW & 17th Street SW
- 66th Avenue (69th Street to 85th Street)
- 66th Avenue at CR510
- 82nd Ave Bridge Replacement
- CR-512 (Willow St to I-95)
- CR512
- Ercildoune Heights
- Highland Drive
- Indian River Blvd (17th St. Bridge to U.S. Highway 1)
- 64th Avenue to Wabasso Park
- Rain Tree Corners
- Roseland Road Bridge
- Vero Lake Estates, 104th Ave (79th to 87th)
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis