Aviation Advisory Board May 14, 2026
Aviation Advisory Board · 2026-05-14 · agenda
This document is the agenda for the Aviation Advisory Board meeting on May 14, 2026. It lists various project status reports, including major projects like the CGC Runway 9/27 Extension, CGC Fuel Tank Replacement, CGC AGIS Survey, CGC Airfield Lighting Replacement, INF Business Park, INF Corporate Hangar, INF Master Plan & DBE, INF & CGC Automated Weather Observing System (AWOS), and minor projects such as Airport Signage (Design Concept) and INF - Paint Sheriff Hangar and Office. It also includes old business items like DRC Sports - Citrus Kids Triathlon and new business discussions. No specific decisions or approvals are detailed for these projects within the agenda itself, only their status reporting.
Agenda items
- 1. 4.09.2026 - AAB Minutes - Draft
- 1. The monument sign for CGC will be located at the intersection of Hwy 19
- 1. The monument sign for INF will be located at the intersection of Hwy 41
- 1. Will Cosey, VP of EAA Chapter 1674, stated that a flat double-sided sign at
- Site Prep, Grading & Hardscape
- Lighting & Low-Voltage Systems
- Construction (Other)
- Engineering & Architecture
- Design & Creative
- 10. AIRPORT SECURITY:
- 11. TOWER UPDATES
- 2. Charley inquired about how this project is being funded – It is being funded
- 2. James Chen, FBO of Crystal Aero Group, stated that sign designs should be
- 2. The board decided that a flat double-sided sign that sits perpendicular to the
- 3. Chris Molling, Race Director for DRC Sports, stated that he likes the idea
- 3. Discussion ensued regarding the fencing at the corner of Hwy 19 and
- 4. The board decided that a flat double-sided sign that sits perpendicular to the
- 6. HANGARS:
- 8. PROJECT STATUS REPORTS: (Todd Regan, Project Manager)
- A. Bud Shaffer, tenant at INF, inquired about the budget for the signage project.
- A. CGC Avgas
- A. Carl Douglas Flanagan
- A. INF – 16 T-Hangars – 0 Box Hangars - 1 Vacancies – 2 Waiting – 0 Pending - 0 Renewals
- A. Infrastructure Consulting & Engineering – Airport Signage Presentation #2
- A. Major Project Status Reports
- A. Mark Klingel made a motion to accept the Minutes as written.
- A. Todd requested that if a tenant needs the code to the airport, to please communicate with him
- A. Vice Chair Carl Douglas Flanagan declared the meeting adjourned at 3:09 PM. Motion made
- General Contractor
- Concrete & Masonry
- Plumbing
- Electrical
- Utilities (Sub)
- Building & Industrial Supply
- A. Withlacoochee Technical College – Airframe and Powerplant Program
- B. CGC – 20 T-Hangars – 2 Box Hangars - 1 Vacancies – 4 Waiting – 0 Pending – 0 Renewal
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- B. DRC Sports – Citrus Kids Triathlon
- B. James Chen, FBO of Crystal Aero Group, thanked Todd and support staff for their help and
- B. Mark Klingel
- B. Minor Project Status Reports
- B. Seconded by Barry Simons.
- C. Bylaws – Review and Discussion
- C. Motion approved unanimously.
- C. Ryan Naugle
- C. Will Cosey, VP of EAA Chapter 1674, informed the board that the EAA chapter went to
- D. Charles Carr
- D. Mark Klingel stated that he will not be in attendance at the next meeting.
- E. Barry Simons
- F. Patrick Crippen (Excused)
- G. Heiko Kallenbach (Excused)
- G. OLD BUSINESS
- G. OLD BUSINESS
- H. HANGER STATUS REPORT
- H. HANGER STATUS REPORT
- H. Hannah Petty, Public Works Admin Assistant II / Recording Secretary
- I. BOARD OF COUNTY COMMISIONER (BOCC) UPDATES
- I. BOARD OF COUNTY COMMISIONER (BOCC) UPDATES
- I. Todd Regan, Aviation Project Manager/Advisory Board County Liaison
- J. PROJECT STATUS REPORTS - MAJOR
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Business Consulting
- Office & Business Support Services
- J. PROJECT STATUS REPORTS - MAJOR
- K. PROJECT STATUS - MINOR
- K. PROJECT STATUS - MINOR
- M. TOWER UPDATES
- M. TOWER UPDATES
- N. AIRPORT SECURITY
- N. AIRPORT SECURITY
- a. Airport Signage Design – Second round of renderings to be discussed.
- Design & Creative
- Site Prep, Grading & Hardscape
- Signage & Printing
- a. CGC Runway 9/27 Extension – Draft EA with edits passed Orlando ADO and is with
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- a. Charles Carr made a motion to approve the Bylaw edits.
- a. FAA approved Citrus Kids Triathlon, notified associated parties involved, and Citrus
- a. There was a recent failure in the Avgas system at CGC. The pump will be replaced
- b. Air Force Research Laboratory (AFRL) Ionospheric Experiment – The Air Force
- b. CGC Fuel Tanks Replacement – Fuel Farm replacement project schedule reviewed,
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- b. Seconded by Mark Klingel
- c. CGC AGIS Survey – Deliveries: Obstruction analysis March 10
- Engineering & Architecture
- Professional Services (Other)
- Admin Services (Other)
- c. CGC – Paint Shade and Corporate Hangar – Project complete; will remove from
- c. Motion approved unanimously.
- d. CGC – Airfield Lighting Replacement – Reviewing SOW and preparing ITB for
- Electrical
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Waste Management
- d. INF – Paint Sheriff Hangar and Office – Scheduling for April/May 2026.
- Painting & Flooring
- Construction (Other)
- e. INF Business Park – First progress meeting with contractors, consultants, and County
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- f. INF Corporate Hangar – Reviewed plans with the Building and Fire Department.
- g. INF Master Plan & DBE – 2nd MPAC meeting scheduled for April 22nd, 2026, at the
- h. Inverness Airport (INF) Fire Station – SWFWMD and FDOT permits approved.
- i. Design budget is roughly $19,000. The construction was budgeted for roughly
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- i. Discussion ensued regarding CGC signage.
- i. INF AWOS replacement – ITB scheduled for early May.
- ii. Discussion ensued regarding INF signage.
- iii. The board opened discussion up to the public.
- j. CGC AWOS replacement - ITB scheduled for early May.
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta