Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse Citrus County civic records

Every published record for Citrus County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,893 records

G. APPLICATIONS

Lecanto Sand LLC has applied for a Community Plan Amendment (CPA), Area Amendment (AA), and Planned Unit Development (PUD) for their property. The application, identified as CPA/AA/PUD-2025-00010, is currently under review by the Special Master Hearing in Citrus County. This project proposes a change in land use for the Lecanto Sand Mine site. The review process is in its early stages, indicating potential future development opportunities. If approved, this project could involve significant site preparation, including clearing and grading, followed by construction phases. This would likely create work for general contractors, site prep and grading services, concrete and masonry specialists, and potentially utility contractors. Businesses that supply building materials and equipment may also find opportunities. Early engagement with the applicant or county planning staff could provide insight into project timelines and requirements as plans develop.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Address:
Lecanto Sand Mine
Applicant:
Lecanto Sand LLC

G. APPLICATIONS

A Special Master Hearing is scheduled to consider CPA/AA/PUD-2025-00010, an application related to the Lecanto Sand Mine. This item is currently under review by the Citrus County Special Master. The process involves a hearing where the application will be discussed. This early stage in the review process means that potential contractors, suppliers, and service providers have an opportunity to engage before detailed site plans, bids, and permits are finalized. Businesses involved in site preparation, grading, utility work, construction, and material supply may find opportunities as this project moves forward. Early engagement can provide a competitive advantage.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Applicant:
Lecanto Sand LLC

Special Magistrate Hearing Lecanto Sand Mine

This document is an agenda for a Special Master Hearing concerning CPA/AA/PUD-2025-00010, related to Lecanto Sand LLC. The hearing is scheduled for June 5, 2026, at 9:00 AM at the Lecanto Government Building, 3600 W. Sovereign Path, Room 166, Lecanto, Florida 34461. The agenda includes standard meeting procedures and a specific application item for Lecanto Sand LLC. No specific project details beyond the case number and applicant are provided on this agenda.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda
Address:
3600 W. Sovereign Path Room 166, Lecanto Florida 34461
Applicant:
Lecanto Sand LLC

Special Master Hearing Lecanto Sand Mine

Special Master Hearing for Lecanto Sand LLC regarding a Comprehensive Plan Amendment (CPA), rezoning (AA), and Planned Unit Development (PUD) for a new sand mine. The project involves amending the Future Land Use Map from Low Density Residential to Extractive District and the Land Development Code Atlas Map to allow for a sand mine with a Planned Unit Development. The hearing is scheduled for June 5, 2026. The applicant, Lecanto Sand LLC, is seeking approval for a 70-acre project to be used as a borrow pit for site and roadway fill, serving the Suncoast Extension, a new Home Depot, and local contractors. The sand will be sold to the general public. The location is within Sections 18 and 19, Township 19 South, Range 18 East, with specific parcel IDs and associated street addresses on S McClure Point and S Race Ave. The document details extensive requirements for mining operations, including environmental controls, reclamation plans, financial responsibility, development standards, setbacks, surface water and wetland protection, traffic circulation, and reporting. No public comment is stated in this document.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_packet
Address:
2899, 2945, 2991, 3097, 3098, 3195, 3196, 3311, 3318, 3444 and 3441 S McClure Point; and 2968, 3096, 3194, 3316 and 3448 S Race Ave., Lecanto, FL
Applicant:
Lecanto Sand LLC

a) For any earthen berms approved hereunder, the toe of the slope nearest the public road shall be at least fifty

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. A parking area large enough to accommodate all transport vehicles used for the mining operation shall be provided on site unless alternative transportation method is used (e.g. barge). The parking area shall be accessible prior to hours of operation. Trucks, other vehicles, or other equipment used to conduct mining operations shall not stand or park on public road rights-of-way.

A special master hearing is scheduled to consider a proposed change to the land use plan and a planned unit development for the Lecanto Sand Mine. The proposal requires that a parking area be provided on site for all transport vehicles used in the mining operation, unless an alternative transport method like a barge is used. This parking area must be accessible before mining operations begin each day. Trucks and other equipment used for mining will not be allowed to park on public roads. This item is currently under review. The project would involve site preparation for the parking area, potentially including grading and paving, and the installation of necessary access. Contractors specializing in site preparation, grading, paving, and potentially concrete work could be involved. Suppliers of construction materials and equipment would also be needed. Reaching out to the applicant or relevant county departments early could provide an advantage before final site plans and permits are established.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Address:
Lecanto Sand Mine
Applicant:
Lecanto Sand Mine

a. All disturbed areas of the subject property must be revegetated within twenty-four (24) months after completion of operations in the mining unit or phase, or within twenty-four (24) months after the cessation of excavation activity.

This item concerns the Lecanto Sand Mine, located in Citrus County. The proposal requires that all areas disturbed by mining operations be revegetated within twenty-four months after operations end in a mining unit or phase, or after excavation stops. This is a planned item currently under review by a Special Master. The project will involve site clearing and grading, followed by extensive landscaping and revegetation efforts. Contractors specializing in site preparation, grading, and landscaping services, as well as suppliers of soil, seeds, and plants, could find opportunities. Engaging early before final plans are set may offer a competitive advantage.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Address:
Lecanto Sand Mine

a. Any violation or failure to conduct mining operations in a manner which is consistent with the requirements stated herein shall constitute both a violation of the mining permit or other authorization and a violation of the County Land Development Code.

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. Biennial Mining and Reclamation Report Standards: The biennial Mining and Reclamation Report shall contain the following:

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. CPA/AA/PUD-2025-00010 Lecanto Sand, LLC

Lecanto Sand, LLC is requesting to change the future land use map for property in Sections 18 and 19, Township 19 South, Range 18 East. The request is to change the land use from Low Density Residential to Extractive. They also want to change the zoning from Low Density Residential with mobile homes allowed to Extractive with a Planned Unit Development for a new sand mine. This item is currently under review by the Special Master. If approved, this project would involve site preparation for mining operations. This could include clearing, grading, and potentially specialized equipment for extraction. Contractors involved in site work, heavy equipment operation, and potentially environmental services could be needed. Reaching out to Lecanto Sand, LLC or the Department of Growth Management early could provide an advantage before final plans and permits are established.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Address:
Sections 18 and 19, Township 19 South, Range 18 East
Applicant:
Lecanto Sand, LLC

a. Except for buffers, berms, fences, access drives, on-site utilities (including stormwater), monitoring wells and wildlife relocation activities, all activities for mining shall maintain the following setbacks: NO STRUCTURES ARE PROPOSED ON THIS PROJECT.

A special master hearing is planned for the Lecanto Sand Mine CPA/AA/PUD-2025-00010 project in Citrus County. This project proposes mining operations for limestone, dolomite, and phosphate, as well as other materials. The plan includes specific setback requirements from public roads, permanent buildings, public parks, and residentially committed properties. No structures are proposed as part of this mining project itself, though buffers, berms, fences, access drives, on-site utilities, monitoring wells, and wildlife relocation are mentioned. The item is currently under review, with a special master hearing scheduled. The work would involve site preparation for mining, including potential clearing and grading, installation of on-site utilities and stormwater management systems, and wildlife relocation activities. Contractors specializing in site preparation, utility work, and environmental services may find opportunities as this project moves forward. Engaging early could provide an advantage before final site plans and permits are established.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. Maximum depth. Maximum excavation depth shall be determined through the Planned Unit Development approval process after reviewing the site-specific geotechnical reports and recommendations of SWFWMD, FDEP, and County staff, as applicable. The permitted depth shall not exceed the depth permitted by the SWFWMD, FDEP as applicable and shall not penetrate through impervious soil or other confining layer that presently prohibits intermingling of two or more aquifers that degrades water quality. ALL MINING WILL CEASE ABOVE THE TOP OF THE CLAY LAYER OR LIMESTONE LAYER; ONLY SAND WILL BE EXCAVATED.

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. Mining activity shall not cause unmitigated interference with adjacent or nearby legal users of water. Examples of interference with adjacent or nearby users of water shall include, but are not limited to, lowering of water elevations farm and fish ponds, crop failure, water well failure or significant decrease in well efficiency, or increased irrigation requirements. Proposed mining operations utilizing active dewatering must be approved by the Board of County Commissioners as a PUD application. All dewatering operations shall be conducted to maximize recharge to the aquifer via on-site methods, and in compliance with the Southwest Florida Water Management

This item concerns a proposed mining activity that is currently under review by a Special Master. The proposal involves mining operations that may require active dewatering, which would need approval from the Board of County Commissioners as a Planned Unit Development (PUD) application. The mining activity is planned to occur on property described in the mining permit, with assurances that groundwater or surface water levels and quality will not be affected offsite. All water from the mine is intended to remain on the property, and no chemicals will be used. This review stage means that detailed site plans, permits, and specific construction phases are still being determined. Businesses involved in site preparation, dewatering, water management, and potentially heavy construction could find opportunities as this project moves forward. Early engagement with the applicant or relevant county departments may provide insight into upcoming needs before formal bidding processes begin.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. New and expanded mines proposing impacts to wetlands and surface waters must be approved by the Board of County Commissioners as a PUD application.

This item concerns a proposed new and expanded mine that would impact wetlands and surface waters. The project requires approval as a Planned Unit Development (PUD) application by the Board of County Commissioners. The process is currently at the Special Master Hearing stage, indicating it is under review. If approved, the project would involve significant site clearing and grading, potentially including earthmoving and excavation. It may also require extensive stormwater management systems and utility work. The scope could extend to road construction or improvements for access and material transport. This early stage presents an opportunity for contractors, suppliers, and service providers to engage before final plans and permits are issued. Early involvement allows businesses to understand project needs and prepare for potential bids.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Applicant:
Lecanto Sand Mine

a. Photos

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. Positioning and installation of rain gauges, staff gauges, and piezometers as necessary to acquire professionally acceptable data on the performance of mitigation measures.

This item concerns the Lecanto Sand Mine project, identified as CPA/AA/PUD-2025-00010, within Citrus County. The project involves the positioning and installation of rain gauges, staff gauges, and piezometers. These instruments are needed to collect professional data on how well mitigation measures are working. This item is currently under review by a Special Master. The work will likely involve site preparation for instrument placement, installation of the gauges and sensors, and potentially ongoing data collection services. Local contractors, suppliers, and service providers in environmental monitoring, surveying, and site preparation could find opportunities. Early engagement before final plans and permits are set could be advantageous.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

a. The amount of insurance shall be a minimum of two million dollars per incident, and five million dollars aggregate.

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

b) All earthen berms shall be constructed with slopes not steeper than four (4) horizontal to one (1) vertical in order to permanently support ground cover without any noticeable erosion. Promptly after construction, berms shall be permanently vegetated to present an attractive appearance and prevent soil erosion.

This item concerns proposed earthen berms for a project at the Lecanto Sand Mine in Citrus County. The berms are planned to have slopes no steeper than four horizontal to one vertical. They must be permanently vegetated soon after construction to prevent erosion and look good. This project is currently under review. The work would involve site preparation, grading, and landscaping. Contractors specializing in site clearing, grading, and vegetation could find opportunities. Reaching out now, before final plans are set, allows businesses to understand the project's needs.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Address:
Lecanto Sand Mine
Applicant:
Lecanto Sand Mine

b. A vegetative buffer meeting the planting standards of a Type "D" enhanced buffer, fifty (50) feet in width, eight (8) feet in height, and 75% opacity within two years of issuance of the mining permit shall be maintained along all property lines not previously addressed in this section. Native vegetation equivalent to the planting and fifty (50)-foot depth of a Type "D" buffer may substitute for a planted buffer.

Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item

b. Any road connection to any public road is to be constructed and maintained to the standards of the County or FOOT, whichever has jurisdiction.

This item concerns a proposed sand mine located in Lecanto, Citrus County. The project, identified as CPA/AA/PUD-2025-00010, is currently under review by a Special Master. A key aspect of the proposal involves the construction and ongoing maintenance of any road connections to public roads. These connections must meet the standards set by the County or FOOT, depending on which entity has authority over the specific road. This stage of review suggests that detailed planning for site access and infrastructure is beginning. Businesses involved in road construction, paving, and maintenance, as well as suppliers of related materials, may find opportunities as this project moves forward. Early engagement could be beneficial as project specifics are still being determined.

Board:
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
Date:
2026-06-05
Type:
Agenda_item
Applicant:
Lecanto Sand Mine

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta