Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010: junio de 2026
Citrus County
d. The insurer shall have a currently valid certificate of authority to provide insurance issued by the office of the Florida Office of Insurance Regulation Commissioner and must be in compliance with all other requirements of the Florida Insurance Code.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
d. The mine owner/operator shall investigate and fully respond to all complaints of water well interference and/or dewatering of adjacent and nearby areas which interferes with the beneficial use of groundwater on lands not under the ownership or control of the permittee hereunder. The County shall require a mitigation plan to mitigate for all documented interference or dewatering in nearby and adjacent areas. Any mitigation plan required hereunder shall become a binding condition of the
This item concerns a mining operation and its impact on nearby water wells. The mine owner must investigate and respond to complaints about water well interference or dewatering. The county will require a plan to fix any documented problems. This plan will become a condition of the mining permit. The current status is under review by a Special Master. This process could lead to work in site preparation, grading, and potentially water management systems. Contractors specializing in environmental services, site work, and possibly utility or water management could find opportunities. Engaging early before final plans and permits are set may offer an advantage.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
d. The permittee under any mining permit issued hereunder shall also comply with any applicable setbacks established in, or required by, the County Comprehensive Plan, or any other regulatory permit required pursuant to Chapter 403, Florida
This item concerns a planned mining operation. The permittee must follow setback rules from the County Comprehensive Plan and other permits. This includes rules from Florida Statutes and the Clean Water Act, with the strictest setback applying. The project is currently under review. This process could lead to site clearing, grading, and potentially construction related to mining operations. Businesses involved in site preparation, heavy equipment operation, and environmental compliance could find opportunities. Early engagement is advised before final plans and permits are set.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Applicant:
- Lecanto Sand Mine
d. USFWS Citrus County Listed Species
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
d. Wetlands, lakes, ponds, canals and other water bodies shall be protected from the adverse effects of development by compliance with applicable requirements of the U.S. Army Corps of Engineers, the FDEP, and the SWFWMD.
This item concerns the Lecanto Sand Mine project, which is currently under review. The project is subject to requirements for protecting wetlands, lakes, ponds, canals, and other water bodies from development impacts. Compliance with regulations from the U.S. Army Corps of Engineers, the FDEP, and the SWFWMD will be necessary. This review stage means that planning and design work is ongoing. The project will likely involve site preparation, grading, and construction activities that must adhere to strict environmental protection standards. Contractors and suppliers specializing in environmental compliance, site work, and potentially water management systems could find opportunities. Engaging early is advisable as specific project plans and permitting are still being finalized.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Applicant:
- Lecanto Sand Mine
e. Additional reclamation requirements may be specified by the County in the mining permit.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
e. FWC State of Florida Threatened / Endangered Species List
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
e. In the event that the mine operator fails to implement any mitigation plan approved as a condition to the mining permit, the County shall institute enforcement proceedings pursuant to_ Citrus County Code to require mitigation, together with continued monitoring. The applicant shall be liable to the County for all costs incurred in such mitigation, which shall be collected by the County as provided by Citrus County Code. UNDERSTOOD.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
e. No mining shall be allowed within five-hundred (500) feet of the ordinary or mean high water line of any Outstanding Florida Water.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
e. The Board of County Commissioners may allow reduced setbacks in the context of a Planned Unit Development approval provided: NO REQUESTED SETBACK REDUCTIONS.
This item concerns a potential Planned Unit Development (PUD) approval for the Lecanto Sand Mine, located in Citrus County. The Board of County Commissioners may consider reduced setbacks as part of this PUD approval. However, no specific setback reductions have been requested at this time. The project is currently under review by a Special Master. If approved, this PUD could involve site preparation, grading, utility work, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final site plans, bids, and permits are established could provide a competitive advantage for future work related to this development.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Address:
- Lecanto Sand Mine
e. The insurer shall have at least an A+ rating in the latest issue of Best's Key Rating Guide.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
f. A minimum seventy-five (75) foot undisturbed buffer shall be maintained in all areas adjacent to perennial rivers, streams and creeks. A minimum thirty-five (35) foot undisturbed buffer shall
This item concerns proposed land use regulations for a mining operation. Specifically, it outlines requirements for undisturbed buffer zones around water features. A seventy-five foot buffer is required next to rivers, streams, and creeks. A thirty-five foot buffer is needed around wetlands, unless impacts are permitted and mitigated. This matter is currently under review by a Special Master. The proposed regulations will guide future site development and environmental protection measures. Contractors involved in site preparation, grading, and environmental services may find opportunities as this plan moves forward. Early engagement with the applicant or relevant agencies could provide insight into specific project needs and timelines.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Applicant:
- Lecanto Sand Mine
f. FNAI Listed Plant Species Database
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
f. The implementation and success of any mitigation plan, as well as all complaints of water well interference and dewatering of adjacent or nearby areas, and the mine operator's investigation and response thereto, shall be included in the Biennial Mining and Reclamation Report, unless resolved to the satisfaction of the complainant. UNDERSTOOD.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
f. The insurer shall be a current member in good standing of the Florida Insurance Guaranty Association.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
g. Insurance satisfying these requirements shall be continuously in effect at all times during the term of the mining permit and until all mining operations cease and reclamation is released as provided by Citrus County Code. Failure to comply with the requirements for insurance as stated hereunder shall constitute a violation of Citrus County Code and shall constitute grounds for suspensions or revocation of the Mining Permit.
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
g. Invasive / Exotic Plant Species Documentation
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
g. Mining within the aquifer must be approved by the Board of County Commissioners as a Planned Unit Development. UNDERSTOOD.
A special master hearing is scheduled to consider a request for a Planned Unit Development (PUD) related to mining operations. This item, CPA/AA/PUD-2025-00010, is currently under review by Citrus County. The proposal involves mining activities that require specific approval as a PUD. The process is in its early stages, with a hearing before the special master. If approved, this could lead to site preparation, extraction, and processing activities. Businesses involved in mining, heavy construction, and related support services may find opportunities as the project moves forward. Early engagement is advised as plans develop.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
g. No alteration of the buffer shall be permitted, including destruction of existing vegetation or alteration of the natural topography.
This item concerns a proposed change to the Lecanto Sand Mine, located in Citrus County. The proposal involves a Comprehensive Plan Amendment (CPA), Abandoned Mine Land (AML) application, and Planned Unit Development (PUD). The specific action under review is a restriction on altering the existing buffer zone, which includes preventing the destruction of vegetation and changes to the natural landscape. This matter is currently under review by a Special Master. If approved, the project could involve site preparation and landscaping to maintain or enhance the buffer zone. Contractors specializing in site clearing, grading, and landscaping may find opportunities. Early engagement is advised as plans are still being developed.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Address:
- Lecanto Sand Mine
- Applicant:
- Lecanto Sand Mine
h. Mining operations shall not result in any significant off-site increase/decrease in surface water levels. Significant shall be defined as a 10 percent (10%) or greater change from the baseline established in the geotechnical report, unless otherwise addressed by a State rule or permit.
This item concerns a proposed mining operation, Lecanto Sand Mine CPA/AA/PUD-2025-00010, located in Citrus County. The proposal includes conditions for mining operations, specifically addressing surface water levels. Mining activities must not cause a change of 10 percent or more in surface water levels compared to a baseline set in a geotechnical report, unless state rules or permits allow for it. This item is currently under review by a Special Master. The project is in its early stages, and if approved, could involve site preparation, mining operations, and environmental monitoring. Contractors specializing in mining, site work, and environmental services may find opportunities as the project progresses through planning and permitting.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Applicant:
- Lecanto Sand Mine
h. Protection of Drinking Water Sources: The mine operator shall provide a site plan that reflects all potable water sources, including private wells, within 1000 feet of the property line of
A special master hearing is scheduled for June 5, 2026, regarding the Lecanto Sand Mine CPA/AA/PUD-2025-00010 in Citrus County. The mine operator is required to submit a site plan showing all drinking water sources, including private wells, within 1000 feet of the mine's property line. The project must meet groundwater quality and quantity standards set by the FDEP and SWFWMD. This review stage means that planning and design work is underway. The project will involve site assessment, groundwater monitoring, and potentially the development of new well protection measures. Contractors specializing in environmental services, site planning, and potentially well drilling or repair could find opportunities as this project moves forward. Engaging early could provide an advantage before final plans and permits are established.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Address:
- Lecanto Sand Mine property line
- Applicant:
- Lecanto Sand Mine
i. defines the potentiometric contours, elevations (feet NGVD) and direction of movement of groundwater flow within the mining property or district, and
Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010 listed this item on its agenda for 2026-06-05 in Citrus County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
ii. defines potentiometric elevations below which mining operations may not occur.
A special master hearing is planned for a mining operation in Lecanto, Citrus County. The proposal involves a Master Mining Plan that includes phased excavation activities across 40-acre sections. Sand will be excavated and directly loaded onto trucks for transport, without on-site processing. The plan requires a groundwater monitoring and reporting plan, a Pollution Prevention Plan with Best Management Practices, and a stormwater pollution prevention plan. Biological and geotechnical reports are also required. This item is currently under review, with a hearing scheduled. The project will involve site clearing and grading, excavation, and potentially stormwater management system installation. Contractors specializing in site preparation, heavy equipment operation, environmental consulting, and potentially utility work could find opportunities. Early engagement is advised as plans and permits are being finalized.
- Board:
- Special Master Hearing - Lecanto Sand Mine CPA/AA/PUD-2025-00010
- Date:
- 2026-06-05
- Type:
- Agenda_item
- Address:
- Lecanto Sand Mine
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta