2. Lighting is fed directly from Utility secondary distribution system via closest
Apopka City Commission Meeting · 2026-05-20 · agenda_item
This item concerns proposed utility work for lighting systems in Apopka. The lighting will be powered directly from the Duke Energy secondary distribution system, using the nearest transformer. All Duke Energy conductors will be installed in conduit at a minimum depth of 36 inches below finished grade, following National Electrical Safety Code standards for utility work. This project is currently under review. The work will involve trenching, conduit installation, and electrical connections for the lighting system. This early stage presents an opportunity for contractors and suppliers specializing in electrical work, underground utilities, and site preparation to engage with the project stakeholders. Early involvement can provide a competitive advantage as plans and permits are developed.
- conduit depth
- 36 inches
Industries that could win this work
- Electrical
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta