Skip to main content

Sé el Primero, Construye Relaciones Duraderas

S. Binion Road Ocoee Apopka RoadApopka Exressway (Western Beltway)

Apopka Planning Commission Meeting · 2026-06-09 · agenda_item

A major development is planned for the area generally north and south of Boy Scout Road, west of SR 451, and east of Binion Road in Apopka. This project involves rezoning approximately 366.6 acres from various residential and commercial districts to a Planned Development (PD) designation. The plan includes residential units (single-family, townhomes, and multi-family), commercial spaces, and office areas. This proposal is currently under review, having received a Major Development Plan Approval that is not yet for construction. The project will involve extensive site clearing and grading, installation of underground utilities including water, sewer, and stormwater systems, paving of new roads and driveways, and the construction of multiple buildings. Contractors specializing in site preparation, underground utilities, concrete, paving, framing, electrical, plumbing, HVAC, roofing, painting, and landscaping may find opportunities. Reaching out to the project team early, before final bids and permits are issued, could provide a competitive advantage.

acres
366.6 AC
units
1259 units
SF <2,000
390 SF
MF
678 MF
TH
191 TH

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Roofing
  • Painting & Flooring
  • Building & Industrial Supply
  • Engineering & Architecture
  • Real Estate Development

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta