DRC Agenda 05/27/2026
Development Review Committee Meeting · 2026-05-27 · agenda
[519 South Central Avenue to 225 M A Board Street; case E-26-5] Special Event: E-26-5 Apopka Juneteenth Parade. The parade begins at 519 South Central Avenue and ends at 225 M A Board Street on June 20th, 2026, from 2:00 PM to 7:00 PM. Owner is Transform Outreach Inc, and applicant is Keyomi Jones. The route involves specific turns on Central Avenue, 10th Street, Marvin Zanders, and M A Board Street. [2022 Johns Rd, 2150 Johns Road, 2158 Johns Road, 2156 Johns Road, 2166 Johns Road, 2182 Johns Road, Johns Road, 885 S Binion Road, 701 S Binion Road, 875 S Binion Road; case PL-25-8] Plat Application: PL-25-8 Eden Crest Phase 2. This is the second submittal for a plat application. Owner is Apopka Project I LLC, and applicant is Appian Engineering LLC - Ovidio Sanchez. The location includes multiple addresses on Johns Road and S Binion Road. The proposed use is a 1115 lot subdivision. [2560 W Orange Blossom Trail; case MDP-26-3] Major Development Plan: MDP-26-3 Revised Cold Link Apopka MDP. This is the first submittal for a revised Major Development Plan. Owner is MG88 Central Florida Cold Storage II LLC, and applicant is Kimley-Horn - Joshua Enot. The location is 2560 W Orange Blossom Trail. The proposed use is to construct a 168,180 sq ft building. [4648 Chandler Road; case CSP-26-21] Construction Site Plan Amendment: CSP-26-21 Chandler Row CSP Amendment. This is the first submittal for a Construction Site Plan amendment. Owner is MRP HNHB LLC, and applicant is Kiley-Horn and Associates Inc. - Brian Ashby. The location is 4648 Chandler Road. The proposed use is for 240 Unit Attached Single Family (townhomes).
Agenda items
- 1. CSP-26-21 - Chandler Row CSP Amendment - Construction Site Plan (CSP), (1st Submittal)
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Plumbing
- Electrical
- HVAC & Climate Control
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. CSP-26-21 - Chandler Row CSP Amendment - Construction Site Plan (CSP), (1st Submittal)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. E-26-5 Apopka Juneteenth Parade - Beginning at 519 South Central Avenue and Ending at 225 M A Board Street
- Event Planning & Rentals
- Legal Services
- Engineering & Architecture
- Waste Management
- Government Authority
- 1. E-26-5 Apopka Juneteenth Parade - Beginning at 519 South Central Avenue and Ending at 225 M A Board Street
- Event Planning & Rentals
- Security Services
- Business Consulting
- 1. MDP-26-3 - Revised Cold Link Apopka MDP - Major Development Plan (MDP), 1st Submittal
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. MDP-26-3 - Revised Cold Link Apopka MDP - Major Development Plan (MDP), 1st Submittal
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. PL-25-8 - Eden Crest Phase 2 - Plat Application (PL), (2nd Submittal)
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Utilities (Sub)
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Landscaping & Lawn Service
- 1. PL-25-8 - Eden Crest Phase 2 - Plat Application (PL), (2nd Submittal)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. WASHOUT AREA TO CONTAIN A MINIMUM OF 3 CY (IE 9' BY 9' BY 1' DEEP).2. REMOVE AND LEGALLY DISPOSE OF WASTE MATERIAL WHEN ITACCUMULATES TO 2/3 OF WET STORAGE CAPACITY.3. CONCRETE WASHOUT AREA TO BE REPAIRED AND/OR ENLARGED ASNECESSARY TO MAINTAIN CAPACITY.4. UPON COMPLETION OF CONSTRUCTION ACTIVITIES REQUIRING CONCRETEWASHOUT, REMOVE WASHOUT AND RESTORE THE AREA TO FINISH GRADE.5
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta