[Beginning at 519 South Central Avenue and Ending at 225 M A Board Street; case E-26-5] A parade/procession is planned to begin at 519 South Central Avenue and end at 225 M A Board Street on June 20th, 2026, from 2:00 PM to 7:00 PM. The owner is Transform Outreach Inc, and the applicant is Keyomi Jones. [2022 Johns Rd, 2150 Johns Road, 2158 Johns Road, 2156 Johns Road, 2166 Johns Road, 2182 Johns Road, Johns Road, 885 S Binion Road, 701 S Binion Road, 875 S Binion Road; case PL-25-8] Eden Crest Phase 2 is a plat application for a 1115 lot subdivision. The owner is Apopka Project I LLC, and the applicant is Appian Engineering LLC - Ovidio Sanchez. The location includes multiple addresses on Johns Road and S Binion Road. [2560 W Orange Blossom Trail; case MDP-26-3] Revised Cold Link Apopka MDP proposes the construction of a 168,180 sq ft building. The owner is MG88 Central Florida Cold Storage II LLC, and the applicant is Kimley-Horn - Joshua Enot. The location is 2560 W Orange Blossom Trail. The project involves rezoning two parcels once annexed into the City of Apopka. [4648 Chandler Road; case CSP-26-21] Chandler Row CSP Amendment proposes a 240 Unit Attached Single Family (townhomes) development. The owner is MRP HNHB LLC, and the applicant is Kiley-Horn and Associates Inc. - Brian Ashby. The location is 4648 Chandler Road.
Agenda items
- 1. CSP-26-21 - Chandler Row CSP Amendment - Construction Site Plan (CSP), (1st Submittal)
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Plumbing
- Electrical
- HVAC & Climate Control
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. CSP-26-21 - Chandler Row CSP Amendment - Construction Site Plan (CSP), (1st Submittal)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. E-26-5 Apopka Juneteenth Parade - Beginning at 519 South Central Avenue and Ending at 225 M A Board Street
- Event Planning & Rentals
- Legal Services
- Engineering & Architecture
- Waste Management
- Government Authority
- 1. E-26-5 Apopka Juneteenth Parade - Beginning at 519 South Central Avenue and Ending at 225 M A Board Street
- Event Planning & Rentals
- Security Services
- Business Consulting
- 1. MDP-26-3 - Revised Cold Link Apopka MDP - Major Development Plan (MDP), 1st Submittal
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. MDP-26-3 - Revised Cold Link Apopka MDP - Major Development Plan (MDP), 1st Submittal
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. PL-25-8 - Eden Crest Phase 2 - Plat Application (PL), (2nd Submittal)
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Utilities (Sub)
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Landscaping & Lawn Service
- 1. PL-25-8 - Eden Crest Phase 2 - Plat Application (PL), (2nd Submittal)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. WASHOUT AREA TO CONTAIN A MINIMUM OF 3 CY (IE 9' BY 9' BY 1' DEEP).2. REMOVE AND LEGALLY DISPOSE OF WASTE MATERIAL WHEN ITACCUMULATES TO 2/3 OF WET STORAGE CAPACITY.3. CONCRETE WASHOUT AREA TO BE REPAIRED AND/OR ENLARGED ASNECESSARY TO MAINTAIN CAPACITY.4. UPON COMPLETION OF CONSTRUCTION ACTIVITIES REQUIRING CONCRETEWASHOUT, REMOVE WASHOUT AND RESTORE THE AREA TO FINISH GRADE.5
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta