4. Connections & Restoration

City Commission Meeting · 2026-06-04 · agenda_item

The City of Cocoa Beach Public Works is planning an electrical restoration project at the parking garage located at 2 South Orlando Avenue. This project involves reconnecting all circuits to existing panels, equipment, and devices, and ensuring all systems are fully operational. The work will follow the National Electrical Code and applicable Florida Building Code requirements. The estimated duration for this project is 6 to 8 weeks, depending on site access and phasing. This project is currently under review, with proposals being considered. The scope of work includes removing existing rusted conduit and metallic boxes, and providing and installing new PVC conduit, boxes, and wiring. This presents an opportunity for electrical contractors, suppliers of electrical materials, and potentially general contractors to engage in site preparation and electrical system work. Early engagement is advised as plans and permits are being finalized.

Total Proposal Cost
159,453.50 $
Total
194,328.36 $
Estimated duration
6–8 weeks

Industries that could win this work

  • Electrical
  • General Contractor
  • Building & Industrial Supply

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta