Skip to main content

Sé el Primero, Construye Relaciones Duraderas

D) Max. Lot Coverage > 30%

City Council Meeting · 2026-04-28 · agenda_item

The City of Cocoa is reviewing proposed development standards that would affect future construction projects. These standards include limits on maximum lot coverage at 30% and maximum impervious area at 70%. They also specify minimum setbacks for front (20 feet), rear (10 feet), and side (10.5 feet) yards. The review is currently planned, indicating an early stage in the public process. If approved, these standards will guide the design and construction of new residential developments, potentially involving site preparation, grading, utility work, foundation and framing, and final landscaping. Local contractors, suppliers, and service providers should monitor this review as it could shape upcoming construction opportunities. Engaging early could provide an advantage before specific site plans and permits are finalized.

max. lot coverage
30 %
max. impervious area
70 %
min. rear setback
10 feet
min. front setback
20 feet
min. side setback
10.5 feet
1st floor square footage
1295 SF
bedrooms
3 BR
bathrooms
2.5 Bath
1st floor square footage
1524 SF
1st floor square footage
1684 SF
bedrooms
4 BR

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Carpentry & Cabinetry
  • Electrical
  • HVAC & Climate Control
  • Painting & Flooring
  • Plumbing
  • Roofing
  • Drywall & Insulation
  • Windows, Doors & Glass
  • Building & Industrial Supply
  • Real Estate Development
  • Engineering & Architecture
  • Landscaping & Lawn Service

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta