2. Consideration, Old Daytona Road Bridge Replacement Design
City Commission Regular Meeting · 2026-06-15 · agenda_item
The City of DeLand is considering a bridge replacement project for Old Daytona Road. This project is currently under review by the City Commission. The proposed work involves the design phase for the bridge replacement. This early stage means that detailed site plans, bids, and permits are not yet finalized. Businesses involved in engineering, design, and potentially early site assessment could find opportunities. Reaching out now allows contractors, suppliers, and service providers to understand the project's scope and prepare for future phases, which could include construction, materials supply, and specialized trades once the design is approved and funding is secured.
- CPH Task Assignment No. 31
- 31
- amount not to exceed
- 258133 .00
Industries that could win this work
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Windows, Doors & Glass
- Utilities (Sub)
Follow this across meetings
Applicants and firms
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta