Skip to main content

Sé el Primero, Construye Relaciones Duraderas

2. Consideration, Old Daytona Road Bridge Replacement Design

City Commission Regular Meeting · 2026-06-15 · agenda_item

The City of DeLand is considering a bridge replacement project on Old Daytona Road. This project involves the design phase for replacing the existing bridge. The City Commission is set to review CPH Task Assignment No. 31, which outlines the design work for this replacement. This item is currently under review by the City Commission. The scope of work will focus on the design and engineering aspects of the bridge replacement. This could lead to future construction phases for site preparation, utility work, and the actual bridge construction. Local contractors, suppliers, and service providers in areas such as engineering, design, and potentially future construction trades could find opportunities by engaging early. Understanding the project's early stage allows businesses to prepare for potential future bid processes.

CPH Task Assignment No.
31
maximum amount
258,133.00 $

Industries that could win this work

  • Engineering & Architecture
  • General Contractor
  • Building & Industrial Supply
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • Plumbing
  • HVAC & Climate Control
  • Roofing
  • Painting & Flooring
  • Drywall & Insulation
  • Carpentry & Cabinetry
  • Windows, Doors & Glass
  • Utilities (Sub)

Follow this across meetings

Applicants and firms

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta