Technical Review Committee (TRC): junio de 2026
City of DeLand
1. Applicant Name: Joseph tucker – D.R. Horton Inc.
A proposal is under review for a townhome sales office at 1728 Sugarwood Loop. The project, known as SP26-079, Towns at Summit - Model, is planned for a 0.38-acre site. This item is currently under review by the Technical Review Committee. If approved, the project would involve site preparation, construction of a sales office building, and associated landscaping. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about potential opportunities as plans develop, before bids and permits are finalized.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- 1728 Sugarwood Loop
- Applicant:
- Joseph Tucker
1. Applicant Name: Michael Wojtuniak – Engineered Permits Inc.
A Class II Site Plan is under review for a new 9,975 square foot Ace Hardware store. The project is proposed for a 1.466 acre site located at the intersection of South Amelia Avenue and East Howry Avenue. This item is currently under review by the Technical Review Committee. If approved, the project would involve site clearing and grading, followed by underground utility work, concrete and paving for the building foundation and parking areas. Construction would then proceed with vertical framing, roofing, and interior build-out, including electrical, plumbing, and HVAC systems. Finally, finishing trades and landscaping would complete the project. Local contractors, trades, suppliers, and service providers should consider reaching out to the applicant or project manager now, as this project is in the early review stages before final site plans, bids, and permits are issued.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- S Amelia and E Howry Ave
- Applicant:
- Michael Wojtuniak
1. Review of May 21, 2026 TRC Meeting Minutes
Technical Review Committee (TRC) listed this item on its agenda for 2026-06-18 in City of DeLand. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
2. Applicant Name: Parker Mynchenberg – Parker Mynchenberg & Associates
A concrete pad expansion project is planned for 2.5 acres at 725 E Summerhill Ave. The applicant, Parker Mynchenberg & Associates, is proposing this expansion. This project is currently under review by the Technical Review Committee. The work would likely involve site preparation, concrete pouring, and potentially utility connections. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the applicant and project manager, Sam Nelson, before final plans and permits are issued. Early involvement can help businesses position themselves for potential work related to site clearing, grading, concrete services, and related trades.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- 725 E Summerhill Ave
- Applicant:
- Parker Mynchenberg
2. Applicant Name: Scott Thacker – Stetson University
Stetson University is proposing to build a new softball covered hitting facility at 430 E Arizona Ave. The project, named SP26-076, would cover 2.63 acres and involve constructing a 4,320 square foot pole-barn structure over existing batting cages. This item is currently under review by the Technical Review Committee. The project is expected to involve site preparation, foundation work, the erection of the pole-barn structure, and potentially electrical and lighting installations. Local contractors, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase before site plans, bids, and permits are finalized, offering an advantage in securing future work.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- 430 E Arizona Ave
- Applicant:
- Scott Thacker
3. Applicant Name: Matt Dowst – Mark Dowst & Associates, Inc.
A dealership expansion is planned for 1960 S Woodland Blvd. The project covers 3.76 acres and is proposed by Matt Dowst of Mark Dowst & Associates, Inc. This item is currently under review by the Technical Review Committee. The project would involve site clearing and grading, followed by underground utility work and paving for expanded lot space. Vertical construction for new dealership facilities would then proceed, along with mechanical and finish trades. Finally, landscaping would complete the expansion. Contractors, suppliers, and service providers in site prep, concrete, paving, building construction, electrical, plumbing, HVAC, and landscaping could find opportunities. Reaching out to the applicant or project manager early, before final plans and permits are set, offers the best chance to compete for this work.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- 1960 S Woodland Blvd
- Applicant:
- Matt Dowst
4. Applicant Name: Matt Dowst – Mark Dowst & Associates, Inc.
A special exception for a dealership expansion is planned for 3.76 acres at 1960 S Woodland Blvd. Matt Dowst of Mark Dowst & Associates, Inc. is the applicant for this project, named SE26-109, RC Hill Mitsubishi. The project is currently under review by the Technical Review Committee. This expansion would likely involve site clearing and grading, followed by construction of new dealership facilities. Underground utility work, paving for lot expansion, and final landscaping would also be part of the project. Contractors, suppliers, and service providers interested in potential work should consider reaching out early, before final site plans, bids, and permits are established. This early engagement could offer an advantage in securing future business related to this dealership expansion.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda_item
- Address:
- 1960 S Woodland Blvd
- Applicant:
- Matt Dowst
June 18, 2026 Technical Review Committee Agenda
[S Amelia and E Howry Ave; 430 E Arizona Ave; 1728 Sugarwood Loop; 725 E Summerhill Ave; 1960 S Woodland Blvd; case SP25-120; SP26-076; SP26-079; SP26-112; SP26-111; SE26-109] Project 1: Ace Hardware Class II Site Plan. 1.466 acres at S Amelia and E Howry Ave. Proposed 9,975 sq ft hardware store. Applicant: Michael Wojtuniak – Engineered Permits Inc. Case Number: SP25-120. Decision: Not stated. Key Dates: Reviewed June 18, 2026. Project 2: Stetson University Softball Covered Hitting Facility. 2.63 acres at 430 E Arizona Ave. Proposed 4,320 sq ft pole-barn over batting cages. Applicant: Scott Thacker – Stetson University. Case Number: SP26-076. Decision: Not stated. Key Dates: Reviewed June 18, 2026. Project 3: Towns at Summit - Model Townhome Sales Office. 0.38 acres at 1728 Sugarwood Loop. Applicant: Joseph Tucker – D.R. Horton Inc. Case Number: SP26-079. Decision: Not stated. Key Dates: Reviewed June 18, 2026. Project 4: Kingspan Concrete Pad Expansion. 2.5 acres at 725 E Summerhill Ave. Proposed concrete pad expansion. Applicant: Parker Mynchenberg – Parker Mynchenberg & Associates. Case Number: SP26-112. Decision: Not stated. Key Dates: Reviewed June 18, 2026. Project 5: RC Hill Mitsubishi Dealership Expansion. 3.76 acres at 1960 S Woodland Blvd. Proposed dealership expansion. Applicant: Matt Dowst – Mark Dowst & Associates, Inc. Case Number: SP26-111. Decision: Not stated. Key Dates: Reviewed June 18, 2026. Project 6: RC Hill Mitsubishi Dealership Expansion Special Exception. 3.76 acres at 1960 S Woodland Blvd. Proposed special exception for dealership expansion. Applicant: Matt Dowst – Mark Dowst & Associates, Inc. Case Number: SE26-109. Decision: Not stated. Key Dates: Reviewed June 18, 2026.
- Board:
- Technical Review Committee (TRC)
- Date:
- 2026-06-18
- Type:
- Agenda
- Address:
- S Amelia and E Howry Ave; 430 E Arizona Ave; 1728 Sugarwood Loop; 725 E Summerhill Ave; 1960 S Woodland Blvd
- Applicant:
- Michael Wojtuniak – Engineered Permits Inc.; Scott Thacker – Stetson University; Joseph Tucker – D.R. Horton Inc.; Parker Mynchenberg – Parker Mynchenberg & Associates; Matt Dowst – Mark Dowst & Associates, Inc.