May 6, 2026 Board of Adjustment Meeting Agenda Packet
Board of Adjustment · 2026-05-06 · agenda_packet
East Pass Bridge Committee meeting on May 6, 2026, included two agenda items for variances. Item 4.A, PZ-2026-48, involved a request for a variance from the front setback requirement for a new bank building at 35000 Emerald Coast Parkway. The Board of Adjustment approved the variance to allow 23 parking spaces instead of 13. Item 4.B, PZ-2026-57, concerned a request for a variance from the front setback for a residential addition at 21 Pine Ridge Trace. The Board of Adjustment recommended denial of this variance. The Board of Adjustment meeting on February 4, 2026, approved minutes from December 5, 2025, and heard a variance request for 751 Harbor Boulevard (PZ 2026-3), approving 23 parking spaces instead of 13.
Agenda items
- 1. ALL PLANTING IN VISIBILITY TRIANGLE MUST ADHERE TO THE CITY OF DESTIN LDC 8.03.06(A).2. NO PLANTING SHALL BE ALLOWED TO GROW IN SUCH A MANNER AS TO MATERIALLY IMPEDE VISION BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE, MEASURED AT THE CENTERLINE OF THE INTERSECTION, AND NO FOLIAGE BETWEEN 2' AND 10' AT MATURITY.3. PRESERVED OR PROTECTED TREES SHALL BE ALLOWED TO REMAIN IN A CLEAR VISIBILITY TRIANGLE PROVIDED ALL BRANCHES AND FOLIAGE IS REMOVED BETWEEN A HEIGHT OF 2' AND 8.5' ABOVE THE GRADE.
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 1. Letter of Request
- 1. Letter of Request
- 1. Special conditions or circumstances peculiar to the land, structure, or building.
- 2. Conditions not resulting from actions of the applicant.
- 2. Proposed Site Plan
- 2. Proposed Site Plan
- 3. Granting the variance would not confer special privileges.
- Engineering & Architecture
- Real Estate Development
- 3. Proof of Ownership
- 4. AGENDA APPROVAL:
- 4. Abutter Notice
- 4. CURRENT BUSINESS
- 4. CURRENT BUSINESS
- 4. Literal interpretation would deprive the applicant of rights commonly enjoyed by
- 4. Proof of Ownership
- 5. Agent Affidavit
- 5. Property Posting Affidavit
- 5. The variance requested is the minimum necessary.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Building & Industrial Supply
- Engineering & Architecture
- 6. Abutter Notice
- 6. Granting the variance would be in harmony with the general intent and purpose of
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- 6. NEW BUSINESS:
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Commercial & Business Insurance
- Lending & Credit
- Legal Services
- 6. Property Posting Photo
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Property Posting Affidavit
- 8. Property Posting Photo
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Utilities (Sub)
- A. February 4, 2026 Minutes
- A. February 4, 2026 Minutes
- A. Link to Strategic Goals / Objectives: N/A
- A. Link to Strategic Goals / Objectives: N/A
- A. PZ-2026-48 35000 Emerald Coast Parkway Staff Report
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- A. PZ-2026-48 35000 Emerald Coast Parkway Staff Report
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- A. That special conditions or circumstances exist which are peculiar to the land,
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- A. That special conditions or circumstances exist which are peculiar to the land,
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- B. Effect on Budget (EOB): N/A
- B. Effect on Budget (EOB): N/A
- B. PZ-2026-57 21 Pine Ridge Trace Staff Report
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- B. PZ-2026-57 21 Pine Ridge Trace Staff Report
- B. That special conditions and circumstances do not result from the actions of the
- B. That special conditions and circumstances do not result from the actions of the
- C. Level of Service (LOS): N/A
- C. Level of Service (LOS): N/A
- C. That granting the requested variance will not confer on the Applicant any
- C. That granting the requested variance will not confer on the Applicant any
- Cc: Tina Deater, Community Development Director
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- D. Legislative Sponsor:
- D. Legislative Sponsor:
- D. That literal interpretation of the provisions of any zoning ordinance would
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Electrical
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- D. That literal interpretation of the provisions of any zoning ordinance would
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- E. Business Impact Statement:
- E. Business Impact Statement:
- E. The variance granted is the minimum variance that will make possible the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- E. The variance granted is the minimum variance that will make possible the
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- F. That the granting of the variance will be in harmony with the general intent
- F. That the granting of the variance will be in harmony with the general intent
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- I. BACKGROUND:
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- I. BACKGROUND:
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- II. DISCUSSION:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Signage & Printing
- II. DISCUSSION:
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- III. CONCLUSION:
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Waste Management
- Signage & Printing
- III. CONCLUSION:
- Legal Services
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Appraisal & Inspection
- IV. RECOMMENDED MOTION:
- Legal Services
- Engineering & Architecture
- IV. RECOMMENDED MOTION:
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26 feet
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- i. Front setback. For properties that front U.S. Highway 98, 16 feet minimum to 26 feet maximum
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta