o. 321.234.2880
Board of Adjustment · 2026-06-03 · agenda_item
A variance request is under review for a proposed development at 751 Harbor Blvd in Destin, Florida. The applicant, Bohler, LLC, is seeking to deviate from standard building setback requirements along US Hwy 98 and Village Centre Parkway. The proposed setbacks are intended to accommodate bank drive-through lanes while ensuring safe site circulation. This project is currently in the planning stages, with a variance request pending before the Board of Adjustment. If approved, the project would involve site clearing, grading, utility work, paving, and the construction of a new financial institution building. Contractors, suppliers, and service providers interested in this project should reach out early to understand the scope and potentially secure future work as plans develop.
- Setback Required Along US Hwy 98 (min)
- 16 Ft
- Setback Required Along US Hwy 98 (max)
- 26 Ft
- Setback Proposed Along US Hwy 98
- 29.2 Ft
- Setback Required Along Village Centre Parkway (min)
- 10 Ft
- Setback Required Along Village Centre Parkway (max)
- 20 Ft
- Setback Proposed Along Village Centre Parkway
- 70.8 Ft
- Total Acreage of the Property
- 0.918 Acres
- Total Project Area
- 39,962 SF
- Required Parking Spaces
- 13 Spaces
- Total Spaces Provided
- 23 Spaces
Industries that could win this work
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Accounting & Tax
- Real Estate Development
- Landscaping & Lawn Service
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta