Planning Board - July 1, 2026
Planning Board · 2026-07-01 · agenda
[1380-1390 Colonial Blvd; 2400, 2450, 2462, 2476 Edison Ave., 2417, 2423, 2431 Franklin St., 2430, 2480, 2490, 2491 Willard St., 2450 Fowler St., 2455 Royal Palm Ave.; 2531 & 2539 Second Street; 1455 Lockwood Dr.; case PUD25-0041; PUD25-0043; not stated for items 3, 4, and 5] Planning Board agenda for July 1, 2026, with multiple public hearings. Item 1: Amendment to the 1380 Colonial Boulevard PUD at 1380-1390 Colonial Blvd, 14.09 +/- acres, Folio No. 10630095, Strap No. 024524P1330000410, Case Number PUD25-0041, owner Royal Palms Square LLC, agent Cindy Leal-Brizuela of Ensite, Inc. Request to increase acreage from 12.64 to 14.09 acres, increase 1-bedroom units from 160 to 197, increase 2+ bedroom units from 240 to 296, increase commercial space from 250,000 to 288,000 square feet, decrease hotel rooms from 175 to 150, increase parking from 1,437 to 1,616 spaces. Zoning remains PUD, Future Land Use Traditional Community (T/C). Item 2: Request for a PUD to allow expansion of the Salvation Army Center of Hope at 2400, 2450, 2462, 2476 Edison Ave., 2417, 2423, 2431 Franklin St., 2430, 2480, 2490, 2491 Willard St., 2450 Fowler St., 2455 Royal Palm Ave., and Folio No. 10173510, 5.54 +/- acres, Case Number PUD25-0043, owner Salvation Army Inc., agent Eric Francis of RESPEC. Request to change zoning from High Density Multifamily (RM-16), Medium Density Multifamily (RM-12), and Commercial Intensive (CI) to PUD, with 130,000 square feet of mixed-use development including 24 multi-family units, administrative office space, food warehousing and distribution, and congregant living space. Staff recommends approval. Item 3: Continued public hearing for a PUD to allow bonus density at 2531 & 2539 Second Street and Folio No. 10485618, Ward 4. Item 4: Public hearing for a Small-Scale Future Land Use Map Amendment to change 8.1 +/- acres at 1455 Lockwood Dr. from Residential Low Density Residential (RLD) to Residential Medium Density (RMD), Ward 1. Item 5: Public hearing for amendments to Comprehensive Plan Elements 1-6. No decisions are stated in the document; the document is an agenda. Public comment sentiment is not stated in the document. [Various properties with frontage along Edison Ave, Willard Street, and Royal Palm Ave, between Central Ave and Fowler Street; the traffic impact statement states the site is at the southwest corner of Fowler Street and Edison Avenue] The document is an application for a Planned Unit Development (PUD) for the Salvation Army Center of Hope expansion. The property is approximately 5.54 acres (241,170 square feet) and consists of 14 parcels with frontage along Edison Ave, Willard Street, and Royal Palm Ave, between Central Ave and Fowler Street. The applicant and owner is Salvation Army, Inc. The agent is Andrew Fitzgerald, P.E. of RESPEC Company LLC. The request is to rezone from CI, RM-12, and RM-16 to PUD to allow a total development program of 24 multi-family residential units and 130,000 square feet of community service, office, food warehousing, and congregate living facility space. The project is phased: Phase 1 (NE block) Caritas Housing, Renaissance Housing, and Community Connector; Phase 2 (SE block) Food Distribution Center and Emergency Disaster Warehouse; Phase 3 (NW block) Administrative offices and Event Hall; Phase 4 (SW block) Multi-family residential and Senior and Assisted Living Facility. Existing structures total 44,509 square feet; proposed structures total 85,357 square feet. Proposed parking is 149 spaces, 9 handicap spaces, and 3 loading spaces. The document includes a traffic impact statement dated December 19, 2025, and a letter of intent. The document does not state a decision, case number, or key dates for approval. No public comment sentiment is stated in the document. [1455 Lockwood Dr, Fort Myers, FL 33916] The document is a compilation of materials for the Billy Creek Apartments project, a proposed 96-unit multifamily residential development at 1455 Lockwood Dr, Fort Myers, FL 33916. The project involves a request to change the Future Land Use designation from Residential Low Density (RLD) to Residential Medium Density (RMD) and a rezoning from RS-7 (Single Family) to PUD (Planned Unit Development). The applicant is Premiere Development Solutions, LLC. The property is identified by parcel ID 184425P200026.0000. The site is 8.1 acres. The project includes four 3-story buildings, a clubhouse, playground, walking trails, and a non-motorized watercraft dock. The document includes a site plan, variance report, environmental narrative, utility analysis, and a planning board agenda item for a comprehensive plan amendment. The document does not state a final decision on the project. Key dates include a warranty deed recorded on 1/8/2025, an FNAI report created on 5/12/2025, a hydraulic modeling evaluation dated 3/10/2026, and a planning board public hearing scheduled for 7/1/2026. The document also includes a separate agenda item for amendments to the City of Fort Myers Comprehensive Plan, which is not a specific project. The document is a portion of a City of Fort Myers comprehensive plan ordinance (Ordinance No. XXXX) covering transportation, housing, and municipal services elements. It contains no specific development project, site address, parcel, acreage, applicant, or case number. It sets policy goals, objectives, and standards for future city planning, including transportation system management, downtown mobility, housing supply targets, and municipal services standards. No public comment or stakeholder sentiment is stated. The document is procedural and administrative in nature, describing city-wide policies rather than a specific project. This document is a portion of a City of Fort Myers comprehensive plan ordinance, specifically Elements 4, 5, and 6, covering municipal services, conservation and coastal management, and recreation and open space. It contains policies, objectives, and standards for city-wide infrastructure and land use, but does not describe a specific development project, site, or action. No address, parcel, acreage, applicant, or case number for a project is provided. The document is a policy document, not a project application or approval.
Agenda items
- 1) 60 percent of project trips are traveling to and from the project utilizing Colonial Blvd (westbound traffic on
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- 1) 616 Multifamily Dwelling Units
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- 1. Application Information
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Application Information
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. Application Information
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- Landscaping & Lawn Service
- 1. Land Development Code Section 1 38.4 Buffer yard requirements: 15 ft wide
- 1. Land Development Code Section 134.3.5 Minimum number of off-street parking
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 1. PUBLIC HEARING: Consider an amendment to the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. Pedestrian Friendly Connection – The developer will provide
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. The Salvation Army Center of Hope Planned Unit Developmen t is for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- 1. The Salvation Army Center of Hope Planned Unit Development is for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. This Planned Unit Development (PUD), known as the 1380 Colonial
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 10) From the Official Zoning Map:
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- 11) Surrounding Businesses By Name and Description of Use (e.g. Smith’s Auto
- 13) Has a public hearing been held regarding this property in the past five (5) years?
- 14) Units, Square Feet (SF) or Acres proposed for various uses (See Categories
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- 15) For Non-residential Projects:
- 16) For Residential Projects:
- 17) Potable Water, Sanitary Sewer, Surface Water Drainage System, Solid Waste,
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- Utilities (Sub)
- Engineering & Architecture
- 18) For All Projects:
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 19) List all agencies (Federal, State, and Local) from which approval and/or a permit
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- HVAC & Climate Control
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 2) 150 Hotel Rooms
- 2) 20 percent of project trips are traveling to and from the project utilizing McGregor Blvd (McGregor is not im
- 2. All alleys must be vacated prior to issuance of site permits for Phase 1 and
- 2. All alleys must be vacated prior to issuance of site permits for Phase 1 and
- 2. All sidewalks shall meet or exceed City code requirements.
- 2. Community Contribution fees – The developer shall pay a
- Real Estate Development
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 2. Land Development Code Section 118.2 Minimum Street Setback requirement:
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Land Development Code Section 118.8.5.B.4.a. Urban General Zoning District
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- 2. Land Development Code Section 138-3(1) Open Space and indigenous vegetation
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- 2. PUBLIC HEARING: Consider a request for a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. Request
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- 2. Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 20) Describe the use of the property on January 1 of this
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3) 20 percent of project trips are traveling to and from the project utilizing Summerlin Rd (Summerlin is not im
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 3) 288,000 Square Feet of Shopping Center
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3) Agent: Contact person (agent) authorized to receive all communications
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 3. CONTINUED PUBLIC HEARING: Consider a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 3. Comprehensive Plan
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Landscaping & Lawn Service
- 3. Deviations
- 3. Deviations, Terms & Conditions
- 3. Land Development Code Section 118.8.5.B.5.a. Urban General Zoning District
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- 3. Land Development Code Section 134.2.15 Access points/connection
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- 3. Land Development Code Section 138 -4 Buffer yard requirements: a 15 -foot
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 3. The 1380 Colonial Boulevard PUD shall be developed in accordance with
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- 3. The Salvation Army Center of Hope Planned Unit Development shall be
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- 3. The Salvation Army Center of Hope Planned Unit Development shall be
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 4) Developer, if applicable:
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Comprehensive Plan Compliance
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Except where specified in the above deviations, all
- 4. Land Development Code Section 118.8.5.B.1.e. Entrance orientation. Buildings
- 4. Land Development Code Section 134.3.5 Minimum Number of Off -Street
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- 4. Land Development Code Section 138-41(a) When required, parking areas: provide
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Building & Industrial Supply
- 4. PUBLIC HEARING: Consider a request for a Small
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Terms and Conditions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. The Planned Unit Development (PUD) shall be in effect for five (5) years
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. The Planned Unit Development (PUD) shall be in effect for five (5) years
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 5) Property Address and Strap #:
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- 5. Comprehensive Plan Compliance
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Concrete & Masonry
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 5. Land Development Code Section 134.2.15.L. Where existing lot width or
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- 5. Land Development Code Section 138 -41(a) When required, building perimeter
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 5. PUBLIC HEARING: Consider amendments to
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- 5. The applicant shall submit a letter of no objection from the Lee County
- 6. Land Development Code Section 138 -72(e)(2) Street tree requirements: Royal
- Nursery & Horticulture
- Landscaping & Lawn Service
- 6. Public Notice
- 6. Request to deviate from LDC Sec. 134-4 which requires a 15-foot wide Type B
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- 6. The Planned Unit Development (PUD) shall be in effect for fifteen (15) years
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 7. Conditions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Land Development Code Section 134.2.15.B Access point/connection point
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- 7. Recommended Action
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 7. Request to deviate from LDC Sec. 134.2.15.B. which specifies connection
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 8) Specially Regulated Areas within the City: Is your property on or within any of
- 8. Land Development Code Section 134.2.6 Pavement Width: 50-foot-wide curb and
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- 9) From the Future Land Use Map:
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Cc: Terry Cramer <ter r, ((lJwil bursm ith.law>; Craig Bowers <CBowers lt__fortmyers.r ov>
- Cc: Terry Cramer <terr y(T11wil bursmit h.law>; Craig Bowers <CBowers@fortmyers.gov>
- Cc: Terry Cramer <terr y(a)wilbursmith .law>; Craig Bowers <(Bowers •wfortm yers.gov>
- Cc: Terry Cramer <terr ytalwilbursmith.law>
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- I. INTRODUCTION
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- I. Terms and Conditions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- II. EXISTING CONDITIONS
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- II. EXISTING CONDITIONS
- III. TRIP GENERATION
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Real Estate Development
- III. TRIP GENERATION
- IV. TRIP DISTRIBUTION & PROJECT IMPACT
- Engineering & Architecture
- Business Consulting
- IV. TRIP DISTRIBUTION & PROJECT IMPACT
- M. Jones, Jr. and Associates Inc., dated May 14, 2026 on file in the City
- S. of Franklin St. 125064 23,700 26,300 7 2.00% 1,288 1,394 C 25% 11 20 1,405 C 1,413 C
- V. FUTURE TRAFFIC CONDITIONS
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- V. FUTURE TRAFFIC CONDITIONS
- VI. PROJECTED LEVEL OF SERVICE AND IMPROVEMENTS
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- VI. PROJECTED LEVEL OF SERVICE AND IMPROVEMENTS
- VII. CONCLUSION
- General Contractor
- Engineering & Architecture
- Business Consulting
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- VII. CONCLUSION
- a. Deviation: Provide an 8 ft wide modified landscape buffer along Edison
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- a. General Information
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. General Information
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a. In all items requiring a public hearing, including land use matters, disclose in
- a. In all items requiring a public hearing, including land use matters, disclose in
- a. In all items requiring a public hearing, including land use matters, disclose in
- a. This planned unit development is for the construction of a maximum of 18
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- b. Description of Phasing: number of years and project for each phase:
- General Contractor
- Site Prep, Grading & Hardscape
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. Description of Phasing: number of years and project for each phase:
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- b. Deviation: Provide no landscape buffer along Royal Palm Avenue and
- Site Prep, Grading & Hardscape
- b. In all items requiring a public hearing, including land use matters, disclose in
- Legal Services
- Accounting & Tax
- Business Consulting
- Real Estate Development
- General Contractor
- b. In all items requiring a public hearing, including land use matters, disclose in
- Legal Services
- Business Consulting
- b. In all items requiring a public hearing, including land use matters, disclose in
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- b. The Edsel Lofts PUD is subject to the following Smart Code conditions:
- c. Deviation: Provide no landscape buffer between multi -family and
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- c. For residential projects, will any assistance from governmental funding
- c. Parking:
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- c. Support the warrants and deviations as shown on the site plans prepared
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- cc: Alessio Holdings FL, LLC
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- d. Is this an Affordable Housing Project?
- d. Project the number of non -construction full and part time permanent
- e. Will the project be deed restricted? If so, explain and attach a copy of the
Follow this across meetings
Board
Planning BoardApplicants and firms
Locations
- 1380-1390 Colonial Blvd; 2400, 2450, 2462, 2476 Edison Ave., 2417, 2423, 2431 Franklin St., 2430, 2480, 2490, 2491 Willard St., 2450 Fowler St., 2455 Royal Palm Ave.; 2531 & 2539 Second Street; 1455 Lockwood Dr.
- Various properties with frontage along Edison Ave, Willard Street, and Royal Palm Ave, between Central Ave and Fowler Street; the traffic impact statement states the site is at the southwest corner of Fowler Street and Edison Avenue
- 1455 Lockwood Dr, Fort Myers, FL 33916
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis