Planning Board - August 5, 2026
Planning Board · 2026-08-05 · agenda
[1455 Lockwood Drive, Fort Myers, FL 33916; case PUD25-0039] The document is a Planning Board agenda and staff report for a public hearing on August 5, 2026, for a request for a Planned Unit Development (PUD) to allow a 96-unit multi-family development at 1455 Lockwood Drive. The property is 8.12 +/- acres, currently zoned Residential Single-Family (RS-7), with a proposed zoning of Planned Unit Development (PUD). The applicant/owner is Premiere Development Solutions, agent Luis Jurado. Case number is PUD25-0039. The staff recommended action is to recommend approval to the City Council with terms and conditions. The companion future land use amendment was recommended for denial by the Planning Board on July 1, 2026, due to concerns about traffic and drainage. The document also includes a separate item for a continued public hearing on Comprehensive Plan amendments, but no specific project details are provided for that item. The document also includes minutes from a June 3, 2026 meeting, which describe a different project (rezoning 19.79 acres at 1750 Ortiz Avenue from PUD to Light Industrial), but no decision is stated in the provided text for that item. This document is a Planning Board public hearing agenda item for proposed amendments to the City of Fort Myers Comprehensive Plan, covering Elements 1 through 6. It is a policy update, not a specific development project. The amendments include removing outdated language, updating housing projections to 27,000 new units by 2050, incorporating multimodal transportation strategies, adding a potential Mobility Fee program, updating municipal service capacity levels, and incorporating the 2024 Parks and Recreation Master Plan. The staff recommendation is to find the amendments consistent with the Comprehensive Plan and Land Development Code and recommend City Council approval. The document does not describe a specific project, site, or action beyond these procedural and administrative amendments.
Agenda items
- 1) PROJECT NAME:
- 1. 03/20/26
- 1. 03/20/26Wetland • Side (interior) setback: 7ft
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. A pedestrian bridge is proposed across the canal to provide internal pedestrian connectivity.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- Engineering & Architecture
- 1. Application Information
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Floodplain Conditions and Elevation Requirements
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- 1. Nearby Public Parks and Facilities
- Site Prep, Grading & Hardscape
- General Contractor
- Construction (Other)
- 1. PUBLIC HEARING: Consider a request for a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Residential multi-family
- 1. The Billy Creek Apartments Planned Unit Developmen t is for the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The Billy Creek Apartments Planned Unit Development is for the construction
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The utility lines and structures shown on this plan are proposed and/or
- 1. Transform vacant lots in urban areas into productive neighborhood
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- General Contractor
- Building & Industrial Supply
- 10) From the Official Zoning Map:
- 10. If any building within the project cannot be accessed by the Fire Department,
- General Contractor
- Plumbing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 11) Surrounding Businesses By Name and Description of Use (e.g. Smith’s Auto
- 12) Dimensions, Size of Property:
- 13) Has a public hearing been held regarding this property in the past five (5) years?
- 14) Units, Square Feet (SF) or Acres proposed for various uses (See Categories
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 15) For Non-residential Projects:
- 16) For Residential Projects:
- 17) Potable Water, Sanitary Sewer, Surface Water Drainage System, Solid Waste,
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 18) For All Projects:
- 19) List all agencies (Federal, State, and Local) from which approval and/or a permit
- 2) Owner(s): Name, address, and email of all owners of the property. Name and
- 2. 05/15/26
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Utilities (Sub)
- 2. CONTINUED PUBLIC HEARING: Consider
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 2. Clubhouse
- 2. Final alignment, sizing, elevations, and connection points for all utilities shall
- 2. Foster self-sufficiency through the rewards of gardening,
- 2. History
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Plumbing
- Electrical
- HVAC & Climate Control
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 2. Jurisdictional Agencies and Permitting
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 2. On-Site Recreation and Open Space
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. The Billy Creek Apartments Planned Unit Development shall be developed
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. The Billy Creek Apartments Planned Unit Development shall be developed in
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- 2. The pedestrian bridge shall have a minimum clear width in compliance with applicable codes,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Electrical
- Engineering & Architecture
- 20) Describe the use of the property on January 1 of this
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3) Agent: Contact person (agent) authorized to receive all communications
- 3. Conceptual Drainage Strategy
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Engineering & Architecture
- 3. Help families reduce their living costs by growing food locally, and
- 3. Playground
- 3. Request
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. The Billy Creek Apartments Planned Unit Development (PUD) shall be in
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- 3. The Billy Creek Apartments Planned Unit Development (PUD) shall be in effect
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. The bridge surface shall be designed with a maximum running slope of 5% and a maximum
- 3. The location of existing utility infrastructure must be field-verified prior to
- 4) Developer, if applicable:
- 4. Handrails, guardrails, and edge protection will be provided as required by the ADA, Florida
- 4. Improve families access to fresh fruits and vegetables in underserved
- Real Estate Development
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Landscaping & Lawn Service
- 4. It is possible that off-site improvements, such as utility line extensions or
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 4. Regulatory Compliance and Design Criteria
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 4. Walking trail
- 5) Property Address and Strap #:
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 5. Bridge approaches shall align with internal sidewalks and pedestrian circulation routes. Final
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- 5. Detailed Designs
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 5. Deviations
- 5. Non-motorized watercraft dock
- 5. Preliminary utility line diameters are as follows:
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 6. Terms and Conditions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. The number, spacing, and location of fire hydrants shall be determined
- 7) Description of Location of Property; if there are adjacent streets, please list them:
- 7. A minimum 3-foot radius clear area shall be maintained around all fire
- 7. Comprehensive Plan Compliance
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- 8) Specially Regulated Areas within the City: Is your property on or within any of
- 8. Public Notice
- 9) From the Future Land Use Map:
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- 9. Detailed engineering must ensure proper horizontal and vertical separation
- 9. Recommended Action
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Drywall & Insulation
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a) Adjustments to reflect appropriate existing land uses;
- a) Impacts on adjacent uses;
- a) Located in close proximity (ideally 2½ miles or less) to Interstate
- a) Require restoration of biological condition of the river bottom and shoreline;
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Construction (Other)
- Landscaping & Lawn Service
- Building & Industrial Supply
- Real Estate Development
- Business Consulting
- Government Authority
- a) Warehousing, storage, wholesale operations;
- a. Contain at least 15 existing or capable for rehab single-family homes;
- a. General Information
- a. General Information
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a. In areas of conflict, study the areas and give approval to specific sites; or
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- a. Maintaining the character and quality of life of the City.
- a. Streets within a half mile of schools and parks, as measured by walking distance, are
- b) Book and magazine publishing plants;
- b) Changes needed as a result of more accurate information in property boundaries;
- b) Condition of structures;
- b) Rail frontage;
- b. All collector and arterial streets, plus local streets between a half-mile and one mile
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- b. Allow administrative deviations, and warrants and exceptions, as issued by
- b. Description of Phasing: number of years and project for each phase:
- b. Description of Phasing: number of years and project for each phase:
- b. Maximize the enjoyment of the natural and manmade resources for residential and
- b. Parcels already subdivided into lots suitable for single-family use; and,
- c) Economic feasibility of relocating the industries.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- c) Immediate access to or frontage on an arterial roadway;
- c) To reflect suitable/appropriate new development which may have occurred between
- c) Veterinary hospitals, clinics, or kennels; and
- c. All other network streets.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Plumbing
- Lighting & Low-Voltage Systems
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- c. Encouraging orderly and planned development and redevelopment consistent with
- c. For residential projects, will any assistance from governmental funding
- c. Not more than 30% of the lots are developed in other than single-family uses.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- c. Parking:
- c. Where issues cannot be resolved, review variances through the Board of
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Real Estate Development
- Government Authority
- Landscaping & Lawn Service
- d) Radio, telephone and telephone transmission towers and facilities. [The
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- d) Those submitted on the regulating agency’s permit application and adjusted to be
- Legal Services
- Engineering & Architecture
- d) Useable lot sizes-typically 200 feet or deeper;
- d. Is this an Affordable Housing Project?
- d. Maximizing the potential for economic benefit resulting from commercial and
- d. Project the number of non- construction full and part time permanent
- e) Distance from residences, schools, and historic districts or sites;
- e. Will the project be deed restricted? If so, explain and attach a copy of the
- f) Easy access for employees;
- g) Optimum minimum size of 10 acres; and,
- h) Located so as to avoid routing industrial traƯic through residential
- i. BuƯered bike lanes,which provide additional marked buƯer space between
- ii. Cycle tracks, which are exclusive bicycle lanes that are adjacent to but
- iii. Multi-use paths, which are further from the roadway and can be shared with
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
Follow this across meetings
Board
Planning BoardApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis