Agenda (PDF)
Gainesville Regional Utilities Authority · 2026-08-10 · agenda
[GRU Administration Building, 301 SE 4th Avenue, Gainesville, FL 32601 (meeting location); Deerhaven South Bulk Tank (project location, no street address stated); case 2026-544 (minutes approval), 2026-541 (State of the Utility), 2026-548 (Ongoing Business), 2026-536 (bond resolution)] The document is the agenda and supporting materials for the Gainesville Regional Utilities Authority (GRUA) meeting on August 10, 2026. It contains no specific development project with a street address, parcel, acreage, or zoning change. The items are administrative, financial, and operational updates for the utility. The only actionable item for contractors is the decommissioning of the Deerhaven South Bulk Tank, which requires a contractor to empty approximately 130,000 gallons of No. 6 fuel oil. The document also includes a resolution to issue up to $300,000,000 in bonds for utility capital projects, but no specific project locations are given. Public comment sentiment is noted in the minutes from the July 1, 2026 meeting, including comments from Jim Konish, Chuck Ross, Debbie Martinez, and Bob Chewning, but no specific project-related concerns are detailed in the provided text. [case Resolution No. 2026-128, Resolution No. 2026-129, and this Resolution (Supplemental Utilities System Revenue Bond Resolution)] This document is a municipal bond resolution, not a construction project. It authorizes the issuance of up to $300,000,000 in Utilities System Revenue Bonds (2026 Series A and B) by the City of Gainesville, Florida, for the purpose of paying costs of the 'Series 2026 Project' and refunding certain existing bonds (2009 Series B, 2014 Series A, and 2014 Series B). The document does not describe any physical construction site, address, parcel, or zoning change. It is a financial authorization for bond issuance and debt refunding, with no public comment or stakeholder sentiment stated. This document is an official statement for the issuance of 2026 Bonds by the City of Gainesville for its utility system (GRU). It describes the 2026 Project, a capital improvement program for the electric, water, wastewater, and natural gas systems, and a refunding plan for outstanding bonds. The document does not describe a single land development project with a street address, parcel, or zoning change. It is a financing document for utility infrastructure improvements. The 2026 Project includes specific improvements such as Deerhaven 1 retirement deferment, substation transformer replacements, Murphree water treatment projects, Main Street wastewater capacity upgrade, and various natural gas main extensions. The document also details the governance of the new GRU Authority, the City's demographics, and a state audit of GRU. No public comment or stakeholder sentiment is recorded. The business opportunity for contractors is in bidding on the various utility construction and equipment projects listed under the 2026 Project, funded by the bond proceeds. The document is an official statement for the issuance of Series 2026 Bonds by Gainesville Regional Utilities (GRU). It describes the utility's operations, rates, and financial condition, including a manufactured gas plant (MGP) remediation site, capital improvement programs, and GRUCom fiber optic services. No specific development project, zoning change, or land use application is described. The document does not contain a public hearing or public comment section. The MGP site is described as a former manufactured gas plant that has been remediated and redeveloped by the City as a park with storm water ponds, nature trails, and recreational space. The document states the site is in a groundwater monitoring phase. The exact address, parcel/folio, and acreage of the MGP site are not stated. The document provides capital improvement program totals for natural gas ($19,210,269 for fiscal years 2026-2030) and GRUCom ($3,399,284 for fiscal years 2026-2030). It also lists current utility rates and connection charges, including water and wastewater connection charges for a typical single-family dwelling totaling $5,702. The document states that House Bill 1451, passed during the 2026 Legislative Session, removes provisions allowing a municipal water or sewer utility to add a surcharge of up to 25% for customers outside municipal boundaries, and GRU estimates a reduction in Gross Revenues by approximately $7.0 million per year over the next 4 years, growing to $7.8 million in 2031, absent offsetting rate increases.
Agenda items
- 2026-536 Authorization of 2026 Utilities Revenue Bonds, Refunding Prior Series, and Approval of POS & Financing Terms (B)
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 2026-541 State of the Utility – June 2026 (B)
- 2026-542 GRU June 30, 2026 – 2026 Proforma Financial Analysis
- 2026-543 GRU Review – July 2026 (B)
- 2026-544 Gainesville Regional Utilities approve the minutes from the July 1, 2026 meeting (B)
- 2026-548 Ongoing Business
- CEO COMMENTS
- RESOLUTIONS (Roll Call Required)
Follow this across meetings
Applicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis