BOA 260616 Agenda Packet
Board of Adjustment · 2026-06-16 · agenda_packet
[123 S 30th Ave Lot 3 and 123 S 30th Ave Lot 4; case BOA#26-100034 and BOA#26-100035] Two new single-family homes are proposed on two adjacent, historically platted lots at 123 S 30th Ave. The lots are substandard in width and area. Variances are requested for reduced front yard (20 ft vs 25 ft), side yard (5 ft vs 10 ft), rear yard (25 ft vs 30 ft), and increased lot coverage (39% vs 35%) to allow construction. This is a successive application following a previous denial on March 17, 2026, with reduced variance requests. Staff recommends approval, finding the requests minor, proportional, and necessary for reasonable use of the nonconforming lots. [1526 N 7th St; case BOA#26-100036] An addition to an existing nonconforming accessory structure is proposed at 1526 N 7th St. A variance is requested for a rear accessory structure setback of 13 inches in lieu of 5 feet. The property complies with RS-1 zoning dimensional standards but has an irregular configuration limiting rear yard space. The existing accessory structure (pergola) predates current ownership and is nonconforming. [816 N 15th Ave; case BOA#26-100037] An addition to an existing nonconforming structure is proposed at 816 N 15th Ave. A variance is requested for an accessory structure setback of 3 feet in lieu of 5 feet on the eastern portion of the property. The property is zoned RS-1. [610 S 6th Ave and 592 S 6th Ave; case BOA#26-100031 and BOA#26-100032] Two previous applications (BOA#26-100031 and BOA#26-100032) by Jacksonville Homes, LLC for 610 S 6th Ave and 592 S 6th Ave, respectively, were denied on June 2, 2026. The requests involved variances for accessory structure setback (0 ft vs 5 ft) and maximum lot coverage (47% vs 35%) to allow an unpermitted wood deck at existing single-family homes. The hardship cited was a nonconforming lot. The motion to approve BOA#26-100031 failed unanimously. A motion to amend BOA#26-100032 to only approve the accessory structure setback was also made and failed unanimously. No public comment was provided for these items.
Agenda items
- 1. 26-100034pics
- 1. 26-100035pics
- 1. 26-100036pics
- 1. 26-100037pics
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Landscaping & Lawn Service
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- Engineering & Architecture
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. BOA#26-100034 Application
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. BOA#26-100035 Application
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. BOA#26-100036 Application
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 2. BOA#26-100037 Application
- 2. The conditions or circumstances do not result from actions of the application and would
- 2. The conditions or circumstances do not result from actions of the application and would
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. The conditions or circumstances do not result from actions of the application and would
- 2. The conditions or circumstances do not result from actions of the application and would
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Roofing
- Painting & Flooring
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- Real Estate Development
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Construction (Other)
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- A. Board of Adjustment Meeting held on June 2, 2026
- A. Board of Adjustment Meeting held on June 2, 2026
- A. Case Number(s): BOA#26-100034
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- A. Case Number(s): BOA#26-100034
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. Case Number: BOA#26-100031
- Real Estate Development
- B. Case Number(s): BOA#26-100035
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- B. Case Number(s): BOA#26-100035
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- B. Case Number: BOA#26-100032
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- C. Case Number(s): BOA#26-100036
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- C. Case Number(s): BOA#26-100036
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- D. Case Number(s): BOA#26-100037
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- D. Case Number(s): BOA#26-100037
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- cc: City Manager; City Attorney
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta