BOA 260616 Signed Minutes
Board of Adjustment · 2026-06-16 · minutes
[123 S 30th Ave Lot 3, 123 S 30th Ave Lot 4, 1526 N 7th St, 816 N 15th Ave; case BOA#26-100034, BOA#26-100035, BOA#26-100036, BOA#27-100037] Board of Adjustment approved variances for the construction of new single-family homes on substandard lots. The variances allow for reduced front, side, and rear yard setbacks, and increased lot coverage. Case BOA#26-100034 at 123 S 30th Ave Lot 3 was approved with a condition that the variance applies only to the initial structure built within the specified footprint. Case BOA#26-100035 at 123 S 30th Ave Lot 4 was approved with a condition that a new variance would be needed if the initial structure is removed or modified. Case BOA#26-100036 at 1526 N 7th St was approved for a rear accessory structure setback. Case BOA#27-100037 at 816 N 15th Ave was approved for an accessory structure setback.
Agenda items
- 1. 26-100034pics
- 1. 26-100035pics
- 1. 26-100036pics
- 1. 26-100037pics
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Landscaping & Lawn Service
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- Engineering & Architecture
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. BOA#26-100034 Application
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. BOA#26-100035 Application
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. BOA#26-100036 Application
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 2. BOA#26-100037 Application
- 2. The conditions or circumstances do not result from actions of the application and would
- 2. The conditions or circumstances do not result from actions of the application and would
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. The conditions or circumstances do not result from actions of the application and would
- 2. The conditions or circumstances do not result from actions of the application and would
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Roofing
- Painting & Flooring
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- Real Estate Development
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Construction (Other)
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- A. Board of Adjustment Meeting held on June 2, 2026
- A. Board of Adjustment Meeting held on June 2, 2026
- A. Case Number(s): BOA#26-100034
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- A. Case Number(s): BOA#26-100034
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. Case Number: BOA#26-100031
- Real Estate Development
- B. Case Number(s): BOA#26-100035
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- B. Case Number(s): BOA#26-100035
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- B. Case Number: BOA#26-100032
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Appraisal & Inspection
- C. Case Number(s): BOA#26-100036
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- C. Case Number(s): BOA#26-100036
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- D. Case Number(s): BOA#26-100037
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- D. Case Number(s): BOA#26-100037
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- cc: City Manager; City Attorney
Follow this across meetings
Board
Board of AdjustmentApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta