BOA June 2 2026
Board of Adjustment · 2026-06-02 · agenda
[610 S 6th Ave and 592 S 6th Ave; case BOA#26-100031 and BOA#26-100032] Two separate but identical requests for variances for accessory structure setback and lot coverage at two single-family homes. Both are for Jacksonville Homes, LLC, represented by Dakota Briggs, seeking to allow an unpermitted wood deck. The variances requested are for an accessory structure setback of 0 feet in lieu of 5 feet, and maximum lot coverage of 47% in lieu of 35%. The document does not state the decision on these items.
Agenda items
- 1. 26-100031pics
- 1. 26-100032pics
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- 1. There are conditions or circumstances that exist which prevent compliance with site design
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Appraisal & Inspection
- Legal Services
- 2. BOA#26-100031 Application
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- General Contractor
- 2. BOA#26-100032 Application
- 2. The conditions or circumstances do not result from actions of the application and would
- 2. The conditions or circumstances do not result from actions of the application and would
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 3. There would be no special privileges afforded to the applicant by granting a variance that
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- 4. Strict interpretation and enforcement of the code would deprive the applicant of rights
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 5. The variance(s) requested, if granted, will make possible a reasonable use of the parcel of
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- 6. The variance(s) request, if granted, will not result in the creation of a public nuisance.
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Pool & Spa Construction
- Engineering & Architecture
- Real Estate Development
- A. Board of Adjustment meeting held on May 19, 2026
- A. Board of Adjustment meeting held on May 19, 2026
- A. Case Number(s): BOA#26-100031
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Site Prep, Grading & Hardscape
- A. Case Number(s): BOA#26-100031
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- A. Case Number: BOA#26-100029
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- B. Case Number(s): BOA#26-100032
- Concrete & Masonry
- Carpentry & Cabinetry
- General Contractor
- Painting & Flooring
- Real Estate Development
- Engineering & Architecture
- B. Case Number(s): BOA#26-100032
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- B. Case Number: BOA#26-100030
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- cc: City Manager; City Attorney
Follow this across meetings
Board
Board of AdjustmentApplicants and firms