The City of Jacksonville Beach is moving forward with plans to construct New Well #16 and a 12-inch raw water main extension. This project is currently in the bidding phase, with bids having been received on April 22, 2026. The work involves drilling a new well to a depth of 900 feet, installing casing and pumps, and extending a 12-inch raw water pipeline. The project also includes site preparation, grading, concrete work for a parking area and slabs, fencing, and landscaping. Following the bid tabulation, the city will select a contractor to begin construction, which is expected to take approximately 245 days. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project. Businesses specializing in underground utilities, well drilling, concrete, paving, electrical, mechanical, and landscaping services should consider reaching out to the City of Jacksonville Beach Public Works Department or the project manager, Four Waters Engineering, Inc., to learn more about potential subcontracting or supply opportunities before final contracts are awarded.

New Well #16 (Part A) and 12" Raw Water Main Extension (Part B)
2526-03 City No
Bid Date
22 April
Bid Time
2:00 P.M.
G&H Underground Construction, Inc. Part A Base Bid
369,602.17 $
G&H Underground Construction, Inc. Part B Base Bid
212,527.50 $
G&H Underground Construction, Inc. Total Base Bid
582,129.67 $
MAER Construction Part A Base Bid
246,044.00 $
MAER Construction Part B Base Bid
208,385.00 $
MAER Construction Total Base Bid
454,429.00 $
Petticoat-Schmittt Civil Contractors Part A Base Bid
1,397,712.00 $
Petticoat-Schmittt Civil Contractors Part B Alternate 1
421,190.00 $
Petticoat-Schmittt Civil Contractors Part B Alternate 2
76,400.00 $
Petticoat-Schmittt Civil Contractors Total Base Bid
1,895,302.00 $
Petticoat-Schmittt Civil Contractors Total Alternate 1
476,863.00 $
Petticoat-Schmittt Civil Contractors Total Alternate 2
267,868.00 $
Sawcross, Inc Part A Base Bid
1,595,865.00 $
Sawcross, Inc Part B Alternate 1
372,650.00 $
Sawcross, Inc Part B Alternate 2
48,618.50 $
Sawcross, Inc Total Base Bid
2,017,133.50 $
T.G. Utility Company Part A Base Bid
1,133,551.50 $
T.G. Utility Company Part B Alternate 1
284,283.85 $
T.G. Utility Company Part B Alternate 2
64,217.00 $
T.G. Utility Company Total Base Bid
1,482,052.35 $
T.G. Utility Company Total Alternate 1
233,123.40 $
T.G. Utility Company Total Alternate 2
200,421.90 $
T.G. Utility Company Total Alternate 3
433,545.30 $
United Brothers Development Part A Base Bid
229,985.35 $
United Brothers Development Part B Base Bid
300,351.80 $
United Brothers Development Total Base Bid
530,337.15 $
Well #16 Construction depth
900 feet BLS
Outer casing depth
160 feet BLS
Inner casing depth
900 feet BLS
Concrete Parking Area / Driveway
156 SY
Misc Concrete Slabs
47 SY
Filter Cloth and #57 Stone
151 SY
Sod
1150 SY
Generator, Fuel Tank and ATS
150 KW
Fuel Tank capacity
500 Gallon
Generator, Fuel Tank and ATS Concrete Slab
21 SY
12" PVC (DR18) Raw Water Main length
739 LF
Roadway Restoration Area
425 SY
Mill and Resurface Area
821 SY
6" PVC (DR18) Water Main length
641 LF
Roadway Restoration Area
144 SY
Remove and Restore Concrete Driveway Area
30 SY
Removed and Restore Paver Driveway Area
20 SY
Construction period
245 day
Four Waters Engineering, Inc. Not to exceed amount
93,203.15 $

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • Plumbing
  • Construction (Other)
  • Utilities (Sub)
  • Building & Industrial Supply
  • Engineering & Architecture

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta