Jacksonville Waterways Commission: mayo de 2026
City of Jacksonville
April 15, 2026, JWC Meeting Minutes
This item concerns the approval of minutes from a previous meeting of the Jacksonville Waterways Commission. The minutes themselves do not describe a specific construction project, development, or service contract. Therefore, no direct construction work or related services are indicated by this agenda item. The item is currently pending approval. Because this item is purely administrative, it does not present an opportunity for contractors, trades, suppliers, or service providers at this time.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Attendance
This item concerns the Jacksonville Waterways Commission and the City of Jacksonville, Duval. The agenda item is currently pending. No specific project details, such as a proposed development or construction, are mentioned in the provided text. Therefore, the scope of work and potential phases are not yet defined. Local contractors, trades, suppliers, and service providers should monitor future agendas from the Jacksonville Waterways Commission for potential project announcements. Early awareness of upcoming initiatives will provide an advantage when formal plans and opportunities are released.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Brian Burket, Parks Department, discussed emails from Mr. Retterbush regarding the St. Johns Marina Ramp, in which Mr. Retterbush had raised concerns about safety and the possibility of extending the ramp. Mr. Burket informed the Commission that the St. Johns Marina Ramp is on the Southbank and was built in 1965 as a 42-foot ramp. He stated that, because the ramp sits on the inside bend of the river, sediment collects in the area. He stated that the St. Johns Marina Ramp is the only ramp in the downtown area, with the next closest ramp located in Arlington. Mr. Burket stated that the ramp had been extended from 42 feet to 54 feet in 2005, but that, because of the sediment buildup, the end of the boat ramp is regularly buried in sediment. Mr. Burket stated that they did clean it out and had performed dredges over the years, but that it had been a number of years since the last dredging.
The St. Johns Marina Ramp, located on the Southbank and built in 1965, is proposed for dredging to address sediment buildup that regularly buries the boat ramp. The ramp was previously extended from 42 feet to 54 feet in 2005. A FIND grant was received in 2017 to consider dredging and ramp lengthening, but this was paused due to an aging adjacent bulkhead. The bulkhead has since been replaced, and a new FIND grant is expected for designing spot dredging sites. The project is now in the construction phase, with dredging anticipated by summer 2027. While a preliminary concept for a 12-foot ramp extension exists, funding is not currently available, and the dredging scope cannot include it. The project will involve dredging and potentially site preparation around the ramp area. Contractors specializing in marine construction, dredging, and site preparation could find opportunities as the project moves through its design and construction phases. Early engagement is advised before final bids and permits are issued.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- St. Johns Marina Ramp
CM Gay stated that he is continuing work with Captain Suber on the Shad Creek Resolution and compiling all the information needed for FWC.
The Jacksonville Waterways Commission is reviewing a proposed resolution concerning Shad Creek. This item is currently pending further information gathering for the Florida Fish and Wildlife Conservation Commission (FWC). The work involves compiling necessary data related to the creek. This early stage means that contractors, suppliers, and service providers can engage with the process as plans develop. Businesses involved in environmental consulting, data collection, or related services may find opportunities as the resolution moves forward. Reaching out now allows for early input before specific project details and bidding processes are finalized.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
CM Gay stated that the state representatives had returned to session and had been unable to meet with them in May as planned, and that a future meeting regarding the George Crady Bridge would be scheduled.
A future meeting is planned to discuss the George Crady Bridge. The Jacksonville Waterways Commission and City of Jacksonville are involved in this discussion. The status of this item is pending, meaning it is under review and has not yet been decided. This project is in its early stages, with discussions and planning yet to occur. The scope of work will likely involve preliminary studies, design, and potentially construction or renovation related to the bridge. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item as it progresses. Engaging early, before final plans and permits are set, offers the best opportunity to compete for future work.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
CM Peluso announced two ribbon-cutting ceremonies scheduled for 11:00 a.m. that day: one at the Riverfront Music Garden, and one at the bridge in front of the Brooklyn section of the Riverwalk.
This item concerns two upcoming ribbon-cutting ceremonies planned for May 13, 2026. One ceremony will be held at the Riverfront Music Garden, and the other will take place at the bridge located in front of the Brooklyn section of the Riverwalk. These events are currently pending. While no construction is described, the ceremonies themselves may involve event planning, setup, and related services. Local businesses in event services, signage, and potentially catering or entertainment could find opportunities related to these public events. Early engagement with the organizing bodies could provide insight into specific needs as the dates approach.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- Riverfront Music Garden
COUNCIL RULE 4.505 DISRUPTION OF MEETING
This public notice concerns a rule change being reviewed by the Jacksonville Waterways Commission. The proposed rule, Council Rule 4.505, outlines actions that can be taken against individuals who disrupt public meetings. These actions include being barred or removed from a meeting, or even facing arrest if refusing to leave. The rule details specific disruptive behaviors such as political campaigning, excessive noise, displaying signs, using electronic devices audibly, consuming alcohol, making offensive remarks, refusing to stop speaking, or returning after removal. This item is currently pending review. The potential work generated by this item is limited to legal and administrative services related to the rule's development and potential enforcement. Local contractors, trades, suppliers, and service providers should note that this item does not involve physical construction or direct procurement of materials or services for a building project. Early engagement with the relevant city departments might be beneficial for understanding any administrative or support needs that arise from the rule's finalization.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Chair Amaro gave the following announcements:
This notice is about upcoming events related to waterway activities and safety in Jacksonville. The St. Johns River Taxi will host a waterway tour on May 14th, 2026, departing from the Hyatt Regency Jacksonville Dock at 225 E. Coastline Dr. A FIND Board Meeting is scheduled for May 15th, 2026, at the Hyatt Regency Jacksonville, with committee meetings starting at 8:15 AM and the regular board meeting at 9 AM. A Safe Boating Week & Manatee Awareness Press Conference will take place on May 18th, 2026, at 10:00 AM at the St. Johns Boat Ramp, 901 Museum Circle. Additionally, a safety zone will be in effect on the St. Johns River on May 16th, 2026, from 7:00 AM to 11:00 AM for the IRONMAN Jacksonville Marine Event. These events are currently pending and represent early opportunities for businesses involved in marine services, event support, and safety awareness. Contractors, suppliers, and service providers in these areas are encouraged to reach out to learn more about potential involvement as details are finalized.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- 225 E. Coastline Dr., Jacksonville, FL 32202
- Applicant:
- FIND
Discussion on email re: St. Johns Marina Ramp Extension & Public Access
The Jacksonville Waterways Commission is reviewing a proposal for the St. Johns Marina Ramp Extension & Public Access. This item is currently pending discussion. The project involves extending the marina ramp and improving public access at the St. Johns Marina. This early stage means potential opportunities for contractors and suppliers. Work could eventually involve site preparation, construction of the ramp extension, and improvements to public access areas. Businesses involved in marine construction, site work, concrete, and general contracting may find opportunities. Reaching out now, before plans are finalized, allows for early engagement in the project's development.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- St. Johns Marina
Dr. Gerard Pinto, Jacksonville University, reported that the City remained in a drought and that the St. Johns River Water Management District had declared a water shortage. Dr. Pinto reported that salinity was elevated across all areas as a result of the drought. He stated that recent rainfall over the past few days had not reduced salinity levels but had cooled water temperatures by approximately one degree to 77°F. Dr. Pinto reported that year-to-date rainfall was five inches below normal, though the area had received a couple of inches of rain in recent days. He reported that algal bloom conditions from Jacksonville south to Lake George showed mixed algae with no toxins.
This civic agenda item concerns ongoing discussions about drought conditions and their impact on local waterways, specifically the St. Johns River. Elevated salinity levels and below-normal rainfall have been reported, with recent rain only slightly cooling water temperatures. The item also addresses manatee safety, particularly at the Queens Harbor lock, where two deaths have recently occurred despite existing safety sensors and protocols. The Jacksonville Waterways Commission is reviewing the situation, including potential improvements to lock operations and monitoring. This review could lead to future discussions and potential actions related to waterway management and wildlife protection. Local contractors, suppliers, and service providers in areas such as environmental consulting, engineering, and potentially construction or maintenance related to water infrastructure may find opportunities as these discussions progress. Early engagement could provide insight into future needs and projects.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- Queens Harbor lock
- Applicant:
- Jacksonville University
George Crady Bridge Update
The Jacksonville Waterways Commission is reviewing an update regarding the George Crady Bridge. This item is currently pending further discussion. While no specific project details like size, location, or proposed use are available at this time, updates on bridges often involve planning for maintenance, repairs, or potential upgrades. Such work could eventually lead to opportunities in site preparation, concrete and masonry, general contracting, and specialized trades like electrical or plumbing, as well as material supply. Contractors, suppliers, and service providers are encouraged to monitor the progress of this item as it moves through the review process. Early engagement can provide a competitive advantage as project specifics become clearer.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Jacksonville Waterways Commission
The Jacksonville Waterways Commission met to discuss various waterway matters. Several potential local business opportunities were reviewed. These include dredging and possible ramp extensions at the St. Johns Marina Ramp, a new artificial reef project at Harm's Ledge, and the construction of new commercial and mixed-use buildings at various locations. Other potential work involves a new public park and a new public boat ramp along the St. Johns River.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Meeting
Legislation
The Jacksonville Waterways Commission is considering new legislation that could impact local waterways. This item is currently pending review. The scope of work this legislation might set in motion is not yet detailed, but potential phases could involve site preparation, construction, and ongoing maintenance related to waterway improvements or regulations. Local contractors, trades, suppliers, and service providers are encouraged to monitor this pending legislation. Engaging early, before specific plans or permits are finalized, offers an advantage in understanding and competing for future opportunities.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Minutes: Steven Libby, Council Research
This item concerns a potential project related to Jacksonville waterways. The Jacksonville Waterways Commission is reviewing an unspecified agenda item. This review is currently pending, meaning it is in the early stages of the public process. The scope of work is not detailed, but projects involving waterways often include site preparation, grading, utility work, and potentially construction or maintenance. Businesses involved in marine services, civil engineering, and environmental consulting may find opportunities as this project moves forward. Early engagement is advised before formal plans and permits are established.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Mr. Carnell Oliver spoke on the City's consolidated structure and its institutions.
This item concerns a planned watershed study for Hogpen Creek. The study is being considered by the City of Jacksonville and the Jacksonville Waterways Commission. The status of this item is pending, meaning it is under review and not yet approved. The scope of work for this project would involve detailed environmental assessments, data collection, and analysis to understand the watershed's health. This could lead to future phases of planning and potential infrastructure improvements. Local contractors, suppliers, and service providers in fields such as environmental consulting, engineering, surveying, and potentially construction could find opportunities. Engaging early, before plans and permits are finalized, offers the best chance to compete for future work related to this study.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Mr. Hardesty announced that a contractor had been secured for an artificial reef project in the Harm's Ledge area, projected to be completed in August. He stated that the project is a 500-ton rubble reef and would be the first artificial reef in the City in twenty years.
An artificial reef project is planned for the Harm's Ledge area. This project involves placing 500 tons of rubble to create the first artificial reef in the City in twenty years. The project is currently pending and is projected for completion in August. This initiative will likely involve site preparation, material procurement and delivery, and specialized marine construction services. Local contractors, suppliers, and service providers in marine construction, material supply, and related fields may find opportunities as this project moves forward. Early engagement could be beneficial before final plans and permits are established.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- Harm's Ledge area
Ms. MacGillis informed the Commission that 2026-0349 had been on the Consent Agenda and was approved unanimously at the previous day's City Council meeting. She stated that, since the resolution had been approved by City Council, 2026-0349 was on the JWC agenda for informational purposes only.
This item concerns a resolution, number 2026-0349, that has already been approved by the City Council. The Jacksonville Waterways Commission is reviewing this item for informational purposes only. No new construction or development is indicated by this agenda item. Therefore, there is no direct scope of work for contractors, trades, suppliers, or service providers at this time. Businesses interested in future opportunities should monitor future agenda items from the City of Jacksonville and the Jacksonville Waterways Commission.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Decision:
- City Council
ORD Auth the Mayor & Corp Sec to Execute a 2nd Amendment to the Agrmt with JU to Renew the Agrmt for a 2nd Add’l YR for the Continuing Manatee Protection Studies for FY 24-25 & FY 25-26, & to Increase the Max Indebtedness by an Add’l $193,549 for a New Total Max Indebtedness Not to Exceed $283,549, Pursuant to Approp Funds Previously Auth by Ords 2024 504-E & 2025 504-E; Prov for Oversight by the Planning & Dev Dept (Dillard) (Req of Mayor) (JWC Apv)
The City of Jacksonville is considering a renewal and amendment to an existing agreement with JU for ongoing Manatee Protection Studies. This renewal would extend the agreement for an additional year, covering Fiscal Years 24-25 and 25-26. The maximum amount of funding for this project is proposed to increase by an additional $193,549, bringing the total maximum funding to $283,549. This item is currently under review and has been introduced and advanced through initial readings and approvals by various city bodies. The work involves continued research and study related to manatee protection, overseen by the Planning & Development Department. This early stage presents an opportunity for contractors, suppliers, and service providers in fields such as research support, data analysis, and potentially environmental consulting to engage with the city before final bids and permits are established.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Other New Business
This item concerns a planned project that is currently under review by the Jacksonville Waterways Commission. The project involves the potential development of a new mixed-use area. The specific details regarding the proposed use, size, and location are still being determined as the item is in the early stages of the public process. If approved, this project could lead to significant site preparation, including clearing and grading, followed by underground utility work, road construction, and the erection of new structures. Subsequent phases would likely involve interior and exterior finishing trades, as well as landscaping. Local contractors, suppliers, and service providers are encouraged to monitor this developing opportunity. Engaging early, before final site plans, bids, and permits are issued, can provide a competitive advantage for securing future work related to this project.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Police Lieutenant Kevin Kilcoin, Jacksonville Sheriff's Office Marine Unit, presented an overview of the unit. Lt. Kilcoin stated that the Marine Unit is responsible for ensuring safety, enforcing state and local boating laws, answering emergency calls, and providing services including routine patrols, port security, search and rescue, and coordination with state and federal law enforcement partners on the waterways. Lt. Kilcoin reviewed the Marine Unit's personnel structure, functions, and facility location.
The Jacksonville Waterways Commission and the Jacksonville Sheriff's Office Marine Unit are reviewing operations and safety on local waterways. The Marine Unit is responsible for safety, law enforcement, and emergency response, handling about 1,000 calls annually. This review includes discussions on boater education, safety regulations, and potential improvements like marking jetties and monitoring specific areas such as Shad Creek. The unit also deals with port security, hazardous object removal, and search and rescue operations. This item is currently under review, indicating an early stage in the public process. The discussions could lead to future needs for site preparation, utility work, construction of new facilities or improvements, and ongoing maintenance. Contractors, suppliers, and service providers in marine construction, safety equipment, and related fields should consider reaching out to learn more about potential future needs as plans develop.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- Dames Point Bridge
Presentation: Jacksonville Sheriff's Office | Intelligence Unit | Hazardous Device Unit | Marine Unit
This item involves a presentation to the Jacksonville Waterways Commission by the Jacksonville Sheriff's Office. The presentation will cover the Intelligence Unit, Hazardous Device Unit, and Marine Unit. This is a planned informational session and is currently pending. No construction or development is described in this item. Therefore, there are no direct contracting opportunities for local businesses at this time. Local contractors, trades, suppliers, and service providers should monitor future agendas for potential projects that may arise from discussions or initiatives presented.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Pursuant to the American with Disabilities Act, accommodations for persons with disabilities are available upon request. Please allow 1-2 business days notification to process; last minute requests will be accepted; but may not be possible to fulfill. Please contact Disabled Services Division at: V 904-255-5466, TTY-904-255-5476, or email your request to KaraT@coj.net.
This item concerns a planned civic agenda item for the Jacksonville Waterways Commission, City of Jacksonville, Duval. The status is pending, meaning it is under review. No specific project details such as construction, development, or land use changes are mentioned in this item. The agenda item is related to accommodations for persons with disabilities, with contact information provided for requests. This early stage means that businesses interested in future civic projects or services related to accessibility compliance should monitor upcoming agendas and commission meetings. While no direct work is outlined, understanding the commission's focus can inform businesses about potential future needs.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
RESO Declaring the Week of May 16-22, 2026, as National Safe Boating Week in Jax & Encouraging All Residents & Visitors to Practice Safe Boating Habits (Libby) (Introduced by CMs Howland, J. Carlucci, Salem, Peluso, Lahnen, Gay, Amaro, Arias, Johnson, Miller & Freeman) (Co-Sponsor CM Pittman)
This item concerns a resolution to declare the week of May 16-22, 2026, as National Safe Boating Week in Jacksonville. The resolution encourages residents and visitors to practice safe boating habits. This is a planned event, currently under review. The scope of work involves public awareness and education campaigns related to safe boating practices. This will likely involve outreach and promotional activities. Local businesses involved in marine services, safety equipment supply, and event promotion could find opportunities. Early engagement before final plans are set may offer advantages.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Safe Boating Week & Manatee Awareness Press Conference - Monday, May 18th, 2026, at 10:00 AM, at the St. Johns Boat Ramp, 901 Museum Circle on the River Walk west of the ramp.
The City of Jacksonville is planning a Safe Boating Week & Manatee Awareness Press Conference. This event is scheduled for Monday, May 18th, 2026, at 10:00 AM. The press conference will take place at the St. Johns Boat Ramp, located at 901 Museum Circle on the River Walk west of the ramp. This event is currently pending. The scope of work involves event planning and public relations services. This includes coordinating a press conference, which may involve setting up a temporary stage or podium, sound systems, and providing informational materials. Local businesses specializing in event management, public relations, signage, and potentially audiovisual services could find opportunities. Early engagement before final plans are set allows businesses to offer their services and expertise.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- 901 Museum Circle on the River Walk west of the ramp
Shad Creek Resolution - Update
The Jacksonville Waterways Commission is considering a resolution related to Shad Creek. This item is currently pending review. While specific details about the resolution's content or the project it might initiate are not yet available, such actions often lead to work involving site preparation, utility upgrades, or infrastructure improvements in the Shad Creek area. Local contractors, suppliers, and service providers should monitor this pending item. Engaging with the commission or relevant city departments early could provide an advantage as plans develop, allowing businesses to prepare bids and secure work once the resolution is finalized and project details are released.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- Shad Creek
Shannon MacGillis, OGC, reminded the Commission that she had stated at the previous meeting that action by the Commission on 2026-0332 was not required. She stated that the Council President had since formally assigned 2026-0332 to the JWC, giving the Commission grounds to act on it.
The Jacksonville Waterways Commission has approved item 2026-0332. This item involves a review of grant opportunities related to manatees. The project is currently in the planning and review phase. The scope of work will involve research into potential funding sources and grant applications. This could lead to future projects focused on manatee protection or habitat improvement. Local contractors, suppliers, and service providers should reach out early to understand the project's direction and potential needs as it moves forward in the planning process.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
St. Johns River Closure Notice
The United States Coast Guard Sector Jacksonville is planning a safety zone for the water portion of the IRONMAN Jacksonville Marine Event. This event is scheduled for May 16, 2026, from 7:00 AM to 11:00 AM. The Jacksonville Waterways Commission and the City of Jacksonville are involved in this advisory. While this is a planned event, the specific details of the safety zone and its implementation are still under review. This event will likely involve temporary marine traffic management and safety personnel. Businesses involved in marine services, event support, or safety equipment could find opportunities related to this planned event. Early engagement with event organizers or the Coast Guard may provide insights into potential needs before final plans are set.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Applicant:
- UNITED STATES COAST GUARD SECTOR JACKSONVILLE
St. Johns River Status Report on Water Quality & Manatees
The St. Johns River is the subject of a status report focusing on water quality and manatee populations. This item is currently pending review by the Jacksonville Waterways Commission. The report will likely involve data collection and analysis related to the river's environmental health. This early stage presents an opportunity for businesses involved in environmental monitoring, data analysis, and potentially related consulting services to engage. Understanding the current status of the river's water quality and manatee presence could inform future projects or services needed to address any identified issues. Early engagement before specific projects are defined allows businesses to align their offerings with potential future needs.
- Board:
- Jacksonville Waterways Commission
- Date:
- 2026-05-13
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis