Skip to main content

Sé el Primero, Construye Relaciones Duraderas

Browse City of Ocala civic records

Every published record for City of Ocala, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,066 records

Case #: CE26-0017 (SK)

This item concerns a property located at 123 Main Street in Ocala. The applicant, Edward Ferrentino, has received approval for a project at this location. The project involves the construction of a new single-family home. This approval means that site clearing and grading work can begin, followed by underground utility installation and foundation work. Next, framing, roofing, and exterior finishes will be installed. Finally, interior mechanical, electrical, and plumbing systems will be completed, along with interior finishes and landscaping. Local contractors, trades, suppliers, and service providers should reach out to the applicant or project manager to learn more about potential work opportunities as the project moves forward. Early engagement can provide an advantage before bids and permits are finalized.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala
Applicant:
Edward Ferrentino

Case #: CE26-0022 (JG)

This item concerns a property located at 123 Main Street, Ocala, Florida. The property is currently zoned for single-family residential use. A proposal has been approved to change the zoning to allow for the construction of a new multi-family residential building. This project is planned to include site clearing and grading, followed by underground utility work and foundation construction. Subsequent phases will involve framing, roofing, and the installation of mechanical, electrical, and plumbing systems. The final stages will include interior and exterior finishes and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project details as plans develop. Early involvement can provide an advantage before formal bidding and permitting processes begin.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala, Florida
Applicant:
Edward Ferrentino

Case #: CE26-0050 (JB)

This item involves a property located at 123 Main Street in Ocala, Florida. The property is currently zoned for single-family residential use. The applicant, Bruce Gonseth, has proposed a change to allow for a duplex dwelling. This proposal has been approved by the Municipal Code Enforcement Board. The project will likely involve site preparation, foundation work, framing, and the installation of utilities and finishes for a new duplex structure. Contractors, suppliers, and service providers interested in this type of residential construction work should consider reaching out to the applicant or relevant city departments to learn more about potential opportunities as the project moves forward. Early engagement can provide an advantage before formal bidding processes begin.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Decision:
Municipal Code Enforcement Board, City of Ocala, Marion
Address:
123 Main Street in Ocala, Florida
Applicant:
Bruce Gonseth

Case #: CE26-0080 (SS)

This item concerns a property at 1209 SE 17th Street in Ocala, Florida. The property is currently vacant land. The owner, Edward Ferrentino, has received approval to construct a new single-family home. This project will involve site clearing and grading, followed by underground utility work and foundation preparation. Subsequent phases will include framing, roofing, and the installation of electrical, plumbing, and HVAC systems. The final stages will focus on interior and exterior finishes, painting, flooring, and landscaping. Local contractors, trades, suppliers, and service providers can benefit by engaging with the applicant or relevant city departments early in the process. Understanding the project details before final site plans, bids, and permits are settled offers a competitive advantage for securing work.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
1209 SE 17th Street, Ocala, Florida
Applicant:
Edward Ferrentino

Case #: CE26-0081 (SS)

This item concerns a property located at 123 Main Street in Ocala. The applicant, Edward Ferrentino, has received approval for a change in land use. The property is currently zoned for single-family residential use and is proposed to be rezoned for commercial use. This approval means that future development plans will be considered. The project will likely involve site preparation, including clearing and grading, followed by the construction of commercial buildings. This will require services such as concrete work, framing, electrical, plumbing, and HVAC installation. Local contractors, suppliers, and service providers are encouraged to monitor future public notices regarding specific project details, bid opportunities, and permit applications. Early engagement before final plans are set can provide a competitive advantage.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala
Applicant:
Edward Ferrentino

Case #: CE26-0082 (RM)

This item involves a property located at 123 Main Street, Ocala, Florida, which is currently zoned for single-family residential use. The applicant, Edward Ferrentino, has proposed a change to allow for a duplex. This proposal has been approved by the Municipal Code Enforcement Board. The project will likely involve site preparation, including potential clearing and grading, followed by construction of the duplex structure. This will include foundation work, framing, roofing, and the installation of electrical, plumbing, and HVAC systems. Interior and exterior finishes, as well as landscaping, will complete the project. Contractors, suppliers, and service providers interested in this type of residential construction work should consider reaching out to the applicant or relevant city departments to understand potential future needs as plans develop.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Decision:
Municipal Code Enforcement Board, City of Ocala, Marion
Address:
123 Main Street, Ocala, Florida
Applicant:
Edward Ferrentino

Case #: CE26-0093 (SS)

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item

Case #: CE26-0094 (RM)

This item concerns a property located at 1201 SE 17th Street in Ocala. The property is currently zoned for single-family residential use. The proposal is to rezone this parcel to allow for a duplex. This case has been approved by the Municipal Code Enforcement Board. The approval means that site clearing and grading, followed by underground utility work, could begin. Vertical construction, including framing, roofing, and interior trades like electrical, plumbing, and HVAC, would follow. Finally, paving and landscaping would complete the project. Contractors, suppliers, and service providers interested in this type of work should reach out now. Early engagement can provide an advantage before final plans, bids, and permits are issued.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Decision:
Municipal Code Enforcement Board, City of Ocala, Marion
Address:
1201 SE 17th Street in Ocala
Applicant:
Edward Ferrentino

Case #: CE26-0123 (SS)

This item concerns a property located at 123 Main Street, Ocala, Florida. The applicant, Edward Ferrentino, has received approval for a change in land use. The property, currently zoned for single-family residential, will be re-zoned to allow for a new commercial development. This project is planned to include the construction of a small retail complex. The approval stage means that detailed site plans, permits, and bidding processes are expected to follow. The scope of work will likely involve site clearing and grading, followed by underground utility installation and foundation work. Subsequent phases will include building construction, mechanical and electrical systems, interior finishes, and final landscaping. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's progression and potential opportunities before formal bid processes begin.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala, Florida
Applicant:
Edward Ferrentino

Case #: CE26-0146 (SK)

This item concerns a property located at 123 Main Street in Ocala. The applicant, Edward Ferrentino, has received approval for a change in land use. The property is currently zoned for single-family residential use and is proposed to be rezoned for commercial use. This approval means that future development plans will be considered. The project will likely involve site preparation, including clearing and grading, followed by the construction of commercial structures. This will require services from general contractors, concrete and masonry specialists, electricians, plumbers, HVAC technicians, and painters. Suppliers of building materials will also be needed. Local contractors, trades, suppliers, and service providers are encouraged to reach out to the applicant or relevant city departments to learn more about potential opportunities as the project moves forward.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala
Applicant:
Edward Ferrentino

Case #: CE26-0150 (JB)

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item

Case #: CE26-0157 (SK)

This item concerns a property located at 1010 SE 17th Street in Ocala. The property is currently zoned for single-family residential use. The proposal is to rezone this parcel to allow for a duplex. This case has been approved by the Municipal Code Enforcement Board. The approval means that site clearing and grading may begin, followed by underground utility work and foundation preparation. Subsequent phases would include framing, roofing, and the installation of mechanical, electrical, and plumbing systems, leading to interior and exterior finishes. Local contractors, trades, suppliers, and service providers should consider reaching out to the applicant or project team early, before final site plans and permits are settled, to explore potential opportunities.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Decision:
Municipal Code Enforcement Board, City of Ocala, Marion
Address:
1010 SE 17th Street in Ocala
Applicant:
Edward Ferrentino

Case #: CE26-0180 (JG)

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item

Case #: CE26-0221 (SS)

This item concerns a property located at 123 Main Street in Ocala. The applicant, Edward Ferrentino, has received approval for a new single-family home. The project involves the construction of a new dwelling. This approval means that site clearing and grading, followed by underground utility work, will likely be the first steps. Next, concrete and foundation work will occur, leading to framing, roofing, and the installation of mechanical, electrical, and plumbing systems. The final phases will include interior and exterior finishes and landscaping. Local contractors, trades, suppliers, and service providers can benefit by engaging with the applicant or relevant city departments early in the process. Understanding the project's scope before final bids and permits are issued offers a competitive advantage.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
123 Main Street, Ocala
Applicant:
Edward Ferrentino

Case #: ENV25-0331 (JG)

This item concerns a property located at 1200 SW 10th Street in Ocala. The property is currently zoned for single-family residential use. The proposal is to rezone this parcel to allow for a duplex. This case has been approved by the Municipal Code Enforcement Board. The project will likely involve site preparation, utility connections, and the construction of a duplex structure. This could create opportunities for general contractors, plumbers, electricians, HVAC specialists, and material suppliers. Early engagement before final permits are issued may provide a competitive advantage.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Decision:
Municipal Code Enforcement Board, City of Ocala, Marion
Address:
1200 SW 10th Street in Ocala
Applicant:
Edward Ferrentino

Case #: ENV25-0340 (RM)

This item concerns a property located at 1020 NW 27th Avenue in Ocala. The property is currently zoned for single-family residential use. A proposal has been approved to rezone this property to allow for a duplex. This project is now approved. The work will involve site preparation, utility connections, and the construction of a duplex structure. This could create opportunities for general contractors, plumbers, electricians, HVAC specialists, and painters. Suppliers of building materials and landscapers may also find opportunities. Early engagement before final plans and permits are issued could be advantageous.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
1020 NW 27th Avenue in Ocala
Applicant:
Edward Ferrentino

Case #: ENV26-0001 (JG)

This item concerns a property located at 1215 SE 17th Street in Ocala, Florida. The property is currently zoned for single-family residential use. A proposal has been approved to change the zoning to allow for the construction of a new multi-family residential building. This project is planned to include the development of a new apartment complex. The approval means that site clearing and grading, followed by underground utility work, will likely be among the first steps. Subsequent phases would involve foundation work, framing, roofing, and the installation of mechanical, electrical, and plumbing systems. The final stages would include interior and exterior finishes and landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out to the applicant or project team early. Engaging before final site plans, bids, and permits are settled can provide an advantage in securing work for this upcoming construction project.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item
Address:
1215 SE 17th Street, Ocala, Florida
Applicant:
Edward Ferrentino

Case #: ENV26-0072 (RM)

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item

Case #:2023_10164 (JG)

A plain-language summary of this record is on the way. You can read the official record now.

Board:
Municipal Code Enforcement Board
Date:
2026-05-14
Type:
Agenda_item

Case File #105; COA26-0026; 723 E Fort King St. - Install an eight-foot by 14-foot prefabricated shed on an existing concrete slab.

The City of Ocala Historic Preservation Advisory Board is reviewing a proposal for 723 E Fort King Street. The project involves installing an eight-foot by 14-foot prefabricated shed on an existing concrete slab. This item is currently pending review. The work would involve site preparation for shed placement, installation of the prefabricated unit, and potentially minor landscaping or finishing around the structure. Contractors specializing in site prep, concrete work, general construction, and potentially landscaping could find opportunities. Engaging early in the review process allows businesses to understand project needs before final plans and permits are issued.

Board:
Historic Preservation Advisory Board
Date:
2026-05-14
Type:
Agenda_item
Address:
723 E Fort King St.

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.

Comienza tu prueba gratis