T. BOMARITO
City Commission Meeting · 2026-06-16 · agenda_item
A project is planned involving the installation of a 4-inch PVC force main, with some sections to be installed via open cut and others via horizontal directional drilling. The project includes removing and replacing a fiber optic cable box, requiring coordination with AT&T. This item is currently under review, with design phases noted as conceptual alignment, 60% design, and 100% design with revisions. The work would involve site preparation, underground utility installation, and potentially road or sidewalk work related to the open cut sections. Contractors specializing in underground utilities, directional drilling, and concrete work may find opportunities as the project moves through its design and review stages. Early engagement could be beneficial before final bid and permit processes are completed.
- force main length (open cut)
- 356 LF
- force main length (HDD)
- 112 LF
- minimum clearance
- 3.00 '
- minimum clearance
- 10.00 '
- utility easement
- 15.00 '
Industries that could win this work
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
Follow this across meetings