04-14-2026 Agenda
Planning & Zoning Commission Meeting · 2026-04-14 · agenda
The Ocoee Planning and Zoning Commission meeting on April 14, 2026, at 6:15 PM in the Ocoee Commission Chambers (1 N. Bluford Avenue, Ocoee, Florida) will include New Business item: Maguire Plaza Large-Scale Preliminary Final Site Plan, Project No. LS-2025-006. The agenda also includes approval of minutes from the March 10, 2026 meeting, a Project Status Report, and adjournment. No decisions on specific projects are listed as having been made in this agenda document.
Agenda items
- 1) INSTALL ALL DRIP TUBING AT GROUND LEVEL AFTER PLANT INSTALLATION. INSTALL NETAFIM TLS6 U SHAPED WIRESTABILIZERS A MIN. OF 4' O.C. TO HOLD THE LINES IN PLACE.
- 1. 1248 Verde Pines Court – Thomas Property Variance; Project No. VR -26-05 (Planner
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Legal Services
- Engineering & Architecture
- 1. Location Map
- 1. Maguire Plaza Large-Scale Preliminary Final Site Plan; Project No. LS-2025
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Maguire Plaza Large-Scale Preliminary Final Site Plan; Project No. LS-2025
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. Project Status Report
- 1. Project Status Report
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Electrical
- HVAC & Climate Control
- Plumbing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 1. Project Status Report
- 10) ALL MAINLINE PIPING SHALL BE BURIED TO A MINIMUM DEPTH OF 18" OF COVER. ALL LATERAL PIPING SHALL BE BURIED TO A MINIMUM DEPTH OF 12" OF COVER.
- 11) ALL CONTROL WIRES SPLICES SHALL BE MADE IN VALVE BOXES USING 3M DBR-Y CONNECTORS AND SEALANTAND ALL WIRE SHALL BE 14 GAUGE, EXCEPT AS DETAILED FOR TWO-WIRE SYSTEMS.
- 13) THE CONTRACTOR SHALL EXERCISE CARE SO AS NOT TO DAMAGE ANY EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REPAIRS AND COST OF ANY DAMAGE CAUSED BY THEIR WORK.
- 14) INSTALL FLUSH VALVES WHERE SHOWN AT THE ENDS OF EACH RUN OF DRIP TUBING AND ONE FOR EVERY 15GPM OF TUBING.
- 16) THE DRIP ZONE VALVE ASSEMBLY SHALL BE PLACED INSIDE AN ARMOR JUMBO VALVE BOX. THE VALVE SHALL BEINSTALLED AS PER THE DETAIL ON THE PLANS.15) CLEARLY AND NEATLY MARK THE TOP OF EACH VALVE BOX WITH THE TYPE OF EQUIPMENT THAT IT CONTAINS.(I.E. VALVE, FLUSH VALVE, ETC.)
- 19) THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THEIR WORK WITH THE LANDSCAPECONTRACTOR.18) REFER TO THE ZONE CONTROL KIT DETAIL FOR FILTER SIZES.17) THE DRIP TUBING SHALL HAVE EMITTERS EVERY 12" AND SHALL BE SPACED 12" APART IN GROUND COVER BEDSAND A MINIMUM OF TWO RUNS FOR EACH ROW OF SHRUBS WHEN THE SHRUBS ARE SPACED FARTHER THAN 2' ONCENTER.
- 2) KEEP ALL DRIP LINE CLEAN AT ALL TIMES BEFORE THE FINAL CONNECTION. ALL TUBE ENDS SHALL BEINTERCONNECTED TO ALL OTHER DRIP TUBES. DO NOT DEAD END TUBING. SINGLE ROWS SHALL HAVE A END CAPAND NOT BENT OVER OR TAPED.
- 2. 1460 N. Lakewood PUD - Annexation & Rezoning to PUD (Concurrency & Commitment
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 2. Aerial Map
- 20) REFER TO THE LANDSCAPE PLANS WHEN TRENCHING TO AVOID TREES AND SHRUBS. HAND DIG AROUND ANY EXISTING TREES. DO NOT CUT ANY ROOTS OVER 2" IN DIAMETER. 21) THE CONTRACTOR SHALL PREPARE AN AS-BUILT DRAWING SHOWING ALL IRRIGATION INSTALLATION. THE CONTRACTOR SHALL NEATLY MARK IN RED INK ON WHITE BOND PAPER ANY INSTALLATION THAT DEVIATES FROM THE PLAN. THE AS-BUILT DRAWING SHALL ALSO LOCATE ALL MAINLINE AND VALVES BY SHOWING EXACT MEASUREMENTS FROM HARD SURFACES. MEASUREMENTS SHALL BE MARKED ON THE PLAN EVEN WHEN THE EQUIPMENT IS INSTALLED IN THE EXACT LOCATION AS THE PLAN.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Landscaping & Lawn Service
- 22) ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE AGAINST ALL DEFECTS INEQUIPMENT AND WORKMANSHIP. (OR AS OUTLINED IN THE WRITTEN SPECIFICATIONS)
- 24) 48 HOURS BEFORE DIGGING, CALL 1-800-432-4770 (SUNSHINE STATE ONE CALL CENTER)
- 3) AVOID SHARP BENDS IN THE TUBING. DO NOT BEND THE TUBING WITH LESS THEN A 12" RADIUS. THERE SHALLNOT BE ANY KINKS IN THE TUBING.
- 3. FLU Map
- 3. Holiday Inn Express Special Exception; Project No. 15- 25-SE-034 (Concurrency &
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- 4) ALL DRIP TUBING SHALL HAVE UNIFORM SPACING AND BURIAL DEPTH. THE PLAN DOES NOT ALWAYS REFLECT THEEXACT SPACING OR LAYOUT OF THE TUBING. LAYOUT THE TUBING DOWN THE LONGEST WIDTH WHEN POSSIBLE. ADAPTTHE TUBING TO CURVED BEDS OR PLANTERS AS REQUIRED. ADJUST AND ADAPT THE TUBING FOR ALL TREES. REFER TOTHE TREE DRIP RING DETAIL.
- 4. Annual Comprehensive Plan Text Amendment to Adopt Five-Year Schedule of Capital
- Engineering & Architecture
- Business Consulting
- Office & Business Support Services
- Government Authority
- 4. Zoning Map
- 5) INSTALL DRIP TUBING TO ALL AREAS THAT SHALL RECEIVE PLANT MATERIAL.SEE THE LANDSCAPE PLAN FOR THE EXACT LOCATIONS. THERE SHALL BE A MINIMUM OF TWO ROWS OF TUBING ONA SINGLE ROW OF PLANTS.
- 5. Maguire Plaza Site Plan
- 6) SPACE TUBING AS NOTED ON THE PLAN. DO NOT SNAKE TUBING BACK AND FORTH EXCEPT WHERE SHOWN ONTHE PLAN. ALWAYS INSTALL A HEADER PIPE UNLESS THE TOTAL GALLONAGE OF AN AREA IS 3 GPM OR LESS.
- 6. WOT Ad
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 7) REFER TO THE MANUFACTURERS DRIP INSTALLATION MANUAL FOR INSTALLATIONINSTRUCTIONS. ALL FITTINGS SHALL BE THE SAME TYPE AND MANUFACTURER AS THE DRIP TUBING.
- 9) INSTALL A A "SYSTEM ON" INDICATOR FLAG ON EVERY ZONE WHERE IT IS SEEN FROM THE CONTROL VALVE.8) ALWAYS FLUSH ALL LINES BEFORE FINAL CONNECTION.
- N. Lakewood Avenue as a future three- lane roadway. Mr. Gerry referenced recent
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Engineering & Architecture
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta