Skip to main content

Sé el Primero, Construye Relaciones Duraderas

10. a) Construction

City Commission Meeting · 2026-05-05 · agenda_item

A construction project is currently in the permitting phase for Phase II construction. Environmental permits from USACE and DEP are being applied for. The project is designed to last 40-50 years and includes considerations for storm surge and hurricane impacts, with critical elevations and structural connections designed to withstand current coastal codes and engineering standards. This project is early in the public process, with applications for permits underway. The scope of work will involve site clearing and grading, followed by underground utility work, and then vertical construction including framing, roofing, and mechanical and finish trades. The final phase will include landscaping. Local contractors, trades, suppliers, and service providers are encouraged to reach out now, as this project is in its early stages before site plans, bids, and permits are finalized, offering an advantage in securing future work.

design life
40-50 years

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • HVAC & Climate Control
  • Plumbing
  • Roofing
  • Drywall & Insulation
  • Painting & Flooring
  • Building & Industrial Supply
  • Real Estate Development
  • Engineering & Architecture

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta