B. When the design- build construction process is utilized, a modified system utilizing

Panama City Port Authority · 2026-05-21 · agenda_item

This item concerns a potential change in how future construction projects are managed by the Panama City Port Authority. Currently, the Port Authority is reviewing a modified design-build process that would follow Florida Statute 287.055 (9). Executive Director approval is required to use this design-build method. This review stage means that specific projects have not yet been identified, but the process itself is under consideration. If approved, this could lead to projects involving site preparation, utility work, building construction, and final finishes. Contractors, suppliers, and service providers should monitor this review process. Early engagement could provide an advantage as the Port Authority considers how future projects will be procured.

Industries that could win this work

  • General Contractor
  • Engineering & Architecture
  • Legal Services
  • Building & Industrial Supply

Sigue este tema en todas las reuniones

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta