Planning Board Meeting Agenda for July 13, 2026, with three quasi-judicial requests: a variance for a carport setback at 1919 Tyndall Drive, a variance for accessory structure size at 222 Elm Avenue, and a rezoning from Light Industrial to Heavy Industrial at 1023 E 15th Street. The document is an agenda, so no decisions are stated. Public comment sentiment is not stated in the document.
Agenda items
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 1) zoning district of the City of Panama City Unified Land Development Code (ULDC). The applicant is
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Engineering & Architecture
- 1. 4:0 0 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. 4:00 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. Allow a use that is specifically or by inference prohibited in any zoning district classification,
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to
- 1. Height;
- 1. Height;
- 1. Provide off-street parking as specified in chapter 108.
- 1. Provide off-street parking as specified in chapter 108.
- 1. Single-family detached dwellings on individual parcels;
- 1. Single-family detached dwellings on individual parcels;
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- General Contractor
- Building & Industrial Supply
- 1. That the requested variance maintains the basic intent and purpose of the subject regulations, particularly as it
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Construction (Other)
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel area.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Transitional community residences.
- 1. Transitional community residences.
- 10. CONCRETE
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 11. FOUNDATION
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 12. STEEL
- 13. WOOD
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 14. City Neighborhood Planning Area District Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- 14. ROOF & WALL SHEATHING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Apply to any provisions for which the code specifically prohibits waiver or modification.
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 2. Conform to the landscaping and buffering requirements as specified in chapter 107.
- Site Prep, Grading & Hardscape
- General Contractor
- Landscaping & Lawn Service
- 2. DESIGN LOADS:
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110-9.A.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Business Consulting
- Office & Business Support Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Government Authority
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- Office & Business Support Services
- Media & Publishing
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. That the requested variance is otherwise compatible with the surrounding land uses and would not be
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 2. The maximum building footprint per building shall be 4,000 square feet. An exception is made
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 2. Yards;
- 2. Yards;
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation (BFE) or crown
- 3. Announcements – Disclosures (as applicable) : Board Member Cherry disclosed that she made site visits for
- 3. Announcements – Disclosures (as applicable): Board Member Cherry disclosed that she made site visits for
- 3. Height: All structures shall have a maximum height limitation of two stories plus an attic story.
- 3. Off-street parking and loading;
- 3. Off-street parking and loading;
- 3. Public and private schools grades K—12.
- 3. Public and private schools grades K—12.
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. That the requested variance is consistent with, and in furtherance of, the goals, objectives and policies of
- 3. WIND DESIGN CRITERIA
- General Contractor
- Concrete & Masonry
- Roofing
- Engineering & Architecture
- 4. Landscaping and buffers;
- 4. Landscaping and buffers;
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Public or noncommercial private recreation.
- 4. Public or noncommercial private recreation.
- 4. Setbacks:
- 4. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 4. That the plight of the petitioner is due to unique circumstances of the property or petitioner which would
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Separation of uses;
- 5. Separation of uses;
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 5. That the variance requested is the minimum variance that is necessary to afford relief to the petitioner, while
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Lot coverage;
- 6. Lot coverage;
- 6. Public utilities customarily found in residential areas;
- 6. Public utilities customarily found in residential areas;
- 6. Requests :
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Requests:
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Residential Future Land Use Map Category
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Non-Action Item(s)
- 7. Non-Action Item(s)
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- 7. Such other provisions of the code which do not specifically prohibit such requests.
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. Applicability. Variance requests that satisfy the criteria of section 102-42D. are authorized from the
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned Neighborhood Residential (NR):
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- B. The city shall not act upon any variance request that would:
- B. The city shall not act upon any variance request that would:
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. Supplemental application requirements. In addition to the general application requirements, the
- Engineering & Architecture
- Legal Services
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- D. Additional requirements:
- D. Additional requirements:
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- D. Variance review criteria ; city action. The planning board shall hold its public hearing and, after
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- Legal Services
- Engineering & Architecture
- E. In granting any variance, the planning board may prescribe conditions and safeguards intended to mitigate
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- F. No variance shall supersede or abrogate the requirements of flood damage prevention, or the requirements
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- II. Ex-parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- III. Identification of Applicant and Affected Parties* that intend to participate in
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- X. Close of Evidence and Public Hearing. Deliberation and action by the
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line.
- i. 20 feet from the front parcel line.
- i. Building heights shall exclude habitable attics and below grade parking.
- i. Setbacks shall be as summarized in Table 104-36.3.A.
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line.
- ii. 20 feet from the rear parcel line.
- ii. Porches may extend up to ten feet into setbacks provided they are at least eight feet deep.
- ii. Stories may not exceed 12 feet in height from finished floor to finished ceiling.
- ii. corner: 60 feet
- ii. corner: 60 feet
- iii. 7 feet from the side parcel line.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- iii. 7 feet from the side parcel line.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. Heights shall be measured to the eave of the roof or roof deck (if flat).
- iii. cul-de-sac or corner: 20 feet
- iii. cul-de-sac or corner: 20 feet
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. The first finished floor in residential buildings shall be raised a minimum of 24" above the
Follow this across meetings
Board
Planning BoardApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis