August 10, 2026 Planning Board Meeting Agenda packet 2026-08-10
Planning Board · 2026-08-10 · packet
[1023 E 15th Street; 4019 Valencia Court; 551 E 6th Street; 2913 E 5th Court; 1919 Tyndall Drive; 222 Elm Avenue; case CPC-PLN-2026-1253; CPC-PLN-2026-1618; CPC-PLN-2026-1618; CPC-PLN-2026-1500; CPC-PLN-2026-1278; CPC-PLN-2026-1478] Planning Board meeting agenda for August 10, 2026, with four quasi-judicial requests: 1) Rezoning at 1023 E 15th Street from Light Industrial (LI) to Heavy Industrial (HI), 4.563 acres, owner S A RECYCLING LLC, applicant Kurtis Adams, case CPC-PLN-2026-1253, continued from July 13, 2026, City Commission hearings August 11 and August 25, 2026, staff recommendation APPROVE. 2) Variance at 4019 Valencia Court for 20 feet of relief from R-1 front parcel line setback with remaining 0 feet, 0.344 acres, owner MICKEY A HALL, applicant Mickey Hall, case CPC-PLN-2026-1618, Planning Board hearing August 10, 2026, no City Commission hearing. 3) Variance at 551 E 6th Street to build a 5,000 square foot commercial building with minimum front setback of 25 feet, 0.414 acres, owner JASON OAKES, applicant Brad Harris, case CPC-PLN-2026-1618, Planning Board hearing August 10, 2026, no City Commission hearing. 4) Rezoning at 2913 E 5th Court from Neighborhood Residential (NR) to Neighborhood General (NG), 0.594 acres, owner VALENTINOS LLC, applicant USA Building Restoration LLC (Alejandro Martin), case CPC-PLN-2026-1500, Planning Board hearing August 10, 2026, City Commission hearings September 8 and September 22, 2026. The document also includes minutes from July 20, 2026, with two approved variances: 1919 Tyndall Drive for a carport setback variance from 20 feet to 16 feet, 0.528 acres, owner STEPHANIE D MARSHALL, applicant Tim Clark, case CPC-PLN-2026-1278, approved 3-0; and 222 Elm Avenue for accessory structure size variance to exceed 60% maximum square footage, 0.237 acres, owner JEFFREY DRIGGERS, applicant Jeffrey Driggers, case CPC-PLN-2026-1478, approved 3-0. No public participation was noted for the July 20, 2026 items. The document also contains a staff report for case CPC-PLN-2026-1253 with staff recommendation to approve. No decision is stated for the August 10, 2026 items as it is an agenda. No public comment sentiment is stated for the August 10, 2026 items. [551 E 6th Street, Panama City, FL; 2913 E 5th Court, Panama City, FL; 4019 Valencia Court, Panama City, FL 32405; case CPC-PLN-2026-1657; CPC-PLN-2026-1337; not stated] The document contains two separate staff reports for public hearings. First, a variance request for a 5,000 square foot commercial building at 551 E 6th Street, Panama City, FL (Parcel ID #: 20387-000-000), case number CPC-PLN-2026-1657, with a staff recommendation to APPROVE. The applicant is Jason Oakes, and the applicant contact is Brad Harris. The request is to allow a minimum front setback of 25 feet instead of the required 15 feet in the Neighborhood General (NG) zoning district. The property is 0.414 acres. The staff report date is July 31, 2026, and the Planning Board public hearing is August 10, 2026. Second, a rezoning request for 2913 E 5th Court (Parcel ID #: 23267-00-000), case number CPC-PLN-2026-1337, with a staff recommendation to APPROVE. The owner is Valentinos LLC, and the applicant is USA Building Restoration, LLC (Alejandro Martin). The request is to rezone from Neighborhood Residential (NR) to Neighborhood General (NG). The property is 0.594 acres. The staff report date is July 31, 2026, the Planning Board public hearing is August 10, 2026, and City Commission hearings are September 8, 2026 and September 22, 2026. The document also includes construction plans for a carport at 4019 Valencia Court, Panama City, FL 32405, for Mickey Hall, job number 25610, dated 05/23/2026, but no decision is stated for this. No public comment or stakeholder sentiment is stated in the document. The document is a staff recommendation for a rezoning request in Panama City, Florida. The exact street address, parcel/folio, acreage, and applicant name are not stated. The request is to rezone to a zoning district with a C4 (Urban General) context classification by FDOT, with additional requirements on parking layout and location for a more pedestrian friendly and walkable community. All future development will be subject to development review and must satisfy bulk regulations of the Neighborhood General (NG) zoning district (Section 104-36.2) and other relevant provisions of the local Comprehensive Plan. The request satisfies criteria in Sec. 102-41(E) of the Unified Land Development Code and the City of Panama City Comprehensive Plan (Goal 1A, Objective 1.1, Policy 1.1.1, Neighborhood Planning Area District Future Land Use Category, Future Land Use Element). Staff recommends the Planning Board transmit a recommendation of approval to the City Commission, and the City Commission approve the rezoning request. No public comment or stakeholder sentiment is stated.
Agenda items
- 1. 3 :0 2 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. 3:02 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. All uses allowed in the LI zoning category.
- 1. All uses allowed in the LI zoning category.
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. Not degrade the established level of services in the Comprehensive Plan or the minimum concurrency
- 1. Not degrade the established level of services in the Comprehensive Plan or the minimum concurrency
- 1. Single-family detached dwellings on individual parcels;
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. Transitional community residences.
- 10. Distribution Easement granted to Gulf Power Company, a corporation, recorded July 2, 1991 in Official
- 11. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 12. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- 13. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- 14. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- 15. Underground Easement granted to Florida Power & Light Company, recorded January 15, 2025 in
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 16. Underground Easement granted to Florida Power & Light Company, recorded January 15, 2025 in
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 17. Underground Easement granted to Florida Power & Light Company, recorded January 31, 2025 in
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 18. Dedication and any other relevant matters as shown on the plat of Keith's Fourth Addition to Panama
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- Government Authority
- 19. Underground Easement granted to Florida Power & Light Company, recorded January 9, 2025 in
- General Contractor
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Engineering & Architecture
- Real Estate Development
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. In harmony with the general intent of the Comprehensive Plan. (Goals listed as applicable.)
- 2. In harmony with the general intent of the Comprehensive Plan. (Goals listed as applicable.)
- 2. Provide off-street parking as specified in chapter 108.
- 2. Provide off-street parking as specified in chapter 108.
- 2. Scrap processing.
- 2. Scrap processing.
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. The floor area ratio shall not exceed 0.85.
- 2. The floor area ratio shall not exceed 0.85.
- 3. All structures shall have a maximum height limitation of 35 feet
- 3. All structures shall have a maximum height limitation of 35 feet
- Construction (Other)
- Engineering & Architecture
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation
- 3. Announcements – Disclosures (as applicable) : None .
- 3. Announcements – Disclosures (as applicable): None.
- 3. Landscaping and buffering is required as specified in chapter 107.
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Landscaping & Lawn Service
- Waste Management
- 3. Landscaping and buffering is required as specified in chapter 107.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 3. No maximum height.
- 3. No maximum height.
- 3. Not exceed traffic limitations, create a fire hazard, or a hazard to the public health, welfare and safety.
- 3. Not exceed traffic limitations, create a fire hazard, or a hazard to the public health, welfare and safety.
- 3. Public and private schools grades K—12.
- 3. Recycling centers.
- 3. Recycling centers.
- 4. Any industrial, manufacturing, distribution, storage or warehousing use which is otherwise
- 4. Any industrial, manufacturing, distribution, storage or warehousing use which is otherwise
- 4. Compatible with adjacent land uses and districts, and not create a potential nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Compatible with adjacent land uses and districts, and not create a potential nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Business Consulting
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Public or noncommercial private recreation.
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- Real Estate Development
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Heavy industrial uses shall not be located adjacent to any zoning category that allows for
- 5. Heavy industrial uses shall not be located adjacent to any zoning category that allows for
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Residential Future Land Use Category
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Concrete & Masonry
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 5. Residential Future Land Use Category
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Carpentry & Cabinetry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Industrial Land Use Category
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- 6. Industrial Land Use Category
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 6. Public utilities customarily found in residential areas;
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 6. Requests :
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. Requests:
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 7. Easement granted to the City of Panama City, Florida, a Florida municipal corporation, recorded May
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Non-Action Item(s) : Non e
- 7. Non-Action Item(s): None
- 8. Distribution Easement granted to Gulf Power Company, a corporation, recorded November 24, 1981 in
- Utilities (Sub)
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- 9. INTENTIONALLY DELETED (moved to Requirement 14)
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- C. Additional requirements:
- C. Additional requirements:
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- D. Additional requirements:
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. June 8 , 2026 minutes
- a. June 8, 2026 minutes
- b. July 13 , 2026 minutes
- b. July 13, 2026 minutes
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. corner: 60 feet
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- ii. corner: 60 feet
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- ii. corner: 60 feet
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. cul-de-sac or corner: 20 feet
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
Follow this across meetings
Board
Planning BoardApplicants and firms
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis