August 10, 2026 Planning Board Meeting Agenda packet 2026-08-10
Planning Board · 2026-08-10 · packet
[1023 E 15th Street; 4019 Valencia Court; 551 E 6th Street; 2913 E 5th Court; 1919 Tyndall Drive; 222 Elm Avenue; case CPC-PLN-2026-1253; CPC-PLN-2026-1618; CPC-PLN-2026-1618; CPC-PLN-2026-1500; CPC-PLN-2026-1278; CPC-PLN-2026-1478] Planning Board meeting agenda for August 10, 2026, with four quasi-judicial requests. 1) Rezoning at 1023 E 15th Street, 4.563 acres, from Light Industrial (LI) to Heavy Industrial (HI), owner S A Recycling LLC, applicant Kurtis Adams, case CPC-PLN-2026-1253, continued from July 13, 2026, City Commission hearings August 11 and August 25, 2026. 2) Variance at 4019 Valencia Court, 0.344 acres, for 20 feet of relief from R-1 front setback with remaining 0.5 foot setback, owner Mickey A Hall, applicant Mickey Hall, case CPC-PLN-2026-1618. 3) Variance at 551 E 6th Street, 0.414 acres, to build a 5,000 square foot commercial building with minimum front setback of 25 feet, owner Jason Oakes, applicant Brad Harris, case CPC-PLN-2026-1618. 4) Rezoning at 2913 E 5th Court, 0.594 acres, from Neighborhood Residential (NR) to Neighborhood General (NG), owner Valentinos LLC, applicant USA Building Restoration LLC (Alejandro Martin), case CPC-PLN-2026-1500, City Commission hearings September 8 and September 22, 2026. The document also includes minutes from July 20, 2026, where two variances were approved: 1919 Tyndall Drive (carport setback variance, case CPC-PLN-2026-1278) and 222 Elm Avenue (accessory structure size variance, case CPC-PLN-2026-1478). A staff report recommends approval for the rezoning at 1023 E 15th Street. No decisions are stated for the August 10, 2026 items; they are scheduled for public hearing. Public comment is not stated for any item. [4019 Valencia Court, Panama City, FL 32405; case CPC-PLN-2026-1618] The document is a staff report for a variance request at 4019 Valencia Court, Panama City, FL 32405, Parcel ID 11727-090-000. The applicant, Mickey Hall, requests a 0 foot front yard setback variance from the required 20 feet in the Residential-1 (R-1) zoning district to build an attached 24 x 24 carport. The property is 0.344 acres. The staff recommends approval. The public hearing is scheduled for August 10, 2026. The document also includes an ALTA/NSPS land title survey for a separate property at 1023 E 15th St, Panama City, FL 32405-6119, for SA Recycling LLC, which is 4.869 acres total, with a proposed zoning change from Light Industrial to Heavy Industrial. The survey notes the property is in Zone X (unshaded) of the flood insurance rate map. The document also includes carport construction plans for the Valencia Court property. No public comment sentiment is stated in the document. [4019 Valencia Court, Panama City, FL 32405; 551 E 6th Street, Panama City, FL; 2913 E 5th Court, Panama City, FL; case CPC-PLN-2026-1657 (551 E 6th Street); CPC-PLN-2026-1337 (2913 E 5th Court); not stated for carport] The document contains two distinct items. First, a set of construction plans for a carport at 4019 Valencia Court, Panama City, FL 32405, for owner Mickey Hall, job number 25610, dated 05/23/2026, drawn by Harris Solution. The carport is 24'-0" by 24'-0" with 6" x 6" P.T. posts, 2" x 8" P.T. beams and rafters, 26 ga. aluminum roof panels, and 12" x 12" x 36" concrete footings. Second, a staff report for a variance request at 551 E 6th Street (PARCEL ID #: 20387-000-000), case number CPC-PLN-2026-1657, for a 5,000 square foot commercial building, with a staff recommendation of APPROVE. Third, a staff report for a rezoning request at 2913 E 5th Court (PARCEL ID #: 23267-000-000), case number CPC-PLN-2026-1337, from Neighborhood Residential (NR) to Neighborhood General (NG), with a staff recommendation of APPROVE.
Agenda items
- 1. 3 :0 2 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. 3:02 p.m. Chair Neubauer called the Planning Board meeting to order.
- 1. All uses allowed in the LI zoning category.
- 1. All uses allowed in the LI zoning category.
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. Conform to the industrial performance standards as specified in chapter 12, article V of the
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. First Non-Appearance. The Planning Board shall continue the matter once, to the next
- 1. Not degrade the established level of services in the Comprehensive Plan or the minimum concurrency
- 1. Not degrade the established level of services in the Comprehensive Plan or the minimum concurrency
- 1. Single-family detached dwellings on individual parcels;
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.60 (or 60%) of the total parcel
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- 1. The impervious surface ratio (ISR) shall be no greater than 0.80 of the total parcel area.
- 1. Transitional community residences.
- 10. Distribution Easement granted to Gulf Power Company, a corporation, recorded July 2, 1991 in Official
- 11. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 12. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- 13. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- 14. Underground Easement granted to Florida Power & Light Company, recorded April 17, 2024 in Official
- 15. Underground Easement granted to Florida Power & Light Company, recorded January 15, 2025 in
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 16. Underground Easement granted to Florida Power & Light Company, recorded January 15, 2025 in
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 17. Underground Easement granted to Florida Power & Light Company, recorded January 31, 2025 in
- Utilities (Sub)
- Electrical
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 18. Dedication and any other relevant matters as shown on the plat of Keith's Fourth Addition to Panama
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- Government Authority
- 19. Underground Easement granted to Florida Power & Light Company, recorded January 9, 2025 in
- General Contractor
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Engineering & Architecture
- Real Estate Development
- 2. Family community residences that comply with the standards specified in section 110-9.A.
- 2. Family community residences that do not comply with the standards specified in section 110
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. Have a density no greater than ten dwelling units to the acre.
- 2. In harmony with the general intent of the Comprehensive Plan. (Goals listed as applicable.)
- 2. In harmony with the general intent of the Comprehensive Plan. (Goals listed as applicable.)
- 2. Provide off-street parking as specified in chapter 108.
- 2. Provide off-street parking as specified in chapter 108.
- 2. Scrap processing.
- 2. Scrap processing.
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- Legal Services
- 2. Second Non-Appearance. If the Applicant or authorized representative fails to appear at
- 2. The floor area ratio shall not exceed 0.85.
- 2. The floor area ratio shall not exceed 0.85.
- 3. All structures shall have a maximum height limitation of 35 feet
- 3. All structures shall have a maximum height limitation of 35 feet
- Construction (Other)
- Engineering & Architecture
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation
- 3. All structures shall have a maximum height limitation of 35 feet above base flood elevation
- 3. Announcements – Disclosures (as applicable) : None .
- 3. Announcements – Disclosures (as applicable): None.
- 3. Landscaping and buffering is required as specified in chapter 107.
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Landscaping & Lawn Service
- Waste Management
- 3. Landscaping and buffering is required as specified in chapter 107.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 3. No maximum height.
- 3. No maximum height.
- 3. Not exceed traffic limitations, create a fire hazard, or a hazard to the public health, welfare and safety.
- 3. Not exceed traffic limitations, create a fire hazard, or a hazard to the public health, welfare and safety.
- 3. Public and private schools grades K—12.
- 3. Recycling centers.
- 3. Recycling centers.
- 4. Any industrial, manufacturing, distribution, storage or warehousing use which is otherwise
- 4. Any industrial, manufacturing, distribution, storage or warehousing use which is otherwise
- 4. Compatible with adjacent land uses and districts, and not create a potential nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Compatible with adjacent land uses and districts, and not create a potential nuisance.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- 4. Complete a compatibility analysis of the proposed use with the existing adjacent uses and the
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Business Consulting
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Minimum setbacks shall be:
- 4. Public or noncommercial private recreation.
- 5. Accessory uses or structures as set forth in chapter 110.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Have a minimum lot size of 5,000 square feet.
- Real Estate Development
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- 5. Have a minimum lot size of 5,000 square feet.
- 5. Heavy industrial uses shall not be located adjacent to any zoning category that allows for
- 5. Heavy industrial uses shall not be located adjacent to any zoning category that allows for
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Quasi-judicial Proceedings: Chair Neubauer described the procedures for public hearings as shown on the
- 5. Residential Future Land Use Category
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Concrete & Masonry
- Drywall & Insulation
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 5. Residential Future Land Use Category
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Carpentry & Cabinetry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Have a minimum lot frontage of:
- 6. Industrial Land Use Category
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- 6. Industrial Land Use Category
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 6. Public utilities customarily found in residential areas;
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 6. Requests :
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 6. Requests:
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 7. Easement granted to the City of Panama City, Florida, a Florida municipal corporation, recorded May
- 7. Family day care homes pursuant to F.S. § 125.0109.
- 7. Non-Action Item(s) : Non e
- 7. Non-Action Item(s): None
- 8. Distribution Easement granted to Gulf Power Company, a corporation, recorded November 24, 1981 in
- Utilities (Sub)
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- 9. INTENTIONALLY DELETED (moved to Requirement 14)
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as HI.
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- A. The following bulk regulations shall apply to property zoned as R-1:
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in HI zoning districts; all other uses are prohibited.
- B. The following uses are allowed in the R-1 zoning district; all other uses are prohibited.
- C. Additional requirements:
- C. Additional requirements:
- C. The following uses are allowed as a conditional use in the R-1 zoning district:
- D. Additional requirements:
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- I. Public Hearing announced. Introduction of Application by Staff
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- II. Ex -parte communication disclosure by Board members.
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- III. Identification of Applicant and Affected Parties* that intend to participate in the hearing
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- IX. Rebuttal by Applicant and or Staff (if necessary). (15 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- V. Applicant ’s presentation of witnesses* or other evidence. (10 minutes)
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VI. Affected Parties ’ statement of standing, presentation of witnesses* or other evidence. (5
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- VII. Staff’s presentation of witnesses** or other evidence. (10 minutes)
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- X. Close of Evidence and Public Hearing. Deliberation and action by the Board.
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. June 8 , 2026 minutes
- a. June 8, 2026 minutes
- b. July 13 , 2026 minutes
- b. July 13, 2026 minutes
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- i. 20 feet from the front parcel line
- i. 20 feet from the front parcel line
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. No less than 25 feet from any property line at the perimeter of the zoning category
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- i. square or rectangular lot: 50 feet
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. 20 feet from the rear parcel line
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. Industrial uses adjacent to lands designated as Industrial on the Future Land Use Map
- ii. corner: 60 feet
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- ii. corner: 60 feet
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- ii. corner: 60 feet
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. 7 feet from the side parcel lines
- iii. cul-de-sac or corner: 20 feet
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
- iv. 10 feet from road side on corner lots
Follow this across meetings
Board
Planning BoardApplicants and firms
- Kurtis Adams; Mickey Hall; Brad Harris; USA Building Restoration LLC (Alejandro Martin); Tim Clark; Jeffrey Driggers
- Mickey Hall
- Mickey Hall (carport); Jason Oakes (owner) and Brad Harris (applicant) for 551 E 6th Street; Valentinos LLC (owner) and USA Building Restoration, LLC (Alejandro Martin) (applicant) for 2913 E 5th Court
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, gratis por 7 días. Sin tarjeta de crédito.
Comienza tu prueba gratis