Browse City of Pensacola civic records
Every published record for City of Pensacola, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
2,592 records
1. SOIL SHOULD BE NUTRIENT -RICH, MOISTURE CONTAINING PLANTING MEDIUM & BE A MINIMUM 18" DEPTH FOR SEASONALS, PERENNIALS & SMALL SHRUBS; MINIMUM 36" DEPTH FOR ALL TREES. 2. A LAYER OF RIVER ROCK SHALL BE PLACED IN THE BASE OF EACH PLANTER POT TO A MINIMUM 6" DEPTH OR AS ALLOWABLE BY REQUIRED SOIL DEPTH. PLACE FILTER FABRIC BETWEEN SOIL MEDIUM & RIVER ROCK & SOIL MEDIUM & PLANTER EDGES. OVERLAP FABRIC 6" MINIMUM TO MINIM IZE SOIL WASH. 3. PLANTERS POTS WHICH DO NOT RECEIVE IRRIGATION SHALL BE HAND -WATERED. HAND WATERING SHOULD OCCUR MINIMUM 2 TIMES PER WEEK DURING COOLER & RAINY SEASONS & INCREASED TO EVERY 2 -3 DAYS DURING HOT/DRY WEATHER. ALWAYS CHECK SOIL 6" BELOW SURFACE FOR SATURATION PRIOR TO WATERING TO PREVENT OVERWATERING/DROWNING OF PLANT MATERIAL. 4. WHEN APPLICABLE, PLANTS TO REMAIN IN CONTAINERS FOR DURATION OF SEASON ARE SHOWN IN THE "PERMANENT" LAYOUT. EACH SEASON WILL HAVE ITS OWN PLANT MATERIAL, SOME OF WHICH MAY LAST ALL YEAR. ROTATE IN THE PLANTS NOTED FOR EACH SEASON. 5. IF PLANT MATERIAL DIES DURING A SEASON & IS EXPECTED TO REMAIN FOR AN ADDITIONAL SEASON, CONTRACTOR IS TO REPLACE AT TIME OF NEXT SEASONAL ROTATION. 6. CONTACT LANDDESIGN FOR ANY REQUIRED SUBSTITUTIONS. 7. ALL PLANTS SHOULD BE FULL AT TIME OF INSTALLATION & COVER 75% OF POT SURFACE AREA. 8. AVOID PLANTING IN THE ROOT ZONE OF ANY PERMANENT TREES, SHRUBS, OR PERENNIALS. 9. SEASONAL PLANTS SHOULD BE REMOVED FOLLOWING THE FIRST MAJOR FROST DIEBACK & REPLACED WITH EVERGREEN BOUGHS OR OTHER OWNER APPROVED WINTER DECOR. TREES, SHRUBS & PERENNIALS SHOULD REMAIN IN THE CONTAINERS YEAR ROUND & REPLACED ONLY AS NECESSARY.
This agenda item outlines proposed landscaping and planter box specifications for a project in Pensacola. The plan details requirements for soil depth, including 18 inches for seasonal plants and shrubs, and 36 inches for trees. It also specifies the use of river rock at the base of planter pots, with filter fabric to prevent soil wash. Planters without irrigation will require regular hand watering, with frequency adjusted based on weather conditions. Seasonal plants will be rotated, and any that die during a season will be replaced. The project is currently under review by the Planning Board. This project will involve site preparation for planters, including excavation and soil placement, as well as ongoing horticultural services for plant rotation and maintenance. Contractors specializing in landscaping, irrigation, and horticultural supply could find opportunities. Early engagement is advised before final site plans and permits are established.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
1. STAKE PER SPOT ELEVATIONS & NOTED SLOPES. CONTOURS ARE PROVIDED FOR MASS GRADING/INTENT ONLY. 2. WRITTEN DIMENSIONS & GRADES PREVAIL OVER SCALED DIMENSIONS. NOTIFY LANDDESIGN OF ANY DISCREPANCIES. 3. ALL SPOT ELEVATIONS SHOWN ON GRADING PLAN ARE TO BOTTOM OF CURB/TOP OF PAVEMENT UNLESS OTHERWISE NOTED. ALL RIM ELEVATIONS ARE TO EDGE OF PAVEMENT. 4. REFER TO GEOTECHNICAL ENGINEER & GEOTECH REPORT FOR INFORMATION ON SUBSURFACE MATERIALS, TOPSOIL, STRUCTURAL MATERIAL, DEEP FILLS, EXCAVATION, & FOUNDATIONS. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 6. IN ORDER TO ASSURE PROPER DRAINAGE, KEEP A MINIMUM OF .5% SLOPE ON THE CURB. 7. ALL PLANTING ISLANDS SHALL BE GRADED TO MOUND TO PROVIDE POSITIVE DRAINAGE. 8. CONTRACTOR TO VERIFY 2% MAX. CROSS -SLOPE ON ALL SIDEWALKS. 9. CONTRACTOR TO VERIFY THAT ALL SIDEWALK SLOPES, HANDICAP RAMPS, & HANDICAP PARKING SPACES MEET ADA REQUIREMENTS. 10. CONCRETE SIDEWALKS ADJACENT TO TREE SAVE LOCATIONS SHOULD BE POURED ON TOP OF EXISTING GRADE. 11. REFER TO LANDSCAPE PLAN FOR ALL TREE PROTECTION FENCE LOCATIONS & INSTALLATION PROCEDURES. BEFORE GRADING/CONSTRUCTION BEGINS, CALL FOR INSPECTION OF TREE PROTECTION BARRICADES. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL PITS, TRENCHING, OR OTHER LAND DISTURBING ACTIVITY ALLOWED IN THE TREE PROTECTION ZONE. 12. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY & ARE NOT TO BE USED TO LAYOUT FOOTINGS. 13. GRADING CONTRACTORS SHALL NOTIFY & COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTORS SHALL PAY ALL COSTS IN CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. CONTRACTORS SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES AS REQUIRED TO MATCH FINISHED GRADES. 14. GRADING CONTRACTOR SHALL COOPERATE & WORK WITH ALL OTHER CONTRACTORS PERFORMING WORK ON THIS PROJECT TO INSURE PROPER & TIMELY COMPLETION OF THIS PROJECT.
This agenda item concerns a planned development project in Pensacola, Escambia. The project involves site grading, drainage, and paving, with specific attention to spot elevations, slopes, and curb details. It requires adherence to geotechnical reports for subsurface materials and foundations, and mandates proper drainage with a minimum 0.5% slope on curbs. The plan also details requirements for planting islands, sidewalk slopes, and handicap accessibility, along with strict protocols for tree protection zones. Contractors will need to coordinate with utility companies for any necessary relocation or adjustment of facilities. The project is currently under review by the Planning Board, indicating an early stage in the development process. This will likely involve site clearing and grading, underground utility work, concrete and paving for sidewalks and curbs, and final landscaping. Local contractors, suppliers, and service providers in site preparation, concrete, paving, utility coordination, and landscaping could find opportunities by engaging early before final plans and permits are issued.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
1. Signs. Refer to sections 12-5-2 and 12-5-3 for general sign regulations and for a description
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
1. Single-family residential (attached or detached) at a maximum density of 17.4 units per
The City of Pensacola Planning Board is reviewing a proposal for a new residential development. This project is planned for an area that is currently undeveloped or has a different zoning. The proposal includes options for single-family homes at a density of up to 17.4 units per acre, and multifamily housing at a density of up to 100 dwelling units per acre. This item is currently under review, meaning it is in the early stages of the public process. If approved, the project would involve site preparation, grading, and utility work, followed by the construction of residential structures. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project developers. Reaching out now, before final plans and permits are issued, allows businesses to understand the project's scope and potentially secure future work.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
1. Site planning. The integration of site features such as building arrangement, landscaping
This item concerns site planning for a new development. The Planning Board will review how building placement, landscaping, and parking areas are arranged to create a functional environment. While no specific project details like an address or size are provided, the review process focuses on integrating these site features. This stage is early in the public process, as it is under review. The work that will eventually be set in motion could include site clearing and grading, underground utility work, paving, and final landscaping. Contractors, suppliers, and service providers in site preparation, civil engineering, landscaping, and material supply could find opportunities. Engaging early, before detailed site plans and permits are finalized, offers the best chance to compete for future work.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
1. THE PLANS AND DRAWINGS ARE DIAGRAMMATIC OF THE WORK TO BE PERFORMED. SOME COMPONENTSMAY BE SHOWN OUTSIDE THE WORK AREA FOR CLARITY. THE WORK SHALL BE EXECUTED IN A MANNERTO AVOID CONFLICTS WITH UTILITIES AND OTHER ELEMENTS OF CONSTRUCTION, INCLUDINGLANDSCAPE MATERIALS. ALL DEVIATIONS FROM THE PLANS SHALL BE APPROVED BY THE OWNER'SREPRESENTATIVE BEFORE BEING INSTALLED.2. THE IRRIGATION SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE PLANS, IRRIGATION SYSTEMSPECIFICATIONS AND ALL CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COMPLY WITH ALLCURRENT LOCAL CODES, ORDINANCES, AND REGULATIONS.3. CONTRACTOR SHALL PROVIDE COMPLETE AND ACCURATE IRRIGATION AS-BUILT DRAWINGS TO THEOWNER AT PROJECT COMPLETION, SHOWING ALL FINAL ROUTING OF MAINLINES, VALVES, CONTROLWIRE, AND EQUIPMENT LOCATIONS.4. ALL IRRIGATION MAINLINE AND LATERAL LINES ARE TO NOT EXCEED A VELOCITY OF 5FPS.5. THE CONTRACTOR SHALL NOT WILLFULLY INSTALL ANY ASPECT OF THE IRRIGATION SYSTEM AS SHOWNON THE PLANS AND DRAWINGS, WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADEDIFFERENCES, OR DISCREPANCIES EXIST THAT MIGHT NOT HAVE BEEN KNOWN DURING THE DESIGN OFTHE IRRIGATION SYSTEM. IN THE EVENT THAT NOTIFICATION OF THE CONFLICT IS NOT APPROVED BY THEOWNER'S REPRESENTATIVE, THE CONTRACTOR WILL ASSUME FULL RESPONSIBILITY FOR ALL REVISIONS.6. REFER TO THE LANDSCAPE PLANS WHEN TRENCHING TO AVOID TREE ROOT BALLS WHEN INSTALLINGIRRIGATION EQUIPMENT. CALL 811 AND REFER TO UTILITY PLANS PRIOR TO TRENCHING.7. IRRIGATION CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, INCLUDING UTILITY LOCATIONS BEFOREINSTALLATION OF THE IRRIGATION SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATINGINSTALLATION WITH ALL OTHER CONSTRUCTION ON SITE, ESPECIALLY LANDSCAPE INSTALLATION. THEIRRIGATION SYSTEM SHALL BE RELOCATED AT NO ADDITIONAL COST FOR ANY CONFLICT WITHLANDSCAPE INSTALLATION OR ANY OTHER SITE CONSTRUCTION OR EXISTING CONDITIONS.8. VERIFY THE REQUIRED MINIMUM STATIC WATER PRESSURE IS AVAILABLE AT THE PROJECT SITE PRIOR TOBEGINNING THE IRRIGATION INSTALLATION. NOTIFY THE IRRIGATION DESIGN CONSULTANT ANDLANDSCAPE ARCHITECT IN WRITING IF THE MINIMUM STATIC WATER PRESSURE OR WATER VOLUME ISNOT AVAILABLE. SEE PLAN SHEET FOR REQUIREMENTS.9. WHERE EXISTING OR NEW TREES, LIGHT FIXTURES, SIGNS, ELECTRONIC CONTROLLERS AND/OR OTHEROBJECTS ARE AN OBSTRUCTION TO AN IRRIGATION SPRINKLER'S PATTERN, THE COMPONENT AND PIPINGSHALL BE RELOCATED AS NECESSARY TO OBTAIN PROPER COVERAGE OF AN IRRIGATION SPRINKLER'SPATTERN. THE COMPONENT AND PIPING SHALL BE RELOCATED AS NECESSARY TO OBTAIN THE PROPERCOVERAGE WITHOUT DAMAGING THE OBSTRUCTION.10. IRRIGATION CONTRACTOR SHALL ADJUST ALL SPRINKLERS TO AVOID OVER SPRAY ONTO IMPERVIOUSAREAS.11. ALL MATERIALS AND EQUIPMENT SHOWN SHALL BE NEW AND INSTALLED AS SHOWN ON THE PLANS. IFTHE DRAWINGS DO NOT THOROUGHLY DESCRIBE THE TECHNIQUES TO BE USED, THE INSTALLER SHALLFOLLOW THE INSTALLATION METHODS AND INSTRUCTIONS RECOMMENDED BY THE PRODUCTMANUFACTURER.12. THE LOCATION OF THE IRRIGATION MAINLINE SHALL BE IDENTIFIED IN THE FIELD AND APPROVED BY THEOWNER'S REPRESENTATIVE BEFORE INSTALLATION.13. CONTRACTOR IS TO SUBMIT PRODUCT SPECIFICATION SHEETS FOR ALL IRRIGATION EQUIPMENT TO BEUSED FOR APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.14. THE QUANTITIES SHOWN IN THE LEGEND SHEETS SHALL NOT BE USED FOR BIDDING PURPOSES. THECONTRACTOR WILL BE RESPONSIBLE FOR CONDUCTING A COMPREHENSIVE MATERIALS TAKEOFF TODETERMINE THE ACTUAL QUANTITIES OF MATERIAL NECESSARY TO EXECUTE THE WORK DESCRIBED INTHE DOCUMENTS.15. ALL TRENCHES SHALL BE BACKFILLED WITH CLEAN DEBRIS-FREE MATERIALS.16. IRRIGATION CONTRACTOR IS TO INSTALL CHRISTY ZONE TAGS WITH THE CORRESPONDING CONTROLLERZONE NUMBER AT EACH CONTROL VALVE.17. AS BUILT DOCUMENTS ARE TO BE PROVIDED TO THE OWNER UPON COMPLETION OF THE PROJECT. THEMAINLINE, CONTROL VALVES, ISOLATION VALVES, GROUND RODS AND SPLICE BOXES SHALL BE LOCATEDWITH A MEASUREMENT FROM TWO FIXED POINTS.18. IRRIGATION CONTRACTOR SHALL SECURE ANY AND ALL NECESSARY PERMITS FOR THE WORK PRIOR TOCOMMENCEMENT OF ON-SITE OPERATIONS.19. A MAINLINE PRESSURE TEST IS TO BE CONDUCTED BEFORE BACKFILLING. ALL FINDINGS ARE TO BEREPORTED TO THE LANDSCAPE ARCHITECT WITHIN TWENTY FOUR HOURS POST TEST.20. ALL SLEEVES ARE TO BE TWO TIMES THE SIZE OF THE PIPE IT ENCASES. INSTALL A 2" SLEEVE NEXT TOTHE MAINLINE SLEEVE FOR CONTROL WIRES.21. ROUTE A 1.5" ELECTRICAL CONDUIT FROM THE CONTROLLER TO THE MAINLINE TRENCH FOR THECONTROL WIRES. RUN THE CONDUIT AND CONTROL WIRES PARALLEL TO THE MAINLINE.22. THE IRRIGATION SYSTEM IS TO BE INSPECTED AND APPROVED BY THE PROJECT OWNER PRIOR TORECEIVING CERTIFICATION.23. ANY PRODUCT SUBSTITUTIONS MADE BY THE IRRIGATION CONTRACTOR ARE TO BE REVIEWED ANDAPPROVED BY THE OWNER PRIOR TO INSTALLATION.
This civic agenda item concerns plans for an irrigation system installation. The project involves installing mainline and lateral irrigation lines, including drip tubing, control wires, valves, and controllers. Work will include trenching, pipe installation, flushing systems, pressure testing, and backfilling trenches. The project requires coordination with other site construction and existing conditions. The plans are diagrammatic, and all deviations must be approved by the owner's representative. The contractor must comply with all local codes and ordinances. This item is currently under review by the Planning Board. Contractors specializing in irrigation system installation, site preparation, underground utilities, and related material supply could find opportunities. Early engagement is advised before final bids and permits are settled.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
10. ALL CONSTRUCTION JOINTS SHALL BE SAWN, CONCRETE FINISHES TO BE PER DRAWING DETAILS & SPECIFICATIONS. 11. CONCRETE SHALL BE BROOM FINISHED & CURED FOR A MINIMUM OF 72 HOURS UNLESS NOTED OTHERWISE. 12. BREAKOUTS FOR REMOVAL OF EXISTING PAVEMENT & CURBS SHALL BE MADE BY FULL DEPTH SAW CUT WHEN ADJACENT TO PROPOSED PAVEMENT &/OR CURBS. 13. PROPOSED PAVEMENT &/OR CURBS INTENDED TO TIE INTO EXISTING SHALL MATCH SHALL MATCH THE ELEVATION OF EXISTING PAVEMENT &/OR CURBS. 14. CONTRACTOR SHALL REFER TO THE SITE CIVIL, MEP & IRRIGATION PLANS FOR CONDUIT TO BE INSTALLED UNDER PAVEMENT PRIOR TO COMMENCING PAVEMENT SUBGRADE PREPARATION. 15. ALL TESTING SHALL BE PERFORMED BY A QUALIFIED TESTING LABORATORY, EMPLOYED & PAID DIRECTLY BY THE OWNER. TESTING SHALL BE PERFORMED, AT A MINIMUM, IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT. IN THE EVENT THE RESULTS OF THE INITIAL TESTING DO NOT COMPLY WITH THE PLANS & THE SPECIFICATIONS, SUBSEQUENT TEST NECESSARY TO DETERMINE THE ACCEPTABILITY OF CONSTRUCTION SHALL BE AT THE CONTRACTOR'S EXPENSE. PAVEMENT FOUND TO BE DEFICIENT IN STRENGTH OR THICKNESS SHALL BE REMOVED & REPLACED SOLELY AT THE EXPENSE OF THE CONTRACTOR.
This agenda item outlines construction specifications for a project involving pavement and curb work. It details requirements for concrete finishes, broom finishing, curing times, and saw cutting for pavement removal and tie-ins. The project also requires the installation of conduits under pavement according to civil, MEP, and irrigation plans. Testing will be performed by a qualified laboratory paid by the owner, with the contractor responsible for costs if initial testing fails or if pavement is deficient. This item is currently under review by the Planning Board Meeting, City of Pensacola, Escambia. The scope of work involves site preparation, concrete and paving, underground utility work for conduits, and potentially demolition of existing pavement and curbs. Contractors specializing in site prep, grading, concrete, paving, and underground utilities may find opportunities. Early engagement before final bid and permit stages could be advantageous.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
10. Sidewalks. Developers of new construction or redevelopment projects shall repair,
The City of Pensacola Planning Board is reviewing a new requirement for developers. This rule states that new construction or redevelopment projects must repair, reconstruct, or build new sidewalks. This applies to all sides of a property that face a street. This item is currently under review by the Planning Board. If approved, this could lead to work involving site preparation, concrete and paving, and final landscaping for new or improved sidewalks. Local contractors, suppliers, and service providers should monitor this item as it moves through the review process. Early engagement could provide an advantage as project details and permit requirements are finalized.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
11. Consideration of floodprone areas. Portions of the district are within the 100-year
This item concerns floodprone areas within the City of Pensacola. Portions of a district are identified as being within the 100-year floodplain. Site planning for any future development in these areas must take into account the specific requirements for floodprone locations. This matter is currently under review by the Planning Board. The work that could be set in motion involves careful site planning and design to address flood risks, potentially including specialized grading, drainage systems, and construction methods. Early engagement with planning consultants, civil engineers, and landscape architects is advised, as these professionals can help navigate the specific site planning considerations for floodprone areas before detailed plans and permits are finalized.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
12. Storm drainage. Adequate storm drainage must be provided to prevent flooding or erosion.
This item concerns proposed storm drainage requirements for future development within the City of Pensacola. The Planning Board will review guidelines ensuring adequate storm drainage to prevent flooding and erosion, with the goal that post-development surface drainage does not exceed pre-development levels. The city engineer may allow flexibility based on nearby systems, topography, and natural drainage patterns. This review is planned for the April 14, 2026, Planning Board Meeting. While no specific project is detailed, this agenda item signals a need for contractors and suppliers involved in stormwater management, site preparation, grading, and utility work to be aware of upcoming regulations and potential project requirements. Engaging early with the city or developers as projects emerge could provide an advantage in understanding and meeting these drainage standards.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
13. All mechanical equipment, satellite dishes and other similar equipment should be
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
14. Exemptions. All detached single-family and duplex residential development proposals are
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
2. 26-467 REQUEST FOR VACATION OF ALLEYWAY - 2907 E. BLOUNT STREET
The City of Pensacola Planning Board is reviewing a request to vacate an alleyway located at 2907 E. Blount Street. This request is currently under review by the city. If approved, the vacation of the alleyway could lead to changes in property use and access in that specific area. This process typically involves legal review and public notification before any final decisions are made. Businesses involved in legal services, property management, and potentially construction or surveying related to adjacent properties might be impacted. Early engagement with the city or the applicant could provide insights into potential future needs or opportunities related to this property.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- 2907 E. Blount Street
2. 26-467 REQUEST FOR VACATION OF ALLEYWAY - 2907 E. BLOUNT STREET
The City of Pensacola Planning Board is reviewing a request to vacate an alleyway located at 2907 E. Blount Street. This request is currently under review by the Planning Board. If approved, the vacation of the alleyway would likely involve site surveying and legal documentation. This early stage in the process presents an opportunity for local contractors, suppliers, and service providers to engage with the project. Understanding the project's details now, before final plans and permits are issued, allows businesses to prepare and potentially secure future work related to any development that may follow this land use change.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- 2907 E. Blount Street
2. 2907 E. Blount Street_Application and Materials
A proposal is under review for a property located at 2907 E. Blount Street in Pensacola. The application and supporting materials for this project are currently being considered. While specific details about the proposed use or size are not yet available, the review process suggests potential for future development. This stage typically involves site assessment, design, and planning. As the project moves forward, it could lead to work such as site preparation, utility connections, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early in the process, before final plans and permits are issued, offers an advantage in understanding potential needs and competing for future work.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- 2907 E. Blount Street
2. A TRUNK DIAMETER OF 12 INCHES TO 19 INCHES = THREE THREE -INCH DBH TREES PLANTED FOR EACH ONE REMOVED.
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
2. Architectural design and building elements.
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
2. December 2025 Materials
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
2. Home occupations, subject to regulations in section 12-3-13.
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
2. Off-street parking. The following off-street parking requirements shall apply to all lots,
Planning Board Meeting listed this item on its agenda for 2026-04-14 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-04-14
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta