Browse City of Titusville civic records
Every published record for City of Titusville, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,913 records
1. The alternative standards promotes flexibility and environmental soundness in layout and
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To allow a sanitary sewer force main to be two (2) inches less
This item concerns a request to allow a sanitary sewer force main to be two inches smaller than the city's standard four-inch minimum diameter. The request is currently under review by the Development Review Committee of the City of Titusville, Brevard. If approved, this could involve work related to utility infrastructure, potentially including installation or modification of sewer lines. Businesses involved in utility construction, plumbing, and related supply could find opportunities. Early engagement with the city or applicant may provide insight into the project's specific needs and timeline.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To remove three (3) heritage trees per Section 30-32 (e) Criteria for Removal
A commercial project is currently under site plan review by the Development Review Committee of the City of Titusville. The project involves a request to remove three heritage trees. This project is in the early stages of review, meaning site plans and permits are not yet finalized. The work will likely involve site clearing and grading to prepare the land for new construction. Following site preparation, there will be underground utility work, followed by the construction of commercial buildings. The project presents an opportunity for local contractors, trades, suppliers, and service providers. Reaching out now, before final site plans, bids, and permits are issued, allows businesses to get involved early in the process.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To the criteria specified in the City’s Transportation Infrastructure Technical Design
A 48-unit condominium project is currently under site plan review by the Development Review Committee of the City of Titusville. The project is proposed on a property located within the City. This review involves assessing the development against the City’s Transportation Infrastructure Technical Design Manual, specifically criteria for minimum parking space dimensions. The project is in the early stages of review, meaning site plans and permits are not yet finalized. This early stage presents an opportunity for contractors, suppliers, and service providers to engage. Work could eventually involve site preparation, utility installation, construction of the condominium structures, and final landscaping. Businesses specializing in general contracting, site prep, concrete, electrical, plumbing, HVAC, roofing, painting, flooring, and landscaping may find opportunities. Early engagement allows businesses to understand project needs before formal bidding processes begin.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To the criteria specified in the City’s Transportation Infrastructure Technical Design Manual
A restaurant redevelopment project is under review for the property at 1090 Garden Street. The applicant, Megan Broderick, is requesting a waiver to reduce parking space dimensions to 9 feet wide and 18 feet long, deviating from the City's Transportation Infrastructure Technical Design Manual. This project is currently in the Class 1 site plan review phase and has been presented to the Development Review Committee. The redevelopment would likely involve site preparation, utility work, and construction of the restaurant facility. The waiver approval is a key step before detailed site plans, bids, and permits are finalized. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs as it moves through the review process.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
- Address:
- 1090 Garden Street
- Applicant:
- Corey Jones
1. To the criteria specified in the City’s Water Resources Department Technical Specification
This item concerns proposed updates to the City of Titusville's Water Resources Department Technical Specification Section 5.20. The specification details minimum diameter requirements for sanitary sewer mains, stating that no sanitary sewer main conveying wastewater shall be less than eight inches in diameter, and no City-owned force main shall be less than four inches in diameter. This is currently under review by the Development Review Committee. The review process will likely involve discussions and potential revisions to these technical standards. This early stage presents an opportunity for contractors, suppliers, and service providers in the utility and construction sectors to engage with the city. Understanding these proposed specifications early can help businesses prepare for future projects that must adhere to these updated standards, potentially involving work on sanitary sewer and force main infrastructure.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To the minimum force main size requirements in the City’s Water Resources Department Technical
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
1. To the minimum force main size requirements in the City’s Water Resources Department Technical
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. Applicant/
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. Applicant/
This item concerns a planned development project at an unspecified location within the City of Titusville. The project is currently under review by the Development Review Committee. While specific details about the project's scope, size, or proposed use are not yet available, it represents an early stage in the civic process. Future phases will likely involve site preparation, utility work, construction, and landscaping. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress. Engaging early, before final plans and permits are issued, offers the best opportunity to compete for work as the project moves forward.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. The proposed new standards are appropriate to the proposed type of development; or
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. The proposed new standards are appropriate to the proposed type of development; or
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. The proposed new standards are appropriate to the proposed type of development; or
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. To allow more than the maximum number of parking spaces
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. To the criteria specified in the City’s Transportation Infrastructure Technical Design
This item concerns proposed changes to parking space limits within the City of Titusville, as outlined in Chapter 9, Section 9.16.4 of the Transportation Infrastructure Technical Design Manual. The Development Review Committee is reviewing these criteria. This review could lead to new regulations affecting future development projects. The scope of work would involve understanding and potentially implementing revised parking requirements. This process is currently under review, indicating an early stage in the civic agenda. Businesses involved in development, construction, and related services should monitor this review. Early awareness allows for proactive engagement as plans and permits are developed.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. To the criteria specified in the City’s Transportation Infrastructure Technical Design Manual Chapter 9
This item concerns the City of Titusville's Transportation Infrastructure Technical Design Manual, specifically Chapter 9, Section 9.16.4. This section sets rules for the maximum number of parking spaces allowed for new developments. The Development Review Committee is reviewing this criteria. This review could lead to changes in parking requirements for future projects. Businesses involved in site preparation, grading, paving, and construction trades may be impacted by any updated regulations. Understanding these potential changes early allows contractors, suppliers, and service providers to prepare for future development opportunities.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. To the criteria specified in the City’s Transportation Infrastructure Technical Design Manual Chapter 9
This item concerns the City of Titusville's Transportation Infrastructure Technical Design Manual, specifically Chapter 9, Section 9.16.4. This section sets rules for the maximum number of parking spaces allowed for new developments. The Development Review Committee is reviewing this criteria. This review could lead to changes in how parking is planned for future projects. Businesses involved in site planning, engineering, and construction may be affected by updated parking regulations. Early engagement with the city during this review period could provide valuable insight into potential future development requirements and opportunities.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
2. Warranty Deed
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
3. Applicant Status Owner Tenant Agent Other
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
3. Applicant Status Owner Tenant Agent Other
Development Review Committee listed this item on its agenda for 2026-06-16 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee
- Date:
- 2026-06-16
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta