Browse City of Titusville civic records
Every published record for City of Titusville, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,918 records
6: D
The City of Titusville Community Redevelopment Agency is reviewing a Bicycle and Pedestrian Amenities Strategic Plan. This plan proposes the addition of three Base Nodes, three Enhanced Nodes, and two Trail Hubs. It also suggests new bicycle trails along Broad Street and South Palm Avenue. The plan aims to improve shared rights-of-way and create civic waterfront areas. This strategic plan is currently under review, indicating an early stage in the public process. If approved, the project would involve site preparation, potential utility work, and the installation of new amenities and trails. This could lead to opportunities for general contractors, site preparation and grading services, landscape and lawn services, and suppliers of construction materials. Engaging early could provide businesses with an advantage before detailed site plans, bids, and permits are finalized.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- Broad St.
6: D
The Titusville Community Redevelopment Agency is reviewing plans for a complete bicycle and pedestrian amenities network. This project aims to enhance public spaces and improve access to recreation and transportation options. The plan includes proposed recommendations for street sections along Broad Street, S Palm Avenue, and South Street, which involve adding bike lanes, multi-modal trails, and sidewalks within existing right-of-way. This initiative is currently under review, with funding opportunities being explored. The project scope would likely involve site clearing, grading, underground utility work, paving for drive lanes and bike paths, sidewalk construction, and final landscaping. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's needs and potential opportunities before final bids and permits are established.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- Broad Street
6: D V K L Q
The Community Redevelopment Agency of Titusville is reviewing plans for the Uptown District. This area serves as a connection between the Civic Waterfront and the Downtown economic center. The project is currently under review. This initiative is expected to involve site clearing and grading, followed by underground utility work and paving. Subsequent phases may include vertical construction, mechanical and finish trades, and final landscaping. Local contractors, suppliers, and service providers are encouraged to engage early in the process, before site plans, bids, and permits are finalized, to understand potential opportunities.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- Uptown District
6: D V K L Q
This civic agenda item concerns a project located in Titusville. The project is currently under review. The scope of work is not detailed in the provided information. Local contractors, suppliers, and service providers are encouraged to monitor this item as it progresses through the public process. Early engagement before final plans and permits are established can offer a competitive advantage.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
6: D V K L Q J W R Q$ Y H
The Community Redevelopment Agency (CRA) of Titusville is reviewing plans to enhance the Downtown District's trail system. This project focuses on improving pedestrian and bicycle infrastructure along key corridors like Broad Street, Indian River Avenue, South Palm Street, and Main Street. The plan includes adding pedestrian-scale trail lighting, informational signage, formal trailhead locations, expanded multi-use paths, and additional bicycle support amenities. It also proposes purpose-built gathering spaces and better economic connections between trails and businesses. This initiative is currently under review, offering an early opportunity for contractors. The work could involve site preparation, installation of new lighting and signage, paving for paths, and landscaping. Local contractors, suppliers, and service providers in site prep, grading, concrete, electrical, lighting, signage, and landscaping could find opportunities by engaging with the CRA early in the planning process before bids and permits are finalized.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- Broad Street
6: D V K L Q J W R Q$ Y H
The Community Redevelopment Agency of Titusville is reviewing plans for the Midtown District, a key north-south corridor connecting the Downtown core to southern areas. This district is important for the CRA's bicycle and pedestrian network. The review is currently planned, indicating an early stage in the public process. This project is expected to involve significant infrastructure work, potentially including site clearing, grading, utility upgrades, and paving to enhance connectivity and the pedestrian and bicycle experience. Contractors specializing in site preparation, grading, concrete, paving, and utility work may find opportunities. Suppliers of construction materials and equipment could also be involved. Reaching out to the agency early in this review process could provide an advantage before specific plans, bids, and permits are finalized.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
6: D V K L Q J W R Q$ Y H
The Community Redevelopment Agency (CRA) is reviewing plans to improve the bicycle and pedestrian experience within the Historic Residential District. This area includes streets like Indian River Avenue and Riverside Drive. The project aims to enhance connectivity, user comfort, and safety while preserving the historic character of the neighborhood. Proposed improvements include adding pedestrian-scale lighting, updating wayfinding signage, installing additional seating, and expanding bicycle support infrastructure like racks and repair stations. The plan also calls for street trees and landscape treatments along key corridors. This initiative is currently under review, representing an early opportunity for contractors and suppliers. The work could involve site preparation, installation of lighting and signage, landscaping, and the placement of street furniture and bicycle amenities. Businesses specializing in civil construction, electrical work, landscaping, and the supply of street furniture and signage may find opportunities by engaging with the CRA early in the process, before final plans and bids are established.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- Indian River Avenue
6: D VKLQJ
The Community Redevelopment Agency (CRA) of Titusville is reviewing findings on pedestrian and bicycle amenity gaps within the CRA boundary. The review confirms a strong pedestrian framework and regional trail connections but notes uneven distribution of amenities like benches, lighting, and trash receptacles. Key gaps exist in trailheads, informational signage, shade, water access, bicycle repair stations, and activity nodes. The proposed plan aims to address these gaps by creating a distributed network of Base Nodes, Enhanced Nodes, and Trail Hubs across all districts. This project is currently under review. Work could involve site preparation, installation of various amenities such as benches, lighting, signage, and gathering spaces, and potentially landscaping. Contractors, suppliers, and service providers in site prep, general construction, electrical, plumbing, and landscaping could find opportunities. Early engagement is advised as plans and permits are developed.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
- Address:
- CRA boundary
7. Staff working with Zero Empty Spaces to fill vacancies downtown.
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
8. Staff currently working with Titusville Area Chamber of Commerce and Special
The Community Redevelopment Agency and the City of Titusville are exploring options for hosting more events in the downtown area at the Welcome Center. This initiative is currently being discussed with the Titusville Area Chamber of Commerce and the Special Events Department. While no specific project details like size or scope have been finalized, the focus is on increasing event activity. This early stage means potential opportunities for businesses involved in event planning, setup, and management. Contractors, suppliers, and service providers who can support event logistics, such as temporary structures, A/V equipment, catering, or staffing, may find future work. Engaging now allows businesses to understand the developing plans and position themselves for upcoming needs before formal bids are released.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
9. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
9. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
9. Trail Town Amenities Strategic Plan – The draft plan is on the CRA Agenda for
The Community Redevelopment Agency of Titusville is reviewing a draft Trail Town Amenities Strategic Plan. This plan is currently under review by agency staff, who are providing comments to Kimley Horn. The plan aims to guide the development of amenities related to a trail system. Future phases could involve design, permitting, and construction of various public amenities. Local contractors, suppliers, and service providers should monitor this project's progress. Engaging early could provide an advantage as the plan moves toward potential implementation and bidding.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. A moment of silence will be held.
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. A moment of silence will be held.
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. Executive Director's Report April 14, 2026
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. Executive Director's Report April 14, 2026
Community Redevelopment Agency listed this item on its agenda for 2026-04-14 in City of Titusville. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. FY 2027 Community Redevelopment Agency Preliminary Budget
This item concerns the preliminary budget for the Titusville Community Redevelopment Agency for Fiscal Year 2027. The Community Redevelopment Agency is seeking direction from staff on this budget. This is an early stage in the planning process, as the budget is still in its preliminary phase. The work that will eventually be funded by this budget is not yet defined, but it will likely involve various redevelopment projects within the agency's jurisdiction. These projects could include site preparation, construction, infrastructure improvements, and related services. Local contractors, suppliers, and service providers are encouraged to monitor future updates as the budget and specific projects are further developed. Engaging early can provide an advantage as plans and opportunities become clearer.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. FY 2027 Community Redevelopment Agency Preliminary Budget
This item concerns the preliminary budget for the Titusville Community Redevelopment Agency for Fiscal Year 2027. The Community Redevelopment Agency is seeking direction from staff on this budget. This is an early stage in the planning process for the agency's upcoming fiscal year. The budget will guide future projects and expenditures. Local contractors, suppliers, and service providers should monitor this process for potential future opportunities as specific projects are defined and funded. Engaging early can provide an advantage as plans develop.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
A. Max Brewer Memorial Parkway corridor, which collectively
The Community Redevelopment Agency of Titusville is reviewing plans for improvements along the Max Brewer Memorial Parkway corridor. This area is identified as a critical hub for trail-based tourism and recreation, connecting to the regional trail network and the Indian River Lagoon. The proposed work focuses on enhancing existing amenities and mobility infrastructure, including multi-use trails, walking paths, trailheads, crosswalks, and bicycle facilities. User comfort and safety will be addressed through upgrades to lighting, signage, drinking fountains, restrooms, and picnic areas. The project aims to bolster placemaking features like public art and community spaces, potentially including a splash pad, BMX track, skate park, dog park, playground, and improved water access. This review stage means that planning and design work is underway, with potential for future construction phases involving site preparation, utility work, paving, and installation of various recreational and safety features. Local contractors, trades, suppliers, and service providers in site preparation, concrete, electrical, plumbing, landscaping, and general construction could find opportunities by engaging early in the process before final plans and bids are established.
- Board:
- Community Redevelopment Agency
- Date:
- 2026-04-14
- Type:
- Agenda_item
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta