Agenda
Planning and Zoning Commission · 2026-06-03 · agenda
The Titusville Planning and Zoning Commission met on June 3, 2026. The commission considered Conditional Use Permit (CUP) No. 9-2025 for Parcel ID # 21-35-28-00-279 to allow a convenience store within the Community Commercial (CC) zoning district. The commission also considered approving an aerospace and light manufacturing ordinance, which is a legislative item scheduled for a City Council public hearing on June 9, 2026. Meeting minutes from May 20, 2026, were also up for approval. Public comment procedures were outlined, with speakers for, against, and general comments heard in sequence, followed by applicant rebuttal.
Agenda items
- 1. 05.20.26 Minutes Draft P&Z.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Aerospace_Manufacturing_Ord Ver4
- 1. All property lines and easements
- 1. Approve the CUP as presented.
- 1. Complete Application and Fees
- 1. I am the owner and/or legal representative of the owner of the property described, which is the
- 1. Project Information
- 1. Staff Report CUP #9-2025 - 2.0
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- 10. Owner authorization
- 10. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- 10. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- 11. 04 - (CUP) - CONDITIONAL USE PERMIT_TITUSVILLE - Signed
- 11. Check other
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Carpentry & Cabinetry
- Drywall & Insulation
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 12. ALTA Survey
- 12. Narrative
- 13. AS TO TABLE A OPTIONAL ITEM 13, THE NAMES OF ADJOINING PARCEL OWNERS ARE SHOWN ON THIS MAP.14 AS TO TABLE A OPTIONAL ITEM 14, THE DISTANCE TO THE NEAREST INTERSECTING STREET ON DAIRY ROAD ISAPPROXIMATELY 365' SOUTHWEST OF THE NORTHWEST CORNER OF THE PARENT PARCEL TO OLD DIXIE HIGHWAY(STATE ROAD 405).15. AS TO TABLE A OPTIONAL ITEM 15, THE ORTHO RECTIFIED PHOTO SHOWN ON THIS MAP WAS FLOWN FEBRUARY6, 2025. THE IMAGE IS SHOWN FOR INFORMATIONAL PURPOSES ONLY TO DEMONSTRATE THE CONDITIONS OF THEPROPOSED CREATED PARCEL AT THE TIME OF SURVEY.16. AS TO TABLE A OPTIONAL ITEM 16, NO EVIDENCE OF EARTHWORK OR CONSTRUCTION WAS OBSERVED ON THEPROPERTY.17. AS TO TABLE A OPTIONAL ITEM 17, THE SURVEYOR WAS NOT PROVIDED ANY INFORMATION INDICATINGCHANGES IN RIGHT OF WAY LINES.18. AS TO TABLE A OPTIONAL ITEM 18, THE OFFSITE EASEMENTS LISTED IN THE TITLE COMMITMENT ARE SHOWN ONTHIS MAP.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- Landscaping & Lawn Service
- 13. AS TO TABLE A OPTIONAL ITEM 13, THE NAMES OF ADJOINING PARCEL OWNERS ARE SHOWN ON THIS MAP.14 AS TO TABLE A OPTIONAL ITEM 14, THE DISTANCE TO THE NEAREST INTERSECTING STREET ON DAIRY ROAD ISAPPROXIMATELY 365' SOUTHWEST OF THE NORTHWEST CORNER OF THE PARENT PARCEL TO OLD DIXIE HIGHWAY(STATE ROAD 405).15. AS TO TABLE A OPTIONAL ITEM 15, THE ORTHO RECTIFIED PHOTO SHOWN ON THIS MAP WAS FLOWN FEBRUARY6, 2025. THE IMAGE IS SHOWN FOR INFORMATIONAL PURPOSES ONLY TO DEMONSTRATE THE CONDITIONS OF THEPROPOSED CREATED PARCEL AT THE TIME OF SURVEY.16. AS TO TABLE A OPTIONAL ITEM 16, NO EVIDENCE OF EARTHWORK OR CONSTRUCTION WAS OBSERVED ON THEPROPERTY.17. AS TO TABLE A OPTIONAL ITEM 17, THE SURVEYOR WAS NOT PROVIDED ANY INFORMATION INDICATINGCHANGES IN RIGHT OF WAY LINES.18. AS TO TABLE A OPTIONAL ITEM 18, THE OFFSITE EASEMENTS LISTED IN THE TITLE COMMITMENT ARE SHOWN ONTHIS MAP.
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 13. warranty deed 15260950
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2. Aerospace_Manufacturing_Ord Ver5
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Building & Industrial Supply
- Engineering & Architecture
- 2. All answers to the questions in said application and all surveys and/or site plans and data
- 2. Applicant/ Owner
- 2. Approve the CUP with conditions.
- 2. The general location and size of all existing and proposed structures and parking
- 2. Warranty Deed
- 3. All required landscaping, buffering, or screening.
- 3. Applicant Status Owner Tenant Agent Other
- 3. Deny the CUP.
- 3. Notarized Owner Authorization Form (If applicable)
- 3. Should this application be granted, I understand that any condition(s) imposed upon the granting
- 3. Survey
- 4. DETERMINATION OF A QUORUM
- 4. DETERMINATION OF A QUORUM
- 4. General location of ingress and egress to the property
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. I understand that I must attend all applicable meetings and have been informed of the meeting
- 4. Legal Description (from a certified survey in Microsoft Word format)
- 4. Maps
- 4. Parcel ID Tax Acct.
- 5. Certified Survey (sealed and containing permanent reference points as described
- 5. I understand that my request if approved does not encumber provision of utility, road or other City
- Legal Services
- 5. Site Plan w/ Aerial
- 5. Site Size (Attach Legal
- 6. Conceptual Site Plan (minimum 24” x 36”) in hardcopy or electronic in PDF format.
- 6. Current Land Uses
- 6. QUASI-JUDICIAL CONFIRMATION PROCEDURES
- 6. QUASI-JUDICIAL CONFIRMATION PROCEDURES
- 6. Site Plan w/ No Aerial
- 7. Blackfin Owner Authorization Kim Rezanka
- 7. Current Designation
- 7. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- 7. PETITIONS AND REQUESTS FROM THE PUBLIC PRESENT
- 8. Building Status
- 8. OLD BUSINESS
- 8. OLD BUSINESS
- 8. Pre-Application Meeting Date:
- 9. Completed Concurrency Application
- 9. Operating Schedule
- 9. Owner Authorization Form
- A. Aerospace and light manufacturing ordinance
- Legal Services
- Engineering & Architecture
- General Contractor
- Machinery & Metalwork
- A. Aerospace and light manufacturing ordinance
- Legal Services
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- A. Conditional Use Permit (CUP) No. 9-2025, Parcel ID # 21-35-28-00-279
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- A. Conditional Use Permit (CUP) No. 9-2025, Parcel ID # 21-35-28-00-279
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- A. May 20, 2026, regular meeting minutes
- A. May 20, 2026, regular meeting minutes
- LLC. Ms. Rezanke provided a twenty -four (24) page handout to the Planning & Zoning Commission.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a. A conditional use permit shall be required when the future land use designation is
- a. A conditional use permit shall be required when the future land use designation is
- a. A conditional use permit shall be required when the future land use designation is
- a. A conditional use permit shall be required when the future land use designation is
- a. A conditional use permit shall be required when the future land use designation is
- a. On main thoroughfares shall have liner buildings lining the first and second
- a. Shall be free of all obstructions of view from the adjacent street to the main store windows giving
- a. Shall be free of all obstructions of view from the adjacent street to the main store windows giving
- a. Shall be processed as a conditional use permit for any use which the Administrator
- a. Shall be processed as a conditional use permit for any use which the Administrator
- a. Shall be processed as a conditional use permit for any use which the Administrator
- a. Shall be processed as a conditional use permit for any use which the Administrator
- a. Shall be processed as a conditional use permit for any use which the Administrator
- a. Shall be required to proceed through the conditional use permit process when
- a. Shall have hours of operation limited to 6:00 a.m. to 10:00 p.m.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a. Shall have hours of operation limited to 6:00 a.m. to 10:00 p.m.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Building Materials & Garden Supply
- Government Authority
- a. Shall not allow any outdoor display of merchandise.
- a. Shall not allow any outdoor display of merchandise.
- a. Shall not be issued a business tax receipt until a license has first been obtained
- a. Shall require all gasoline pumps, tanks, vents, pump islands, and pump island canopies to
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Signage & Printing
- b. Minimum lot size: One (1) acre.
- b. Minimum lot size: One (1) acre.
- b. Minimum lot size: One (1) acre.
- b. Minimum lot size: One (1) acre.
- b. Minimum lot size: One (1) acre.
- b. Shall have appropriate security systems to include, but not be limited to, the following:
- b. Shall have appropriate security systems to include, but not be limited to, the following:
- b. Shall not allow any accessory office, accessory commercial outlet and/or
- Engineering & Architecture
- Real Estate Development
- General Contractor
- b. Shall not allow any accessory office, accessory commercial outlet and/or
- Legal Services
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- b. Shall not allow any accessory office, accessory commercial outlet and/or
- b. Shall not allow any accessory office, accessory commercial outlet and/or
- b. Shall not be issued a business tax receipt until a license has first been obtained
- b. Shall not have vehicular entrances to parking lots, garages, and parking
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- b. Shall prohibit all outdoor display of merchandise.
- b. Shall provide a passenger drop-off zone adjacent to the facility providing clear
- c. Manufacturing, assembly and fabrication activities shall be located no closer than
- c. Manufacturing, assembly and fabrication activities shall be located no closer than
- c. Manufacturing, assembly and fabrication activities shall be located no closer than
- c. Manufacturing, assembly and fabrication activities shall be located no closer than
- c. Manufacturing, assembly and fabrication activities shall be located no closer than
- c. Shall not have as a part of its operation coin operational amusement devices.
- c. Shall not have as a part of its operation coin operational amusement devices.
- c. Shall provide a landscape buffer in accordance with Chapter 31, Article III,
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- c. Shall require off-street loading spaces which are provided for the delivery of materials,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- c. Shall set back all structures, playgrounds, and outdoor recreation areas a
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- c. Supporting commercial and/or restaurant uses shall be located within the front area
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Full-Service Restaurant
- Quick-Service Restaurant
- c. Supporting commercial and/or restaurant uses shall be located within the front area
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Full-Service Restaurant
- c. Supporting commercial and/or restaurant uses shall be located within the front area
- c. Supporting commercial and/or restaurant uses shall be located within the front area
- General Contractor
- Real Estate Development
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Lighting & Low-Voltage Systems
- d. Shall have all gasoline or other fuel pumps supported by a dedicated standby generator to ensure
- Electrical
- Utilities (Sub)
- d. Shall require additional buffering between industrial uses and residentially used or
- d. Shall require additional buffering between industrial uses and residentially used or
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- d. Shall require additional buffering between industrial uses and residentially used or
- d. Shall require additional buffering between industrial uses and residentially used or
- d. Shall set back all structures, playgrounds, and outdoor recreation areas a
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- e. Shall not allow demolition debris sites.
- e. Shall not allow demolition debris sites.
- e. Shall not allow demolition debris sites.
- e. Shall not allow demolition debris sites.
- e. Shall provide a passenger drop-off zone adjacent to the facility providing clear
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- f. Shall not allow junkyards and salvage yards or sites.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Carpentry & Cabinetry
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- f. Shall not allow junkyards and salvage yards or sites.
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- HVAC & Climate Control
- Plumbing
- Concrete & Masonry
- Painting & Flooring
- Drywall & Insulation
- Carpentry & Cabinetry
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- f. Shall not allow junkyards and salvage yards or sites.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Engineering & Architecture
- Building & Industrial Supply
- f. Shall not allow junkyards and salvage yards or sites.
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- HVAC & Climate Control
- Concrete & Masonry
- Engineering & Architecture
- Building & Industrial Supply