Skip to main content

Sé el Primero, Construye Relaciones Duraderas

3. Buildable Panel Trench Box System Brochure.

City Council · 2026-06-16 · agenda_item

The City of West Melbourne is planning a repair to a 10-inch sanitary force main located at The Luminary Apartments, Palm Crossing. This project involves excavating to expose the damaged pipe, which shows signs of damage from an excavator bucket. The repair will include replacing a section of the force main and installing an insert-a-valve upstream of the leak to allow for the repair without shutting down six upstream lift stations. The work is currently under review by the City Council, with a recommendation to award the contract to Danus Utilities for the excavation and repair, and Florida Flow Control for the insert-a-valve installation. This project will involve site clearing, excavation, underground utility work for the force main repair and valve installation, and potentially dewatering and pumping services for the lift stations. Local contractors, suppliers, and service providers in utility construction, excavation, and plumbing trades can find opportunities by engaging early before final bids and permits are settled.

10-inch sanitary force main
10 inch
Total cost
65,659.00 $
excavate and expose the 10” force main
49,989.00 $
installation
15,670.00 $

Industries that could win this work

  • General Contractor
  • Site Prep, Grading & Hardscape
  • Plumbing
  • Utilities (Sub)

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta