EDAB-pkt-2026-04-14
Economic Development Advisory Board Regular Meeting · 2026-04-14 · agenda_packet
The Economic Development Advisory Board held a regular meeting on April 14, 2026. The agenda included an update on the "Econ Dev Commercial Performance Report" and the "Winter Park Business Academy Update." The "W. Fairbanks Guidance Language" was tabled from the March meeting for discussion and potential recommendation. An "Incentives Discussion" was also on the agenda, focusing on large-scale and small-scale packages mirroring best practices from peer municipalities. The meeting also covered "Staff Updates" and "Upcoming Agenda Items."
Agenda items
- 1. 4-16-26 WPBA Inbox Domination v2
- 1. Connect to the City sewer system when service becomes available
- 1. Connection Cost Assistance
- Plumbing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 1. Confirm Eligibility
- 1. Economic_Development_Subcommittee_Statement___Guiding_Principles_DRAFT_V1.1
- Business Consulting
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Government Authority
- 1. Our quality of life through the city’s charm and character is our competitive advantage.
- 1. Property Overview - Park Ave 2 - Mar 1, 2026 - Mar 31, 2026
- 1. Septic to Sewer Conversion Program- Guidelines_DRAFT
- 1. What is it that we want?
- 2. Act as fiscal stewards in growing the tax base to meet our needs (to support Quality of
- 2. Catalyst Development Program (CDP) Guidelines_DRAFT
- Plumbing
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 2. EDAB Commercial Performance Report_April 2026
- Real Estate Development
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Commercial Brokerage
- 2. Properly abandon existing septic systems in accordance with regulations
- 2. Reduced or Waived Fees
- 2. Submit an application
- 2. What are the focus points for investment?
- 3. Attract targeted businesses and workforce that is resilient, offer opportunity, and
- 3. Construction Support
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 3. Design & Permitting
- 3. Obtain all required permits and inspections
- 3. What types of incentives and policies spark intentions?
- 4. Complete connection within the specified timeframe (typically 6–18 months after
- 4. Construction & Connection
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Utilities (Sub)
- 4. Expedited Permitting
- 4. Maintain the city as a regional partner and player while sustaining the city’s scale and
- 5. Embrace and leverage our location education institutions for a hirable, talented
- 5. Non-Action Items
- 5. Redevelopment Incentives
- Plumbing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 6. Coordinate with city departments and regional efforts on the linkage between availability of
- Business Consulting
- Engineering & Architecture
- Real Estate Development
- Residential Brokerage
- Office & Business Support Services
- 7. Winter Park is a welcoming city that strives for inclusivity and sustainability as a
- Business Consulting
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- W. Fairbanks Guidance Language
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a. Econ Dev Commercial Performance Report
- a. Econ Dev Commercial Performance Report 5 minutes
- a. Econ Dev Commercial Performance Report 5 minutes
- a. Incentives Discussion
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Engineering & Architecture
- Real Estate Development
- a. Incentives Discussion 30 minutes
- a. Incentives Discussion 30 minutes
- a. W. Fairbanks Guidance Language 20 minutes
- a. W. Fairbanks Guidance Language 20 minutes
- a. West Fairbanks Guidance Language
- Legal Services
- Engineering & Architecture
- b. Winter Park Business Academy Update
- b. Winter Park Business Academy Update 5 minutes
- b. Winter Park Business Academy Update 5 minutes
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta