3. The final design must maximize separation from the Buffalo River. No SSTS component may be

Board of Adjustment Meeting · 2026-07-21 · agenda_item

This item concerns a proposed project requiring a minimum 100-foot setback from the OHWL (Ordinary High Water Level) of the Buffalo River for any onsite sewage treatment system (SSTS) component. If field checks reveal a smaller setback than what the Board approves, the design will need to be changed or brought back to the Board for more review. This project is currently under review by the Board of Adjustment. The work would involve site assessment to verify setbacks, followed by design and installation of an SSTS, potentially including site clearing, grading, and underground utility work. Contractors specializing in site prep, grading, concrete, plumbing, and environmental services could find opportunities. Early engagement is advised as plans are still being developed.

setback distance
100 feet

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Plumbing
  • Engineering & Architecture
  • Business Consulting
  • Utilities (Sub)
  • Pest Control

Follow this across meetings

Locations

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta