Skip to main content

Sé el Primero, Construye Relaciones Duraderas

4. Staff Analysis

Board of Adjustment Meeting · 2026-07-21 · agenda_item

This item concerns a proposed upgrade to the sewage treatment system (SSTS) for an existing rural residence located on a 1.5-acre parcel. The property is situated near the Buffalo River and is subject to flood hazard areas and a dike. The current proposal aims to add treatment capacity for the existing dwelling, not to increase the number of homes or density on the property. The project is currently under review by the Clay County Board of Adjustment. The work would involve site preparation for the new SSTS, including excavation and installation of a replacement tank and drainfield components. This process will require careful coordination due to the proximity of the river, floodplains, and existing structures. Local contractors specializing in site preparation, grading, concrete work, plumbing, and landscaping could find opportunities. Engaging early is advisable as the project is in the review phase, before final site plans, bids, and permits are settled, offering a chance to influence project details and secure future work.

parcel size
1.5 acre
OHWL setback
150 foot
proposed laterals
4 new 50-foot laterals
total lateral length
200 linear feet
river proximity
125 feet
existing tank size
1,500 gallon
added drainfield
200 linear feet
bedrooms
three bedrooms
additional basement bedrooms
two basement bedrooms
total bedrooms
five total bedrooms

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Plumbing
  • Engineering & Architecture

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta