4. Staff Analysis
Board of Adjustment Meeting · 2026-07-21 · agenda_item
This item concerns a proposed upgrade to the sewage treatment system (SSTS) for an existing rural residence located on a 1.5-acre parcel. The property is situated near the Buffalo River and is subject to flood hazard areas and a dike. The current proposal aims to add treatment capacity for the existing dwelling, not to increase the number of homes or density on the property. The project is currently under review by the Clay County Board of Adjustment. The work would involve site preparation for the new SSTS, including excavation and installation of a replacement tank and drainfield components. This process will require careful coordination due to the proximity of the river, floodplains, and existing structures. Local contractors specializing in site preparation, grading, concrete work, plumbing, and landscaping could find opportunities. Engaging early is advisable as the project is in the review phase, before final site plans, bids, and permits are settled, offering a chance to influence project details and secure future work.
- parcel size
- 1.5 acre
- OHWL setback
- 150 foot
- proposed laterals
- 4 new 50-foot laterals
- total lateral length
- 200 linear feet
- river proximity
- 125 feet
- existing tank size
- 1,500 gallon
- added drainfield
- 200 linear feet
- bedrooms
- three bedrooms
- additional basement bedrooms
- two basement bedrooms
- total bedrooms
- five total bedrooms
Industries that could win this work
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Engineering & Architecture
Follow this across meetings
Locations
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta