Skip to main content

Sé el Primero, Construye Relaciones Duraderas

4. The installation must be substantially consistent with the approved concept of replacing the tank and

Board of Adjustment Meeting · 2026-07-21 · agenda_item

This item concerns a planned project to replace an existing tank and add four 50-foot laterals. The project must be consistent with an approved concept or a revised design that offers equal or greater protection for the Buffalo River. The revised design requires approval from Environmental Health and Planning & Zoning. This project is currently under review. The work would likely involve site preparation, underground utility connections for the laterals, and the installation of the new tank. Depending on the final design, there may also be excavation, concrete work, and final site restoration. Local contractors, suppliers, and service providers should consider reaching out to the applicant or relevant county departments to understand the project details and potential opportunities as the review process moves forward.

lateral length
4 50-foot laterals

Industries that could win this work

  • General Contractor
  • Plumbing
  • Site Prep, Grading & Hardscape
  • Utilities (Sub)
  • Engineering & Architecture
  • Building & Industrial Supply

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta