13. Operator shall post a reclamation bond of $40,000 ($1,000 per acre) and reclaim mined-out areas as

Planning Commission Meeting · 2026-06-23 · agenda_item

The Clay County Planning Commission is reviewing a proposal that includes the introduction of data centers within the county. This presentation covered the history and types of data centers, including enterprise, hyperscale, colocation, and edge/modular facilities. These centers require significant support systems such as reliable power, network connectivity, cooling, and safety measures. The review process involves considering utility capacity, water use, noise, backup power, fire access, screening, and setbacks. Potential benefits include a new tax base and construction spending, though permanent job creation is not expected to be high. This item is currently under review, with the Planning Commission considering standards for future permitted data centers. The project scope could involve site preparation, utility upgrades, construction of specialized buildings, and installation of complex electrical and cooling systems. Contractors, suppliers, and service providers in construction, electrical, plumbing, HVAC, and IT infrastructure may find opportunities as these projects develop. Early engagement is advised before final site plans and permits are established.

reclamation bond
40000 $
reclamation bond per acre
1000 $
slope
4 H:1V
enterprise facility
1 to 10 megawatts
colocation or regional facility
10 to 100 megawatts
hyperscale/AI campus
100 + megawatts
electricity consumption by data centers in 2014
1.8 %
projected electricity consumption by data centers by 2028
6.7 to 12%
electricity consumption of a 250 MW center compared to homes
203000 homes
water consumption of a 250 MW center
482 million gallons per year
solar infrastructure
50 MW
feedlot animal units
999 AU
feedlot expansion
700 AU
hoop barn height
70 foot
hoop barn height
50 foot
feedlot setback from property lines
100 feet
feedlot setback from neighboring residential dwelling
1320 feet
feedlot setback from neighboring residential dwelling
1/4 mile
feedlot setback from incorporated community
1 mile
feedlot setback from platted subdivision
1320 feet
feedlot setback from platted subdivision
1/4 mile
feedlot setback from churches and schools
2640 feet
feedlot setback from churches and schools
1/2 mile
feedlot setback from protected waters / protected wetlands
1000 feet
feedlot setback from stream or river
300 feet
feedlot setback from wetlands types 3, 4, and 5
300 feet
feedlot setback from road right-of-way
125 feet
manure storage setback from water-supply well
100 feet
feedlot runoff setback from water-supply well
100 feet
manure stockpile setback from water-supply well
100 feet
manure storage days
365 days
land application acres
1343.6 acres
manure storage area width
28 foot
environmental review threshold
1000 AU
environmental review threshold in sensitive area
500 AU
meeting date
June 23rd, 2026
meeting time
8:15 PM

Industries that could win this work

  • General Contractor
  • Electrical
  • HVAC & Climate Control
  • Plumbing
  • Site Prep, Grading & Hardscape
  • Building & Industrial Supply
  • Engineering & Architecture
  • IT Services & Cybersecurity
  • Utilities (Sub)

Follow this across meetings

Mira los negocios reales detrás de estos números

Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.

Crea tu cuenta