Proposed agenda Changes
Board of County Commissioners Meeting · 2026-06-09 · other
[case Agreement No. 23-8063 (for Item 16F1)] Item 10A: Recommendation for an update on continuing efforts for a Controlled Recognized Environmental Condition (CREC) on the site of the proposed State Veterans Nursing Home. This item is a request from Commissioner Saunders and is not to be heard before 11 AM. Item 16F1: Recommendation to close out the Collier County Sheriff's Office Marco Substation Seawall and Dredge construction contract with Blue Marlin Marine Construction & Services, Inc., under Agreement No. 23-8063, and to approve the release of retainage. This is a staff request to continue the item to a future meeting. Items 9B & 11C: Recommendation to approve the Ave Maria SRA Expansion and Amended Developer Agreement, to be heard at the conclusion of all Action Items on the Regular Agenda.
Agenda items
- 1. 6NC0432A - 5945 Everglades Blvd N – Milestone Towers
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. ALL TELECOMMUNICATIONS TOWERS (TOWERS), ANTENNAS, AND EQUIPMENT SHALL COMPLY WITH THE COLLIER COUNTY COMPREHENSIVE PLAN
- General Contractor
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 1. All cast in place concrete shall be mixed and placed in accordance with the requirements of ACI 318 and ACI 301, and shall h ave a 28 day minimum compressive
- 1. Alternative Tower Structure means manmade trees, clock towers, bell towers, steeples, light
- General Contractor
- Concrete & Masonry
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Building & Industrial Supply
- 1. Consistency with the LDC and Growth Management Plan.
- 1. Consistency with the LDC and Growth Management Plan. The proposed Tower meets or
- 1. General standards applicable to all types of wireless communication facilities.
- 1. Section 2.03.01 B.1.c.12 of the LDC permits communication towers as conditional uses,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- 1. Staff Report - Vand II Tower CU (CCPC)
- 1. Supplemental tower application requirements.
- 1. T
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Construction (Other)
- Engineering & Architecture
- 1. Table 1. Identifies the type of wireless communication facility and where it is allowed, either as
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 1. The parcel shall be a minimum 2.25 acres and adjacent to an arterial or collector road. The parent
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 11. County Manager's Report
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Concrete & Masonry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 11. County Manager's Report
- 14. Airport Authority and/or Community Redevelopment Agency
- 14. Airport Authority and/or Community Redevelopment Agency
- 15. Staff and Commission General Communications
- 15. Staff and Commission General Communications
- 16. Consent Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Concrete & Masonry
- Electrical
- Construction (Other)
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- 16. Consent Agenda
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- 17. Summary Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 17. Summary Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 2) all specific requirements for the individual Conditional Use will be met; and 3) satisfactory
- 2. 6NC0405A – 3147 31st. Ave. NE - Vertical Bridge
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- 2. Agenda and Minutes
- 2. Agenda and Minutes
- 2. Att A - Resolution - Vand II Tower CU (CCPC)
- 2. Each new communication tower must be designed and constructed so that in the event a tower falls it will collapse only within the property lines of the lot on which the
- Engineering & Architecture
- General Contractor
- Construction (Other)
- 2. Ingress and egress to property and proposed structures thereon with particular reference to
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 2. Ingress and egress to property and proposed structures thereon with particular reference to automotive and
- 2. N
- 2. Standards applicable to all towers.
- 2. THE TOWER WILL BE DESIGNED AT A MAXIMUM HEIGHT OF 150 FEET ABOVE GROUND LEVEL.
- 2. The wireless communication services provider has provided evidence that the service provider's
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Construction (Other)
- Engineering & Architecture
- 3. 6NC1201B – 1589 Everglades Blvd. N. – Vertex Towers (Subject of this Document)
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 3. A copy of each application for a WCF that is greater than 150 feet in height shall be supplied by the
- 3. ALL NEW TOWER BASES, GUY ANCHORS, OUTDOOR EQUIPMENT, ACCESSORY BUILDINGS, AND ACCESSORY STRUCTURES SHALL BE FENCED.
- 3. All reinforcing steel shall conform to ASTM 615 grade 60, deformed billet steel bars. Welded wire fabric reinforcing shall c onform to ASTM A185.
- 3. Att B - RF Package -Vand II Tower CU (CCPC)
- 3. Ingress and egress to the property and proposed structures thereon, with particular
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- 3. Standards applicable to all rooftop or building mounted facilities. Section not applicable.
- 3. T
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 3. The effect the conditional use would have on neighboring properties in relation to noise, glare,
- General Contractor
- Concrete & Masonry
- Electrical
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 3. The effect the conditional use would have on neighboring properties in relation to noise, glare, economic or
- 4. 6NC0431A – 1680 Golden Gate Blvd. – Vertical Bridge
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 4. Att C - Applicant Backup - Vand II Tower CU (CCPC)
- 4. Compatibility with adjacent properties and other property in the district.
- Electrical
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Legal Services
- Government Authority
- 4. Compatibility with adjacent properties and other property in the district. Vertex is proposing a
- General Contractor
- Concrete & Masonry
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 4. Proclamations
- 4. Proclamations
- 4. Relief from design and development standards. An applicant requesting a Conditional Use may
- Legal Services
- Engineering & Architecture
- 4. TOWER LIGHTING. TOWERS AND ANTENNAS WITH A HEIGHT GREATER THAN 150 FEET SHALL BE REQUIRED TO HAVE RED BEACON OR DUAL MODE
- Lighting & Low-Voltage Systems
- Government Authority
- Engineering & Architecture
- Legal Services
- 4. The effect the Conditional Use would have on neighboring properties in relation to
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- Building & Industrial Supply
- 5. Att D - NIM Documentation (CCPC)
- 5. Compatibility with adjacent properties and other properties in the district.
- General Contractor
- Site Prep, Grading & Hardscape
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 5. Presentations
- 5. Presentations
- 5. THE TOWER AND ANTENNAS MUST MEET THE RADIATION EMISSION STANDARDS SET BY THE FCC.
- 6. COLLOCATION. THE TOWER SHALL BE DESIGNED TO ACCOMMODATE THE FUTURE ANTENNAS OF FOUR (4) WIRELESS TELECOMMUNICATIONS CARRIERS
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Security & Fire Systems Installation
- 6. Public Petitions
- 6. Public Petitions
- 7. Ad Publication Confirmation (CCPC)
- 7. PARKING AND TRAFFIC. TRAFFIC TO THE TOWER SITE IS APPROXIMATELY ONE TRIP PER CARRIER PER MONTH. AREAS SUFFICIENT FOR THE
- Site Prep, Grading & Hardscape
- Construction (Other)
- Landscaping & Lawn Service
- 8. Board of Zoning Appeals
- General Contractor
- Concrete & Masonry
- Electrical
- Engineering & Architecture
- Building & Industrial Supply
- Waste Management
- Government Authority
- 8. Board of Zoning Appeals
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Waste Management
- Government Authority
- 8. Sign Affidavit - Vand II Tower CU (CCPC)
- 8. TOWER THAT IS VOLUNTARILY NOT USED FOR COMMUNICATIONS FOR A PERIOD OF 180 DAYS, AS DETERMINED BY COLLIER COUNTY, SHALL BE
- 9. Advertised Public Hearings
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- Landscaping & Lawn Service
- 9. Advertised Public Hearings
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- 9. Legal Ad - BCC 06_09_2026 - Vanderbilt II Tower PL20250007107
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Building & Industrial Supply
- Engineering & Architecture
- 9. UTILITIES. TOWER SHALL NOT REQUIRE ANY WATER, WASTEWATER, OR SOLID WASTE DISPOSAL.
- A. Draft Resolution
- B. Radio Frequency (RF) Justification Package
- C. Applicant’s Backup Material
- D. Definitions specific to LDC section 5.05.09.
- D. Findings. The Planning Commission shall make a recommendation of approval, approval with
- D. NIM Documentation
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- E. Table of allowable wireless communication facilities by zoning district.
- F. Design and development standards.
- G. Publicly owned property. Section not applicable.
- H. Wireless communication facilities in the Estates (E) Zoning District. Wireless communication facilities
- Electrical
- Lighting & Low-Voltage Systems
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Waste Management
- Government Authority
- I. Application requirements in addition to the requirements of LDC section 10.02.00.
- ID: 40579760006. The total parent parcel is approximately 2.65 acres MOL (according to the Collier County
- General Contractor
- Concrete & Masonry
- Electrical
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- J. Inspections… Vertex shall comply with this section, as necessary.
- K. Abandonment. Vertex shall comply with this section, as necessary.
- N. Higgins, Inc., for the Northeast Water Reclamation Facility Deep Injection Well Equipping
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Government Authority
- N. Higgins, Inc., for the Northeast Water Reclamation Facility Deep Injection Well Equipping
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- a. Any new WCF or modification to an existing WCF that requires both a Site Development Plan
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- a. Co-location of antennas on towers.
- a. Evidence from a Radio Frequency Engineer that the proposed facilities cannot be
- General Contractor
- Electrical
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- a. Evidence from a Radio Frequency Engineer that the proposed facilities cannot be installed
- a. For links (roadway segments) directly accessed by the project where project traffic is
- a. The parcel is a minimum 2.25 acres and adjacent to an arterial or collector road.
- b. For links adjacent to links directly accessed by the project where project traffic is
- b. Height limitations. Towers shall be subject to the height limitations outlined in Table 2...
- General Contractor
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- b. If co-location is not available, the applicant shall submit an affidavit stating that the
- b. If co-location is not available, the applicant shall submit an affidavit stating that the
- b. Setbacks. Except as otherwise specified within this section, wireless communication
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- b. The wireless communication facility provider has provided evidence that the service
- General Contractor
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- c. For all other links the project traffic is considered to be significant up to the point
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Landscaping & Lawn Service
- Building & Industrial Supply
- c. Security.
- d. Migratory birds and other wildlife considerations.
- d. Signage.
- e. Design. Towers, excluding alternative tower structures, shall maintain a galvanized gray
- Construction (Other)
- Painting & Flooring
- e. Emergency backup generators. An emergency backup generator is required to be operated
- Electrical
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- f. Lighting.
- f. Prohibition. No equipment or materials shall be stored or parked on the site of a wireless
- g. Screening.
- h. Landscaping. A minimum 10-foot wide Type A buffer that includes a 3-foot high, continuous
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Nursery & Horticulture
- Building & Industrial Supply
- i. A tower owner shall permit other wireless communication service providers to co
- General Contractor
- Concrete & Masonry
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- i. Access and parking. Each wireless communication facility site shall have access from a
- i. All wireless communication facilities and support facilities shall be secured to prevent
- i. Insufficient height to allow the WCF to function reasonably in parity with similar
- i. No signals, lights, or illumination on towers shall be permitted unless required by the
- Construction (Other)
- i. Signage must be provided that includes contact information for the WCF. Such signage
- Site Prep, Grading & Hardscape
- General Contractor
- Signage & Printing
- i. Wireless communication facilities shall be screened with a wall or fence. The wall or
- Site Prep, Grading & Hardscape
- General Contractor
- Security & Fire Systems Installation
- Building & Industrial Supply
- i. Wireless communication facility towers. Each new tower that will exceed a height of 75
- General Contractor
- Construction (Other)
- Engineering & Architecture
- Government Authority
- ii. Bird diverter devices. Each guyed tower greater than 75 feet in height above natural
- Electrical
- Construction (Other)
- Government Authority
- ii. Equipment cabinets. The overall height of ground-mounted equipment or equipment
- Site Prep, Grading & Hardscape
- Electrical
- Lighting & Low-Voltage Systems
- ii. Insufficient structural strength to support the WCF;
- ii. No commercial signs or advertising shall be allowed. Vertex is not proposing any
- ii. Security lighting to protect on-ground facilities/equipment shall be fully shielded and
- ii. Site lighting (not required by FAA) shall be elevated less than 20 feet above grade, fully
- Lighting & Low-Voltage Systems
- Engineering & Architecture
- ii. Towers shall be constructed to accommodate the minimum number of providers
- General Contractor
- Lighting & Low-Voltage Systems
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- Waste Management
- iii. Habitat loss. In addition to the requirements in Chapter 3, towers and support facilities
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- iii. Insufficient space to allow the WCF to function effectively and reasonably in parity
- iv. Resulting electromagnetic interference which cannot reasonably be corrected;
- v. Unavailability of a reasonable leasing agreement; and/or
- vi. Other limiting factors.
- General Contractor
- Concrete & Masonry
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta