Board of County Commissioners Meeting: junio de 2026
Collier County
b. If co-location is not available, the applicant shall submit an affidavit stating that the
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
b. If co-location is not available, the applicant shall submit an affidavit stating that the
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
b. Setbacks. Except as otherwise specified within this section, wireless communication
This item concerns proposed setback requirements for wireless communication facilities, specifically an alternative tower structure. The proposed tower height is 150 feet, with calculated setbacks of 75 feet. Site plans, specifically Sheet A-1, illustrate these setbacks, including those related to a reserved public right-of-way for the expansion of Everglades Boulevard North. This matter is currently under review by the Board of County Commissioners. The project involves establishing specific setback distances which will guide future construction. This could lead to work related to site planning, civil engineering, and potentially construction if a facility is approved. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final site plans, bids, and permits are settled could provide a competitive advantage for future work related to this infrastructure development.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Everglades Boulevard North
- Applicant:
- Vertex
b. The wireless communication facility provider has provided evidence that the service
A wireless communication facility provider is proposing to build a new tower in the Estates Zoning District. The provider states that the tower must be placed in this specific area to meet coverage needs and cannot be placed on an existing tower. A service coverage analysis was done within a 1.5-mile radius, showing no existing structures are tall enough to fix service gaps. This item is currently under review by the Board of County Commissioners. The project would involve site preparation, tower construction, and installation of related equipment. This early stage presents an opportunity for contractors, suppliers, and service providers to engage before bids and permits are finalized.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Estates Zoning District
c. For all other links the project traffic is considered to be significant up to the point
A conditional use is under review for the Vanderbilt II Communication Tower, proposed for a 2.65-acre site. The project involves constructing a communication tower, with a condition requiring the owner to reserve 32 feet along Everglades Boulevard for future road expansion. The site currently has native vegetation, and 10% of this area, or 0.265 acres, must be preserved. The project is currently under review by the Board of County Commissioners, with staff recommending approval. This project would involve site preparation, including clearing and grading, followed by the installation of the tower structure and any necessary underground utilities. Final landscaping and fencing would be completed later. Local contractors, suppliers, and service providers should consider reaching out early to understand the project's scope and potential needs as plans develop, before final bids and permits are issued.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Decision:
- Board of County Commissioners
- Address:
- Everglades Boulevard
- Applicant:
- Vanderbilt II
c. Security.
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
d. Migratory birds and other wildlife considerations.
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
d. Signage.
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
e. Design. Towers, excluding alternative tower structures, shall maintain a galvanized gray
This item concerns a proposed design standard for towers, specifically requiring a galvanized gray finish or other approved color, unless federal rules dictate otherwise. The proposal is currently under review by the Board of County Commissioners. If approved, this standard would influence the appearance of future tower construction. The scope of work would involve the application of specified finishes during the construction phase of new towers. This early stage in the review process presents an opportunity for contractors specializing in metal finishing, painting, and related construction trades to engage with the project stakeholders. Early involvement can provide valuable insight into upcoming requirements and potential project needs.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
e. Emergency backup generators. An emergency backup generator is required to be operated
This item concerns a new requirement for emergency backup generators at wireless communication facility sites. The Site Development Plan must show the location and connection for these generators. Vertex has acknowledged this requirement. This is currently under review by the Board of County Commissioners. The project will involve site planning to identify generator locations and connections. This early stage presents an opportunity for contractors specializing in electrical work, site preparation, and potentially concrete services for generator pads. Suppliers of backup generators and related electrical components may also find opportunities. Reaching out now, before final site plans and permits are issued, allows businesses to understand the scope and prepare for potential work.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
f. Lighting.
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
f. Prohibition. No equipment or materials shall be stored or parked on the site of a wireless
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
g. Screening.
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
h. Landscaping. A minimum 10-foot wide Type A buffer that includes a 3-foot high, continuous
A landscaping requirement is under review for a project located in Collier County. The proposal mandates a minimum 10-foot wide buffer along the perimeter, featuring a 3-foot high hedge planted closely together. Trees within this buffer must be 12 feet tall when planted. Site plans show this buffer area. This item is currently under review by the Board of County Commissioners. The project will involve site preparation for buffer zones, including clearing and grading, followed by the installation of specified hedging and tree plantings. This early stage presents an opportunity for landscaping contractors, nursery suppliers, and site preparation services to engage with the project team before final plans and permits are issued. Early involvement can provide a competitive advantage.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Sheet C-3
- Applicant:
- Vertex
i. A tower owner shall permit other wireless communication service providers to co
Vertex is proposing to design a new wireless communication tower for T-Mobile, with space for three additional providers to co-locate their facilities. This project is currently under review by the Board of County Commissioners. If approved, the project would involve the construction of the tower and its compound. This could create opportunities for contractors involved in site preparation, concrete work, electrical installation, and general construction. Suppliers of building materials and wireless communication equipment may also find opportunities. Early engagement with Vertex before final site plans, bids, and permits are settled could provide a competitive advantage.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Decision:
- Board of County Commissioners, Collier County
- Applicant:
- Vertex
i. Access and parking. Each wireless communication facility site shall have access from a
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. All wireless communication facilities and support facilities shall be secured to prevent
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Insufficient height to allow the WCF to function reasonably in parity with similar
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. No signals, lights, or illumination on towers shall be permitted unless required by the
This item concerns a proposed tower that will not require lighting. Vertex has applied to the FAA for a Determination of No Hazard to Air Navigation and to not require lighting for the tower. The FAA has issued a Determination of No Hazard to Air Navigation, meaning marking and lighting are not necessary for aviation safety. Therefore, Vertex will not be installing any lighting on the proposed tower. This project is currently under review. The scope of work involves the construction of a tower, with the potential for site preparation and foundation work. As lighting is not required, this simplifies the construction process. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress as plans develop.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
i. Signage must be provided that includes contact information for the WCF. Such signage
This agenda item concerns proposed signage requirements for a Waste and Recycling Facility (WCF). The signage must display contact information for the WCF and be visible from the outside. Site Plans Sheet C-4 shows the proposed signage. This item is currently under review by the Board of County Commissioners. If approved, the project would involve the installation of new signage, likely including site preparation for placement, fabrication, and installation of the signs. Contractors specializing in signage, site preparation, and potentially general contracting could be involved. Reaching out to the relevant parties early, before final plans and permits are set, may offer an advantage for local businesses.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Site Plans Sheet C-4
i. Wireless communication facilities shall be screened with a wall or fence. The wall or
This notice is about a proposed change to wireless communication facility regulations in Collier County. The Board of County Commissioners is reviewing a plan that would require these facilities to be screened by a wall or fence. This fence must be 100 percent opaque, between 8 and 10 feet tall, and designed to prevent unauthorized access. Barbed wire will not be allowed. Vertex is proposing an eight-foot chain link fence with slats and a locked gate as an example. This item is currently under review by the county. If approved, this could lead to work involving site preparation, fence installation, and potentially security system upgrades for future wireless communication facilities. Contractors specializing in fencing, site preparation, and security systems may find opportunities. Early engagement with the county and the applicant could provide insight into specific project requirements as plans develop.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Sheet C-4
- Applicant:
- Vertex
i. Wireless communication facility towers. Each new tower that will exceed a height of 75
This item concerns proposed regulations for wireless communication facility towers. Specifically, new towers over 75 feet but not exceeding 199 feet above natural grade will not be allowed to be guyed. Vertex has stated they are not proposing a guyed tower and will comply with this section. This is currently under review by the Board of County Commissioners. If approved, this regulation could impact future tower construction, potentially requiring specialized engineering and construction methods for non-guyed towers. Contractors involved in tower construction, electrical work for communication equipment, and site preparation could be affected. Early engagement with the permitting and planning departments is advised.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
ii. Bird diverter devices. Each guyed tower greater than 75 feet in height above natural
This item concerns a proposed regulation for bird diverter devices on guyed towers taller than 75 feet. The regulation would require these devices to be installed and maintained on each guy wire. The applicant, Vertex, is not proposing to build a guyed tower, install guy wires, or add bird diverter devices. This item is currently under review by the Board of County Commissioners. If approved, the regulation would set standards for future tower construction and maintenance. This could create opportunities for contractors specializing in site preparation, electrical work, and specialized installations related to communication towers and safety equipment. Early engagement with the county and potential developers could provide insight into future compliance needs and related service demands.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
ii. Equipment cabinets. The overall height of ground-mounted equipment or equipment
This item concerns proposed regulations for ground-mounted equipment cabinets, limiting their overall height to 12 feet. These rules are intended to apply to future users who may share equipment space. The regulations are currently under review by the Board of County Commissioners. If approved, this could lead to the need for site preparation, installation of specialized cabinets, and potentially electrical and low-voltage system work. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Understanding these requirements early could provide an advantage when future site plans and permits are developed.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Sheet GN-1
ii. Insufficient structural strength to support the WCF;
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
ii. No commercial signs or advertising shall be allowed. Vertex is not proposing any
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
ii. Security lighting to protect on-ground facilities/equipment shall be fully shielded and
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
ii. Site lighting (not required by FAA) shall be elevated less than 20 feet above grade, fully
This agenda item concerns proposed site lighting regulations for future development. While the current applicant, Vertex, is not proposing any lighting improvements, their future collocators must follow specific rules. These rules state that any required site lighting must be less than 20 feet high, fully shielded, and directed away from nearby properties. This item is currently under review by the Board of County Commissioners. If approved, this could lead to future needs for electrical contractors specializing in low-voltage lighting systems and site preparation services for installation. Early engagement with the county and potential developers could provide insight into future project scopes.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
ii. Towers shall be constructed to accommodate the minimum number of providers
This item concerns a proposal for a new 150-foot tower in the Estates District. The applicant, Vertex, plans to construct this tower to support up to four collocations, which is within the district's maximum height limit of 185 feet. This project is currently under review by the Board of County Commissioners. If approved, the project would involve site preparation, tower erection, and the installation of telecommunications equipment. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the applicant before final plans and permits are issued. Reaching out now could provide an advantage in securing future work related to this development.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- Estates District
- Applicant:
- Vertex
iii. Habitat loss. In addition to the requirements in Chapter 3, towers and support facilities
This item concerns proposed regulations for tower and support facility construction, focusing on minimizing habitat loss and fragmentation. Vertex has designed a 150-foot alternative tower that will not be guyed or lighted, aiming to reduce migratory bird risk and impact on the existing parcel. The proposal is currently under review by the Board of County Commissioners. If approved, this project would involve site preparation, construction of the tower and support facilities, and potentially road access and fencing modifications. Contractors specializing in site prep, grading, concrete, electrical, and general construction could be involved. Suppliers of building materials and related services would also be needed. Engaging early in the review process allows businesses to understand the project scope and prepare for potential opportunities before final plans and permits are issued.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- Vertex
iii. Insufficient space to allow the WCF to function effectively and reasonably in parity
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
iv. Resulting electromagnetic interference which cannot reasonably be corrected;
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
v. Unavailability of a reasonable leasing agreement; and/or
Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
vi. Other limiting factors.
This item concerns the potential development of new wireless communication sites to improve coverage. T-Mobile has identified a need for new sites, stating that no existing structures in the area meet their coverage requirements. They are planning to pursue four new sites in partnership with tower companies. This project is currently under review. The work would likely involve site selection, permitting, construction of new tower foundations, installation of antennas and related equipment, and potentially underground utility connections. Contractors specializing in site preparation, concrete work, electrical installation, and general construction could be involved. Suppliers of construction materials and telecommunications equipment may also find opportunities. Engaging early could provide an advantage as plans and permits are developed.
- Board:
- Board of County Commissioners Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Applicant:
- T-Mobile
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta