1. Whether or not there are special conditions, not involving water depth, related to the subject
Hearing Examiner Meeting · 2026-05-28 · agenda_item
This agenda item concerns a proposed floating dock facility. The applicant is seeking approval for specific dimensions and placement of this dock. The property features a meandering rip rap revetment shoreline. The proposed dock requires an extension of at least 5 feet from the mean high water line to clear the rip rap, and the walkway is proposed at 6 feet wide. This proposal is currently under review by the Hearing Examiner. The project would involve marine construction, including the installation of the floating dock structure. Contractors specializing in marine construction, dock building, and potentially related site preparation or environmental mitigation services could find opportunities. Early engagement is advised as the project is in the review phase, before final plans and permits are issued.
- width of rip rap
- 10 feet
- width of rip rap extending water-ward
- 3-4 feet
- required extension from MHWL
- 5 feet
- walkway width
- 6 feet
- remaining space within protrusion limit
- 9 feet
- county's usual protrusion limit
- 20 feet
- proposed vessel length
- 33 LOA
- proposed vessel length
- 50 LOA
Industries that could win this work
- Construction (Other)
- Engineering & Architecture
Follow this across meetings
Mira los negocios reales detrás de estos números
Obtén los registros reales, con direcciones y directivos, respaldados por una garantía de reembolso de 14 días.
Crea tu cuenta